|
---|
Category:Letter
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, Extend Shield Building Completion Time After Refueling ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition 2024-09-06
[Table view] |
Text
August 4, 2011 Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
IMPLEMENTATION OF TRAVELERS TSTF-363, REVISION 0, REVISE TOPICAL REPORT REFERENCES IN ITS 5.6.5, COLR [CORE OPERATING LIMITS REPORT], TSTF-408, REVISION 1, RELOCATION OF LTOP [LOW-TEMPERATURE OVERPRESSURE PROTECTION] ENABLE TEMPERATURE AND PORV [POWER-OPERATED RELIEF VALVE] LIFT SETTING TO THE PTLR [PRESSURE-TEMPERATURE LIMITS REPORT], AND TSTF-419, REVISION 0, REVISE PTLR DEFINITION AND REFERENCES IN ISTS
[IMPROVED STANDARD TECHNICAL SPECIFICATION] 5.6.6, RCS
[REACTOR COOLANT SYSTEM] PTLR
Dear Members of the TSTF:
The purpose of this letter is to inform you of the U.S. Nuclear Regulatory Commission (NRC) staffs plan for resolving issues related to the subject travelers. The NRC staff previously communicated concerns to you via letters dated November 2 and December 11, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092151016 and ML093100498). Additionally, the plan outlined in this letter was discussed with you during a public meeting on February 9, 2011 (meeting summary is available in ADAMS at Accession No. ML110560630).
The NRC staff will no longer accept license amendment requests (LARs) to implement technical specification (TS) changes in accordance with Traveler TSTF-363. The standard TS (STS) in NUREGs-1430, -1431, -1432, -1433, and -1434 will be revised in Revision 4 to reflect the TS the way they were prior to approval of TSTF-363.
The NRC staff will continue to accept LARs to implement the TS changes in accordance with Travelers TSTF-408 and TSTF-419 with modification. Currently the STS show the full topical report or methodology citation as located in the PTLR. In order for NRC staff to approve LARs for these two travelers, the full topical report or methodology citation will need to be included in the TS, not in the PTLR. The STS in NUREGs-1430, -1431, -1432, -1433, and -1434 will be revised in Revision 4 to reflect this change.
The NRC staff understands that the inclusion of topical report or methodology citations in the COLR and PTLR afforded the industry flexibility and reduced the need for LARs associated with updated topical reports used during refueling. The NRC staff is willing to consider alternatives to the inclusion of the full citation in the TS, so long as the alternatives support the NRC staffs ability to protect the health and safety of the public and environment. However, until a mutually agreed upon alternative can be reached and approved, the full citations will need to be included in the TS for the reasons discussed below.
Maintaining a list of the methodologies in the TSs requires licensees to obtain NRC approval prior to editing the reference list. Among others, one reason that NRC approval is required prior
TSTF to editing the reference list is so that the NRC staff can review the methodology and ensure that it is applicable to the facility of a given licensee. Additionally, the NRC staff can verify that the licensee has properly satisfied all implementation conditions and limitations associated with a given methodology. Because there is no inherent requirement to ensure that the implementation conditions and limitations associated with methodology revisions are maintained the same as previous revisions to the same methodology, or that the applicability of subsequent methodology revisions remains the same as earlier methodologies, the NRC staff finds that affording licensees the administrative flexibility to transition between or among methodology revisions is inappropriate.
The NRC staff does not intend to backfit licensees that have these travelers already in their TS.
There is not a substantial increase in the overall protection of the public health and safety to be derived from backfitting licensees that have already adopted these travelers. A desire for additional clarity in the safety analysis is not indicative of an immediate safety concern.
Therefore, backfitting would not be justified under Title 10 of the Code of Federal Regulations Section 50.109 because the safety benefit is not supported by the financial costs. As a result, these changes will not impact plants that already have TSTF-363, or previous versions of TSTF-408 or TSTF-419, approved and implemented in their plant-specific TS.
As discussed during the February 9, 2011, meeting with the TSTF, this situation is irregular in that the NRC staff has never changed the STS NUREGs without that change being made as a result of a traveler. Therefore, we agreed to provide an opportunity for the TSTF to submit travelers to make these changes to the STS. The travelers would need to be submitted in a timely fashion to allow for them to be used as part of the STS Revision 4 which is currently in process.
If you have any questions, please contact Michelle Honcharik at (301) 415-1774 or michelle.honcharik@nrc.gov.
Sincerely,
/RA/
John R. Jolicoeur, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 753 cc: See next page
ML110660285 OFFICE PLPB/PM PLPB/LA ITSB/BC SRXB/BC NAME MHoncharik DBaxley RElliott AUlses DATE 3/11/11 3/10/11 3/18/11 3/24/11 OFFICE OGC PLPB/BC NAME MSmith JJolicoeur DATE 4/20/11 8/4/11 DISTRIBUTION for letter to TSTF dated August 4, 2011 :
PUBLIC PLPB Reading File RidsNrrAdro Resource RidsNrrDpr Resource RidsOgcMailCenter Resource RidsOpaMail Resource RidsAcrsAcnwMailCenterResource RidsNrrPMMHoncharik RidsNrrLADBaxley RidsNrrPlpbResource RidsNrrItsbResource RidsNrrSrxbResource Ulses, Anthony Chernoff, Harold Hughey, John Parks, Benjamin Grover, Ravinder
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Donald R. Hoffman E-mail: donaldh@excelservices.com Norman J. (Jack) Stringfellow Southern Nuclear Operating Company P.O. Box 1295 Birmingham, AL 35201-1295 E-mail: string@southernco.com Roy A. (Tony) Browning Duane Arnold Energy Center 3277 DAEC Rd.
PSC/Licensing Palo, IA 52324-9785 E-mail: tony.browning@nexteraenergy.com William J. (Billy) Steelman Entergy Waterford 3 17265 River Road Hwy 18 Killona, LA 70057 E-mail: wsteelm@energy.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: wendi.croft@exeloncorp.com Brian D. Mann EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 E-mail: brianm@excelservices.com