Letter Sequence Supplement |
---|
|
|
MONTHYEARL-PI-14-125, Notification of Change in Commitment for Implementation of Technical Specification Task Force 523. Generic Letter 2008-01. Managing Gas Accumulation.2015-01-15015 January 2015 Notification of Change in Commitment for Implementation of Technical Specification Task Force 523. Generic Letter 2008-01. Managing Gas Accumulation. Project stage: Request L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process Project stage: Request L-PI-15-105, License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request..2015-12-30030 December 2015 License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request.. Project stage: Request L-PI-16-003, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2016-01-25025 January 2016 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process Project stage: Supplement ML16075A0802016-03-15015 March 2016 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 Request for Additional Information Related to License Amendment Request to Adopt TSTF-523, GL 2008-01, Managing Gas Accumulation Project stage: RAI L-PI-16-029, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated..2016-03-31031 March 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated.. Project stage: Response to RAI L-08-001, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated..2016-04-14014 April 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated.. Project stage: Response to RAI ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) Project stage: Approval 2016-01-25
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 ML20058F9432020-02-27027 February 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-18-064, License Amendment Request (LAR) to Revise Current Licensing Basis, Supplement 12018-12-0404 December 2018 License Amendment Request (LAR) to Revise Current Licensing Basis, Supplement 1 L-PI-18-014, License Amendment Request (LAR) to Revise Current Licensing Basis2018-10-0202 October 2018 License Amendment Request (LAR) to Revise Current Licensing Basis L-PI-18-031, License Amendment Request to Adopt TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2018-06-26026 June 2018 License Amendment Request to Adopt TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. L-PI-18-005, License Amendment Request to Revise License Condition Associated with Implementation of NFPA 8052018-05-18018 May 2018 License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 ML17090A2012017-03-31031 March 2017 License Amendment Request to Revise Technical Specification for Plant/Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML17094A5762017-03-29029 March 2017 License Amendment Request to Revise Emergency Action Level (EAL) Scheme ML17055C3592017-02-23023 February 2017 License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times L-PI-16-060, License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action2016-08-31031 August 2016 License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action L-PI-16-020, License Amendment Request Regarding One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources- Operating.2016-04-0707 April 2016 License Amendment Request Regarding One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources- Operating. L-PI-16-003, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2016-01-25025 January 2016 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process ML15327A2282015-11-17017 November 2015 License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-15-087, Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit2015-10-31031 October 2015 Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation L-PI-14-072, License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture2014-08-21021 August 2014 License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture L-PI-14-037, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits2014-06-0909 June 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits ML14126A7272014-05-0505 May 2014 Supplement to License Amendment Request (LAR) for Cyber Security Plan Implementation Date Extension L-PI-13-102, License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan2013-12-20020 December 2013 License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan ML13333B6742013-11-27027 November 2013 License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension L-PI-13-076, Supplement to License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement2013-07-25025 July 2013 Supplement to License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement L-PI-13-071, Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria2013-07-23023 July 2013 Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). L-PI-13-017, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System) - Shutdown2013-02-20020 February 2013 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System) - Shutdown L-PI-12-110, License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA1.2 and Fuel Clad Barrier Loss Criteria2012-12-13013 December 2012 License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA1.2 and Fuel Clad Barrier Loss Criteria ML12278A4052012-09-28028 September 2012 Prairie Island, Units 1 and 2, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors L-PI-12-054, Application to Revise Technical Specifications Associated with Steam Generator Replacement and Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection2012-07-25025 July 2012 Application to Revise Technical Specifications Associated with Steam Generator Replacement and Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection L-PI-12-055, License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement2012-07-25025 July 2012 License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil L-PI-11-038, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology2011-04-0606 April 2011 Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology L-PI-11-008, License Amendment Request (LAR) to Revise Technical Specification (TS) 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications.2011-02-0404 February 2011 License Amendment Request (LAR) to Revise Technical Specification (TS) 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-02-0303 February 2011 License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. 2023-09-28
[Table view] |
Text
Xcel Energy L-PI-16-003 JAN 2 5 2016 10 CFR 50.90 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523. "Generic Letter 2008-01. Managing Gas Accumulation", Revision 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF6449 and MF6450)
References:
- 1. NSPM Letter, S. Sharp to NRC Document Control Desk, Application to Revise Technical Specifications to Adopt TSTF-523, "Generic Letter 2008-01, Managing Gas Accumulation," Using the Consolidated Line Item Improvement Process, L-PI-15-030, dated June 29,2015 (ADAMS Accession No. ML15187A259)
- 2. Technical Specification Task Force Traveler No. 523 (TSTF-523), "Generic Letter 2008-01, Managing Gas Accumulation," Revision 2 (ADAMS Accession No. ML13053A075). TSTF-523 Notice of Availability, 79 Fed. Reg. 2700 (January 15, 2014).
- 3. NRC email, T. Beltz to G. Carlson, Prairie Island Nuclear Generating Plant, Requests for Additional Information (Draft) re.; License Amendment Request to Adopt TSTF-523, (CAC Nos. MF6449 and MF6450), dated October 27, 2015
- 4. NSPM Letter, K. Davison to NRC Document Control Desk, License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, "Generic Letter 2008-01, Managing Gas Accumulation," Using the Consolidated Line Item Improvement Process - Response to Request for Additional Information, dated December 30, 2015 (ADAMS Accession No. ML15364A466) 1717 Wakonade Drive East
- Welch, Minnesota 55089-9642 Telephone: 651.388.1121
Document Control Desk Page 2 By Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), submitted to the U.S. Nuclear Regulatory Commission (NRC) a License Amendment Request (LAR) to revise the Technical Specifications (TS) for Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, to adopt TSTF-523 (Reference 2) using the Consolidated Line Item Improvement Process.
By Reference 3, the NRC Staff provided a request for additional information (RAI) on the LAR. By Reference 4, NSPM responded to the RAI and stated a supplement to the LAR would be submitted by January 27, 2016. This letter provides that LAR supplement.
As stated in our response to the RAI, this supplement to the LAR revises the proposed TS Bases SR 3.4.6.4, SR 3.4.7.4, SR 3.4.8.3, and SR 3.9.5.2 to be in agreement with TSTF-523, Revision 2, by removing the sentence "The SR can be met by virtue of having an RHR subsystem in service in accordance with operating procedures."
In addition, NSPM discovered that the sentence also appears in proposed TS Bases SR 3.9.6.3., but does not appear in the corresponding TS Bases SR 3.9.6.3 of TSTF-523, Revision 2, so this supplement also removes the sentence from proposed TS Bases 3.9.6.3.
Markups of current TS Bases pages revised in accordance with this supplement are included in Attachment 1 for information only. All other proposed TS Bases pages in the June 29, 2015, LAR are unchanged and remain as proposed. Changes to the existing TS Bases, consistent with the technical and regulatory analyses, will be implemented under the Technical Specification Bases Control Program.
All other information in Attachments 1, 2, and 3 to the June 29, 2015, LAR is unchanged by this supplement and remains as proposed: the description and assessment of the proposed change, the existing TS pages marked up to show the proposed change, and the revised (clean) TS pages.
This supplement is submitted in accordance with 10 CFR 50.90 and does not change the conclusions of the proposed No Significant Hazards Consideration determination nor the Environmental Evaluation in Reference 1.
NSPM requests the NRC issue the requested license amendment by June 30, 2016, with the amendment to be implemented within 90 days of issuance.
In accordance with 10 CFR 50.91, NSPM is providing a copy of this LAR supplement to the designated State of Minnesota official.
If there is any question or if additional information is needed, please contact Dr. Glenn A. Carlson, P.E. at 651-267-1755.
Document Control Desk Page 3 Summary of Commitments This letter contains no new commitment and no revision to an existing commitment.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on JAN 2 5 2016
~~IL~
Kevin Davison Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Attachment ( 1) cc: Administrator, Region Ill, NRC Project Manager, PINGP, NRC Resident Inspectors, PINGP, NRC State of Minnesota
ATTACHMENT 1 Technical Specification Bases (Markup)
B 3.4.6-8 B 3.4.7-8 B 3.4.8-6 B 3.9.5-7 B 3.9.6-7 5 pages follow
RCS Loops - MODE 4 B 3.4.6 BASES SURVEillANCE SR 3.4.6.4 (continued)
REQUIREMENTS of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location.
Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.
The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.
This SR is modified by a Note that states the SR is not required to be performed until12 hours after entering MODE 4. In a rapid shutdown, there may be insufficient time to verity all susceptible locations prior to entering MODE 4.
The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the RHR System piping and the procedural controls governing system operation.
REFERENCES 1. License Amendment Request Dated November 19, 1999.
(Approved by License Amendment 152/143, July 14, 2000.)
- 2. NRC Information Notice 95-35, "Degraded Ability of Steam Generator to Remove Decay Heat by Natural Circulation."
Prairie Island Unit 1 - Revisionl.mendment No. 158 Units 1 and 2 B 3.4.6-8 Unit 2- RevisionAmendment No. 149
RCS Loops -MODE 5, Loops Filled B 3.4.7 BASES SURVEillANCE SR 3.4.7.4 (continued)
REQUIREMENTS not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met.
Accumulated gas should be eliminated or brought within the acceptance criteria limits.
RHR System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location.
Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.
The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.
The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the RHR System piping and the procedural controls governing system operation.
REFERENCES 1. NRC Information Notice 95-35, "Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation".
- 2. License Amendment Request Dated November 19, 1999.
(Approved by License Amendment 152/143, July 14, 2000.)
Prairie Island Unit 1 - RevisionAmendrnent No. 158 Units 1 and 2 B 3.4.7-8 Unit 2- RevisionP.. mendment No. 149
RCS Loops- MODE 5, Loops Not Filled B 3.4.8 BASES SURVEILLANCE SR 3.4.8.3 (continued)
REQUIREMENTS Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.
The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.
The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the RHR System piping and the procedural controls governing system operation.
REFERENCES None.
Prairie Island Unit 1 - RevisionAmendment No. 158 Units 1 and 2 B 3.4.8-6 Unit 2- RevisionAmendment No. 149
RHR and Coolant Circulation-High Water Level B 3.9.5 BASES SURVEILLANCE SR 3.9.5.2 (continued)
REQUIREMENlS locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location.
Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.
The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.
The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the RHR System piping and the procedural controls governing system operation.
REFERENCES None.
Prairie Island Unit 1 - RevisionA.mendment No. 158 Units 1 and 2 B 3.9.5-7 Unit 2- RevisionAmendment No. 149
RRR and Coolant Circulation-Low Water Level B 3.9.6 BASES SURVEILLANCE SR 3.9.6.3 (continued)
REQUlREMENTS same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative sub-set of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location.
Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.
The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.
The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the RRR System piping and the procedural controls governing system operation.
REFERENCES None.
Prairie Island Unit 1- Revisionf..mendment No. 158 Units 1 and 2 B 3.9.6-7 Unit 2- RevisionAmendment No. 149