Other: L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1, L-2015-206, ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-206, L-2015-259, ANP-3440NP, Revision 1, Response to NRC Questions SRXB-RAI-1 and Snpb RAI-2 Thru Snpb RAI-20., L-2015-279, RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel, ML15197A339, ML15219A184, ML15279A226, ML15356A184, ML15356A185
|
MONTHYEARML15002A0912014-12-30030 December 2014 St. Lucie, Unit 2 - Application for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Request L-2014-366, ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report2014-12-31031 December 2014 ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report Project stage: Request ML15084A0112015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Request L-2015-166, Request for Additional Information Reply for Technical Specification Changes and Exemption Request Regarding the Transitioning to Areva Fuel2015-06-0202 June 2015 Request for Additional Information Reply for Technical Specification Changes and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Request ML15181A2902015-06-18018 June 2015 St. Lucie, Unit 2 - Resubmittal of the Areva Small Break LOCA Summary Report within the Application for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Request L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 12015-06-30030 June 2015 Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1 Project stage: Other ML15188A3402015-07-13013 July 2015 Summary of Closed Meeting with Florida Power and Light Company and Areva Regarding Request for Additional Information for the License Amendment and Exemption Requests Re. the Transitioning to Areva Fuel Project stage: RAI ML15219A1842015-07-30030 July 2015 RAI Response to SNPB-RAI-1 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Other L-2015-206, ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-2062015-07-31031 July 2015 ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-206 Project stage: Other ML15197A3392015-08-31031 August 2015 Request for Withholding Proprietary Information from Public Disclosure for the License Amendment Request and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Other ML15233A0362015-09-0404 September 2015 Redacted Request for Additional Information Regarding Proposed License Amendment Request and Exemption Request to Allow the Transition to Areva Fuel Project stage: RAI ML15224B3192015-09-21021 September 2015 Request for Withholding Information from Public Disclosure for the St. Lucie Plant, Unit 2 Project stage: Withholding Request Acceptance L-2015-259, ANP-3440NP, Revision 1, Response to NRC Questions SRXB-RAI-1 and Snpb RAI-2 Thru Snpb RAI-20.2015-10-0202 October 2015 ANP-3440NP, Revision 1, Response to NRC Questions SRXB-RAI-1 and Snpb RAI-2 Thru Snpb RAI-20. Project stage: Other ML15279A2262015-10-0202 October 2015 St. Lucie, Unit 2 - RAI Response to SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Other L-2015-279, RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel2015-11-0303 November 2015 RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Other L-2015-300, ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report.2015-11-30030 November 2015 ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report. Project stage: Request ML15356A1842015-12-0808 December 2015 St. Lucie, Unit 2 - RAI Response for Snpb RAI-9 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel Project stage: Other ML15356A1852015-12-31031 December 2015 ANP-3456NP, Revision 0, Response to SLU2 NRC Snpb RAI-9, Licensing Report. Project stage: Other 2015-06-18
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
0 June 2, 2015 L-2015-166 10 CFR 50.90 FPL.
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 RE: St. Lucie Unit 2 Docket No. 50-389 RAI Reply for Application for Technical Specification Change and Exemption Request Regarding the Transitioning to AREVA Fuel
Reference:
- 1. FPL letter L-2014-366 dated December 30, 2014, "Application for Technical Specification Change and Exemption Request Regarding the Transitioning to AREVA Fuel," Accession No. ML15002A091
- 2. FPL letter L-2015-091 dated March 23, 2015, "Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to AREVA Fuel," Accession No. ML15084A011
- 3. NRC letter dated May 12, 2015, "St. Lucie Plant, Unit No. 2 - Request for Additional Information Regarding License Amendment Request and Exemption Request Regarding the Transitioning to AREVA Fuel (TAC NOS. MF5494 AND MF5495)," Accession No. ML15127A405 Pursuant to 10 CFR 50.90, Florida Power & Light Company (FPL) submitted via Reference 1 and supplemented via Reference 2 a license amendment to the Technical Specifications (TS) for St. Lucie Unit 2 to allow the use of AREVA fuel.
In Reference 3, the NRC forwarded a request for additional information (RAI). The attachment to this letter provides FPL's response.
If you should have any questions, please contact Mr. Ken Frehafer at (772) 467-7748.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on "3 ,k~r. .. ,2015.
Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant Attachment cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Ught Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2015-166 Attachment Page 1 of 5 RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT REQUEST AND EXEMPTION REQUEST TO ALLOW THE TRANSITION TO AREVA FUEL FLORIDA POWER & LIGHT COMPANY ST. LUCIE PLANT, UNIT NO. 2 DOCKET NO. 50-389 By letter dated December 30, 2014, as supplemented by letter dated March 23, 2015 (Agencywide Documents Access and Management System Accession Nos.
ML15002A091 and ML15084A011, respectively), Florida Power & Light Company (FPL, the licensee) submitted a license amendment request to the U.S. Nuclear Regulatory Commission (NRC) for St. Lucie Plant, Unit No. 2 (SL-2). The proposed amendment would revise the Technical Specifications to allow the use of AREVA fuel at SL-2.
Additionally, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.12, FPL requests an exemption from the provisions of 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems [ECCSs] for light-water nuclear power reactors," and Appendix K to 10 CFR Part 50, "ECCS Evaluation Models," to allow the use of M5 fuel rod cladding in future core reload applications for SL-2.
The NRC staff has reviewed the information submitted by the licensee and, based upon this review, determined that the following additional information is required to complete the evaluation.
APHB-Request for Additional Information (RAI)-I The application does not provide information regarding operator actions. Identify and describe in detail any operator manual actions that will be added, deleted, or changed to support the proposed license amendment.
L-2015-166 Attachment Page 2 of 5 RESPONSE TO APHB-RAI-1 There will be no operator manual actions that will be added, deleted or changed to support the proposed license amendment.
Table 3.1 of ANP-3347P (Reference 1, Attachment 4) identifies all the events that are re-analyzed to support the proposed license amendment. None of the events re-analyzed, as described in Section 4.0 of ANP-3347P, adds, deletes or changes any operatormanual actions to mitigate the consequences and support the conclusions of the respective analyses. For other events that are not reanalyzed, there are no additions, deletions or changes to any operatormanual actions.
References:
- 1. Letter L-2014-366, J. Jensen (FPL) to U.S. NRC Document Control Desk, "St. Lucie Unit 2 Docket No. 50-389, Application for Technical Specification Change and Exemption Request Regarding the Transitioning to AREVA Fuel," dated December 30,2014
L-2015-166 Attachment Page 3 of 5 ARCB-RAI-1 In the application dated December 30, 2014, the following was stated:
The radiological consequences analyses, approved as part of EPU
[extended power uprate] in Amendment No. 163 (Reference 5), remain unaffected for the following reasons:
The key parameters related to the core design used in the radiological consequences analyses include the reactor power level, Core Operating Limits Report (COLR) limit for radial peaking factor, core average/assembly average burnup, fuel enrichment limits, fuel rod density and event specific fuel failure limits. None of these parameters change for the proposed fuel transition. Additionally, the plant operating parameters and system configurations including actuation setpoints important to the dose analysis, such as the containment spray system, emergency core cooling systems, control room ventilation and filtration system and control room isolation, remain unchanged. Other parameters, such as the atmospheric dispersion factors, iodine flashing fraction, minimum sump pH, etc. are not affected by the fuel transition. There are no changes to the steam releases assumed in the dose analyses due to the fuel design change. Therefore, the radiological consequences analyses in the
[Updated Final Safety Analysis Report] UFSAR will continue to remain applicable for the operation of St. Lucie Unit 2 with the transition to AREVA [Combustion Engineering] CE 16x16 [high thermal performance]
HTPTM fuel as proposed in this license amendment request.
A modification to the licensing basis fuel type can have the potential to change the core isotopic distribution assumed in post-accident conditions. Based upon this, provide additional information regarding the effect the proposed fuel type change has on the current radiological consequence design-basis analyses. Provide any changes to the assumptions or methodologies in the radiological design-basis accident (DBA) analyses as a result of the proposed fuel type change and justifications for those changes. If there are changes to the radiological DBA analyses, provide the resulting change to the calculated radiological consequence of the DBAs.
RESPONSE TO ARCB-RAI-1 The fuel type change supporting the proposed license amendment does not change the fuel rod dimensions, rod configuration and core design parametersas compared to the fuel currently used in the St. Lucie Unit 2 core and analyzed for the radiological consequences.
L-2015-166 Attachment Page 4 of 5 The following fuel parametersremain unchanged:
Pellet diameter Cladding outside diameter Cladding thickness Active fuel height Rod configuration (16x 16)
Total number of fuel assemblies in the core The following core design parameters used in the isotopic calculations remain unchanged:
Core power level Maximum radialpeaking factor Maximum assembly power level Peak assembly average bumup Core average burnup Fuel enrichment (minimum and maximum)
Maximum mass of uranium per assembly The proposed fuel design change, therefoie, does not impact the current radiological consequences design basis analyses and no new radiologicalconsequences analyses are performed to support the proposed license amendment.
L-2015-166 Attachment Page 5 of 5 ARCB-RAI-2 Previously, in Amendment No. 163, an analysis was done to develop a bounding source term that is used for the radiological DBAs. This analysis was performed using the ORIGEN-2.1 computer code and was based on Westinghouse fuel and Regulatory Guide 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," release fractions.
Provide a detailed explanation regarding whether any additional analysis has been performed to demonstrate that the source term previously developed remains bounding for AREVA CE 16x16 HTPTM fuel. Include in the response any computer codes used and explain how the AREVA fuel source term compares to the Westinghouse fuel source term.
RESPONSE TO ARCB-RAI-2 There are no additional analyses done related to the source term used in the radiological consequences analyses. The fuel parameters and the core design parameters, as listed in the response to ARCB-RAI-1, used in developing a bounding source term for radiological design basis accidents, remain unchanged for the fuel design change proposed in the Reference I license amendment request. Thus no additional source term analyses have been performed in support of the proposed fuel transitionlicense amendment.
References: