0SEP FPL_

0.8 2006 IL-2006-209 10 CFR 50.90 10 CFR 50.91 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 RE: Turkey Point Unit 3 Docket No. 50-250 License Amendment Request Inoperable Rod Position Indication Pursuant to 10 CFR 50.90 and 10 CFR 50.91 (a)(6), Florida Power and Light Company (FPL) requests exigent approval of changes to the Turkey Point Unit 3 Facility Operating License DPR-31 by incorporating the attached Technical Specification (TS) revision. This revision is being requested due to an inoperable control Rod Position Indicator (RPI). The proposed amendment would revise applicable Technical Specifications to allow the use of an alternate method of determining rod position for the control rod with the inoperable RPI.

This request is similar to the Turkey Point Unit 4 Exigent Technical Specification Amendment request submitted by FPL letter L-2004-174 dated July 28, 2004 and approved by NRC on August 20, 2004 (TAC No. MC3889).

FPL is requesting that this amendment be processed as an exigent amendment request pursuant to 10 CFR 50.91 (a)(6) due to the unanticipated failure of the Turkey Point Unit 3 Analog RPI for control rod M-6 in Control Rod Bank C. The failure of the Unit 3 RPI for control rod M-6 has resulted in erratic position indication, with Control Rod Bank C all rods out position at 230 steps. This was confirmed by flux mapping. Troubleshooting activities outside containment have indicated intermittent low resistance between the primary and secondary coils and shield. Specialty equipment was used to further identify the fault inside containment. The test results indicated disturbances at both the penetration and the RPI coil stack/ bulkhead connections.

Accessibility and significant radiation dose prevent repairs during power. The connector(s) or detector coils need inspection and repair during an outage. For the plant to conduct a shutdown to repair the inoperable RPI at this time would be unnecessary. Repairs will be performed at the earliest opportunity, when Turkey Point Unit 3 enters Mode 5 and the outage is of sufficient duration to effect the repairs, but no later than Unit 3 Cycle 23 refueling outage in Fall 2007.

an FPL Group company

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Page 2 License Amendment Request Inoperable Rod Position Indication With one analog rod position indicator per bank inoperable, action statement a. of TS 3.1.3.2 currently requires that 1.) Determine the position of the non-indicating rod(s) indirectly by the movable incore detectors at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and within one hour after any motion of the non-indicating rod which exceeds 24 steps in one direction since the last determination of the rod's position, or 2.) Reduce THERMAL POWER to less than 75% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

FPL is currently implementing TS action statement a.l. As a result, there is concern regarding excessive wear of the movable incore detector system, due to exercising the movable incore detectors every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (90 times per month), to comply with the compensatory actions required by the current action statement a.1 of TS 3.1.3.2.

Although, wear of the incore detector system does not pose a reduction in the margin of safety for operation of Turkey Point Unit 3, excessive wear of the incore detector system could result in a loss of functionality of the system. This could lead to the inability to complete required surveillances, which if not completed could lead to a required plant power reduction and/or shutdown.

Implementation of the request contained in this submittal will allow the use of an alternate method of determining rod position for the control rod with the inoperable RPI. The method to be used will monitor the stationary gripper coil of the M-6 Control Rod Drive Mechanism (CRDM). This alternate method is applied to the inoperable M-6 RPI in the following TS sections and associated Surveillance Requirements:

3/4.1.3.1, Movable Control Assemblies 3/4.1.3.2, Position Indicating Systems - Operating 3/4.1.3.6, Control Rod Insertion Limits The proposed changes have been evaluated in accordance with 10CFR50.91 (a)(1), using the criteria in 10CFR50.92(c). FPL has determined that the proposed changes involve no significant hazards considerations. is an evaluation of the proposed change. Attachment 2 is the "Determination of No Significant Hazards Consideration." Attachments 3 and 4 contain copies of the affected Technical Specifications pages marked-up and a clean copy of the proposed revision, respectively.

The Turkey Point Plant Nuclear Safety Review Committee and the FPL Company Nuclear Review Board have reviewed the proposed amendment. In accordance with 10 CFR 50.91 (b)(1), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Page 3 License Amendment Request Inoperable Rod Position Indication Upon approval of the proposed change, FPL requests that the amendment be made effective on the date of issuance.

Please contact Walter Parker, Licensing Manager, at (305) 246-6632, if there are any questions regarding this submittal.

Very truly yours, TerryOnJoe Vice President Turkey Point Plant Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Mr. W. A. Passetti, Florida Department of Health

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Page 4 License Amendment Request Inoperable Rod Position Indication STATE OF FLORIDA )

) ss.

COUNTY OF MIAMI-DADE )

Terry 0. Jones being first duly sworn, deposes and says:

That he is Vice President, Turkey Point Plant, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

STATE OF FLORIDA COUNTY OF Miami-Dade Sworn to and subscribed before me this day of ofr-", 2006 by, Terry 0. Jones who is personally known to me.

SiignPublic-State of Florida Name of Notary Public (Print, Type, or Stamp)

MARTIN CATHERINE

  • '4,PRUDENCE EXPIRES: May). 010 4pnW153 eOaM ffftNOWaY SO16

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 1 of 10 InoDerable Rod Position Indication EVALUATION OF PROPOSED TS CHANGE

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 2 of 10 Inoperable Rod Position Indication EVALUATION OF PROPOSED TS CHANGE BACKGROUND This request is similar to the Turkey Point Unit 4 Exigent Technical Specification (TS)

Amendment request submitted by Florida Power and Light Company (FPL) letter L-2004-174, dated July 28, 2004 and approved by NRC on August 20, 2004 (TAC No.

MC3889). At that time, the Unit 4 Rod Position Indication (RPI) for control rod F-8 in Shutdown Bank B was faulty and the proposed alternate rod position monitoring method was approved for Turkey Point Unit 4 under License Amendment 221 and was applicable for Unit 4 Cycle 21 only. During the reactor vessel head replacement refueling outages, the RPI wiring and connectors from the RPI's to the junction at the cavity were replaced with a new design for both Unit 3 and Unit 4. The Unit 4 RPI for control rod F-8 was repaired; thus, the associated TS revisions are no longer in effect.

Pursuant to 10 CFR 50.90 and 10 CFR 50.91 (a)(6), FPL requests that Turkey Point Unit 3 TS 3/4.1.3.1, 3/4.1.3.2 and 3/4.1.3.6 be modified to allow the use of an alternate method of determining rod position for M-6 control rod with the inoperable RPI. This would be effective during Unit 3 Cycle 22 only, until repair of the indication system can be completed.

The failure of the RPI for control rod M-6 resulted in erratic position, with Control Bank C all rods out position at 230 steps. This was confirmed by flux mapping. Troubleshooting activities outside containment have indicated intermittent low resistance between the primary and secondary coils and shield. Specialty equipment was used to further identify the fault inside containment. The test results indicated disturbances at both the penetration and the RPI coil stack / bulkhead connections. Accessibility and significant radiation dose prevent repairs during power. The connector(s) or detector coils need inspection and repair during an outage.

For the plant to conduct a shutdown to repair the inoperable RPI at this time would be unnecessary. The proposed changes provide adequate controls to ensure that the rod position is known and to ensure that a rod drop or misalignment is detectable. The justification of the requested changes concludes that the increase in the likelihood of an undetected rod drop or misalignment is negligible and that the basis and consequences of the accident analyses are maintained.

Repairs will be performed at the earliest opportunity, when Turkey Point Unit 3 enters Mode 5 and the outage is of sufficient duration to effect the repairs, but no later than Unit 3 Cycle 23 refueling outage currently scheduled for Fall 2007.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 3 of 10 Inoperable Rod Position Indication DESCRIPTION OF PROPOSED TS CHANGE The current Technical Specifications were previously revised with Exigent Technical Specification Amendment dated August 20, 2004, concerning the inoperability of Rod Position Indication System for Unit 4 control rod F-8 in Shutdown Bank B, limited to Unit 4 Cycle 21 only. The RPI system for F-8 was repaired during Unit 4 refueling operations; thus, the associated TS revisions are no longer in effect. The TSs will be revised by this amendment to remove the associated notes regarding the inoperability of the Unit 4 control rod F-8 in Shutdown Bank B.

The proposed Unit 3 TS changes regarding control rod M-6 in Control Bank C, including the removal of the notes for the Unit 4 control rod F-8 in Shutdown Bank B, are summarized below. Marked-up and clean Technical Specification pages for the proposed changes are provided as Attachments 3 and 4.

With one analog RPI per bank inoperable, TS action statement a. of TS 3.1.3.2 currently requires that 1.) Determine the position of the non-indicating rod(s) indirectly by the movable incore detectors at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and within one hour after any motion of the non-indicating rod which exceeds 24 steps in one direction since the last determination of the rod's position, or 2.) Reduce THERMAL POWER to less than 75% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. FPL is currently implementing action statement a.1. A description of the proposed changes is provided below.

For TS 3/4.1.3.1, Movable Control Assemblies, and 3/4.1.3.2, Position Indicating Systems

- Operating, the existing note regarding the position of the Unit 4 Rod F-8 is removed, and the following note is added to sections relating to the use of analog rod position indication:

"During Unit 3 Cycle 22, the position of Rod M-6 Control Bank C will be determined every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state, until the repair of the indication system for this rod is completed."

For TS 3/4.1.3.5, Shutdown Bank Insertion Limit, the existing note regarding the position of the Unit 4 Rod F-8 is removed. The RPI system for F-8 was repaired during Unit 4 refueling operations; thus, the associated TS revisions are no longer in effect.

For TS Surveillance Requirement of 4.1.3.1.1, the existing note regarding the position of the Unit 4 Rod F-8 is removed, and the following note is added regarding the use of analog rod position indication:

"During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 4 of 10 Inoperable Rod Position Indication has not changed state and it will not provide an input into the Rod Position Deviation Monitor. The use of the alternate method for rod M-6 does not require the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> comparison of demanded versus actual position per 4.1.3.1.1 ."

For Surveillance Requirements of 4.1.3.2.1, the existing note for the Unit 4 Rod F-8 is removed, and the following note is added regarding the use of analog rod position indication:

"During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state and it will not provide an input into the Rod Position Deviation Monitor. The use of the alternate method for rod M-6 does not require the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> comparison of demanded versus actual position per 4.1.3.2.1."

For Surveillance Requirements of 4.1.3.6, the following note is added regarding the use of analog rod position indication:

"During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state.

JUSTIFICATION FOR PROPOSED TS CHANGE As described in the bases for Specification 3.1.3, the purpose of the rod control system, of which the RPIs are an integral part, is to ensure that: "(1) acceptable power distribution limits are maintained, (2) the minimum SHUTDOWN MARGIN is maintained, and (3) the potential effects of rod misalignment on associated accident analyses are limited.

OPERABILITY of the control rod position indicators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits."

FPL has determined that these objectives can be met with an inoperable RPI in a control bank without subjecting the movable incore system to unnecessary additional wear. FPL will install a recorder to track parameters of the stationary gripper coil of the Control Rod Drive Mechanism (CRDM) on the non-indicating rod; FPL will verify at least once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> that the coil has not changed state. This 8-hour surveillance period is consistent with the current operational requirements for control rod M-6 flux trace position determination and is more frequent than the normal 12-hour requirement for position determination specified in TS 4.1.3.1.1. If the coil has changed state, a determination of control rod M-6 position will be made by using the movable incore detector system in accordance with plant procedures. At least once every 31 effective full power days, a confirmation of control rod M-6 position will be made, using the movable incore system.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 5 of 10 Inoperable Rod Position Indication In summary, FPL concludes that the proposed change will ensure that the intent of Technical Specifications are met.

In evaluating the requested change, the following conditions were considered:

  • Rod Drop or Rod Misalignment During Power Operation
  • Rod Drop or Rod Misalignment During Reactor Startup
  • SHUTDOWN MARGIN Rod Drop or Rod Misalignment During Power Operation A full rod drop of this control rod would be immediately detectable by other means than the position indication system. Independent indication of a dropped control rod is obtained by using the excore power range signals. This rod drop detection circuit is actuated upon sensing a rapid decrease in flux and is designed such that normal load variations do not cause it to be actuated. Furthermore, a negative reactivity insertion corresponding to the reactivity worth of a full rod drop of control rod M-6 would cause a noticeable change in core parameters including core power and core average temperature.

A rod misalignment of this control rod may also be detectable by other means, e.g. axial flux deviation and the required operator actions would therefore not be dependent on the status of the individual rod position indication system. For the infrequent instances when Control Bank C movement is required during power operation a determination of control rod M-6 position will be made by using the movable incore detector system in accordance with plant procedures.

With alternate CRDM parameter monitoring and rod drop/misalignment parameter indications, the increase in the likelihood of an undetected rod drop or misalignment is considered to be negligible.

Rod Drop or Misalignment During Reactor Startup Since the movable incore detectors cannot be used to determine rod position until sometime after entry into Mode 2, when neutron flux becomes adequate, an alternate method will be utilized during a reactor startup to provide initial verification that Rod M-6 is fully withdrawn. This alternate method will involve the use of a Dewetron recorder to record the profile of the stationary, lift and moveable coils and performing a slip test at full rod out (Rod M-6) position to confirm the rod is fully withdrawn. This altemate method will only be used as a means of verifying rod position if the startup occurs as a result of an unplanned outage that does not permit repair of the indicating circuit. Rod position verification using this method will permit startup. As a second diverse check, the movable incore detectors will be used to verify rod position when neutron flux becomes adequate. Following

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 6 of 10 Inoperable Rod Position Indication verification that the rod is withdrawn, a rod misalignment would be detectable by means other than the rod position indication system, e.g. CRDM trace monitoring, axial flux deviation and the required operator actions would therefore not be dependent on the status of the individual rod position indication.

The increase in the likelihood of an undetected rod drop or misalignment is therefore considered to be negligible.

Reactor Trip Following a reactor trip, the position indication system is used to verify that all rods have fully inserted. Current plant procedures require emergency boration if more than one rod fails to fully insert. The inoperability of the position indication system prevents verification of insertion for the subject rod during reactor trip. As an additional conservative measure administrative controls will be used to heighten reactor operator awareness that the rod position indication for Rod M-6 is inoperable. This will ensure that emergency boration is initiated as required only if another control rod other than M-6 does not fully insert. Turkey Point typically performs a manual reactor trip from approximately 25% power in the event of a controlled shutdown so that these post-trip procedures would also be used.

Shutdown Margin Consistent with TS 3/4.1.1.1, SHUTDOWN MARGIN in Modes 1 and 2 is ensured by verifying compliance with the control bank insertion limits of TS 3.1.3.6. The surveillance specified in TS 4.1.3.6 is performed with the Rod Insertion Limit Monitor, which relies on the group step counter demand position indication and is unaffected by the out-of-service Analog RPI for Rod M-6. Nevertheless, in the case when the Rod Insertion Limit Monitor is inoperable, the analog RPI for individual rods can be used to demonstrate compliance with TS 3.1.3.6 consistent with TS surveillance requirement 4.1.3.6. The proposed alternate method to monitor the stationary gripper coil for Rod M-6 will provide assurance that the position has not changed and remains within the allowed misalignment with the group step counter demand position for Control Bank C and the control bank insertion limits of TS 3.1.3.6.

In addition, verification of compliance with required SHUTDOWN MARGIN in Modes 1 and 2 also relies upon the control rods being movable and trippable. This is verified by periodic rod exercise consistent with TS surveillance requirement 4.1.3.1.2. During the performance of this rod exercise procedure, control rod M-6 will be exercised and flux traces will be performed after insertion and removal to confirm the position of Rod M-6.

Thus, the moveable and trippable status of M-6 will be confirmed and Rod M-6 can continue to be credited in verification of SHUTDOWN MARGIN in Modes 1 and 2.

Consistent with TS 3/4.1.1.1 and TS 3/4.1.1.2, SHUTDOWN MARGIN in Modes 3,4 and 5 is ensured by considering Reactor Coolant System (RCS) boron concentration, control rod

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 Ucense Amendment Request Page 7 of 10 Inoperable Rod Position Indication position, RCS average temperature, fuel burnup, xenon concentration and samarium concentration. Plant procedures ensure SHUTDOWN MARGIN in Modes 3, 4 and 5 by specifying RCS boron concentration requirements that consider all these factors. While in Modes 3, 4 and 5 the analog rod position indication is relied upon to determine control rod position. While the analog RPI for Rod M-6 remains out-of-service in Modes 3, 4 and 5 rod position cannot be easily determined. Accordingly, these RCS boron concentration requirements will be increased to consider an allowance for the withdrawn worth of control rod M-6 and a second control rod that provides the highest combined reactivity allowance.

Shutdown Margin Calculation procedure O-OP-028.2 will be revised to ensure that shutdown margin limits continue to be met for the remainder of this operating cycle. The use of the alternate methodology requires that the pertinent procedures are modified to account for the inoperable RPI. Additional training including operator simulator training with the instrumentation required for the alternate methodology will be provided to the reactor operators and Instrumentation and Control Maintenance technicians to assure familiarity with new plant conditions and modified procedures.

Thus, the proposed alternate position verification for Rod M-6 while at power, normal rod exercise surveillance of Rod M-6 and increased shutdown boron concentration requirements will ensure compliance with the SHUTDOWN MARGIN requirements of TS 3.1.1.1 and TS 3.1.1.2 will be maintained.

Proposed Alternate Rod Position Monitoring Method Implementation Parameter Monitored The parameter monitored for control rod M-6 will be the stationary gripper coil current. The control rods are held in place by energized stationary gripper coils. The control rod can not be moved without de-energizing the stationary gripper coil. The rod control power cabinet design uses a resistor to monitor the coil current. The gripper coil current (measured as an equivalent voltage) will be monitored on an existing control room recorder, R-3-348. This digital recorder is a Yokogawa model DX-208 eight-channel recorder. This is mounted on a vertical panel within the control room surveillance area.

R-3-348 is a multi-channel recorder with currently one channel in continuous use for Generator Gross Mega-Watts and one channel used periodically for Auxiliary Feedwater testing. A spare channel will be used to display gripper current for control rod M-6. The normal gripper current is 4.4 amps, which when measured across the resistor will be equivalent to 275 milli-volts. The recorder has alarm indication in a form of a display window, which is programmed for a low voltage alarm indicative of a gripper coil change of state.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 8 of 10 Inoperable Rod Position Indication Operator Training The licensed Reactor and Senior Reactor Operators will be responsible for monitoring the output data from the alternate monitoring equipment, recorder R-3-348. The recorder will be programmed to display control rod M-6 gripper trends and numerical values. Operating procedure 3-OSP-201.1 RCO Daily Log", will provide instructions for monitoring gripper U

trends. Accordingly, the indicated value for control rod M-6 will be logged by the Operators at least every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Operators will be able to identify any changes in gripper coil state based on a deviation from the normal state, which is defined by a predetermined operating band as well as by a programmed alarm, and by observing the historical trend line displayed on the recorder. The actions prescribed in the Annunciator Response and Off Normal Operating procedures for a change in the gripper value are the same as those for a rod that is indicated to be deviating based on an individual RPI.

lmpact on Indications and Alarms:

The following table provides a summary of the indications and alarms and how they are affected by the inoperable RPI for control rod M-6:

Indication I Alarm Normal Operation Affect of Modified Operation Identification Provides analog rod Analog Meter RPI M-6 This indication will be disabled and position reading for considered out-of-service for Rod M-6.

Indication Panel 3C02 control rod M-6.

Lights illuminate This indication will be disabled and Rod Bottom Panel 3QR70 when any rod is considered out-of-service for Rod M-6.

Indication Uctsn within 20 steps or

& 3C02 closer to te ot Lights closer to the bottom The ilu lights na owill. not be capable of of thecore.illumination.

of the core.

Annunciator This annunciation is Rod Bottom / window B7/1 actuated when any Rod Drop - NIS / RPI rod is within 20 The ability of RPI M-6 to actuate this Annunciation Rod Drop steps or closer to annunciation will be disabled.

nRod Stop the bottom of the Rod Stop core.

This annunciation is actuated for any Rod Annunciator deviation of 12 (24 Don window B9/3 moving) steps The ability of RPI M-6 to actuate this Deviation Rod between any two annunciation will be disabled.

Annunciation Deviation rods in the same bank.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 9 of 10 Inoperable Rod Position Indication This annunciation is actuated for any control bank at or below its B8/2:1o-lo Annunciator limit (Banks A & B -

window B8/1 203 steps, Banks C This annunciation relies on the group step

&B8/2 Rod & D variable per counter demand position indication and is Rod Insertion COLR rod insertion Bank ANB/C/D unaffected by the out-of-service Analog Limit Monitor limit) and B8/1: lo-Low Limit & RPI for Rod M-6.

Extra Low limit (Banks A & B -

Limit 223 steps, Bank C 10 steps above Io-lo limit and Band D 20 steps above Io-lo limit)

Provide a single An additional recorder channel indication Gross Yokogawa continuous will be added to the function of the Megawatts Recorder R recording of the equipment. This indication will provide Recorder 348 Panel gross megawatts continuous recording and indication of the 3Cg4 from the main Stationary Gripper status for Rod M-6.

__________ ___________generator.___________________

Gross Yokogawa No alarms are High and low alarm indication light Mgr ts Rsettings will be provided on this recorder RecordeRecorder38 utilized on this for the Stationary Gripper status for Rod 3C04 r M-6.

Compensatory Measures The following compensatory measures will be used to offset the loss of indication and alarms affected by the inoperable RPI for control rod M-6:

For the Analog Meter Indication:

The specific position indication of height for the individual RPI of control rod M-6 that will not be available on the alternate monitoring equipment will be compensated for by performing flux traces. Flux traces will be required following rod motion that affects Control Bank C. This measure will be procedurally driven by the general operating procedures that govern a reactor startup, reactor operation and the surveillance procedure that exercises all of the rods on a routine basis. The flux trace which is used to verify that control rod M-6 is fully withdrawn during the startup sequence, will be performed prior to exceeding 30% reactor power. The traces during the rod exercising procedure will be performed following the insertion of Control Bank C and following the subsequent withdrawal to 230 steps.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 1 License Amendment Request Page 10 of 10 Inop~erable Rod Position Indication For the Rod Bottom Light Indication and Rod Bottom Annunciation Alarm:

The M-6 Rod Bottom Light and Rod Bottom Annunciation Alarm that will not be available on the alternate monitoring equipment will be compensated for by the procedurally driven requirement to perform a flux trace any time a change in state is indicated on the recorder.

In the case of an indicated dropped rod on the individual rod position indicator for M-6, the Operators will monitor the plant response as trained for a Dropped Rod event. They will specifically monitor for changes in RCS temperature and pressure, changes of indicated reactor power and indicated neutron flux, changes in generator output and pressurizer level. If no changes in plant parameters are noted along with no change in state based on the alternate monitoring indication, a flux trace is still procedurally required. Ifchanges are noted in plant parameters, it will be assumed that the rod has dropped and required actions will be taken. If another rod drops in conjunction with the indications discussed for M-6, it will be assumed that two rods have dropped and Operators will take appropriate actions.

For the Rod Deviation Annunciation Alarm:

The Rod Deviation Annunciation Alarm that will be lost for control rod M-6 only, will be compensated by flux traces driven from the Annunciator Response procedure as well as the routine surveillance procedure when a gripper coil change in state is observed on the alternate monitoring equipment.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 2 License Amendment Request Page 1 of 3 Inoperable Rod Position Indication DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 2 License Amendment Request Page 2 of 3 Inoperable Rod Position Indication DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION The Commission has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92. A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with a proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.

Florida Power and Light Company (FPL) has concluded that the proposed amendment to the Turkey Point Unit 3 operating license does not involve a significant hazards consideration. In support of this determination, an evaluation of each of the three standards set forth in 10 CFR 50.92 is provided below.

1. Will operation of the facility in accordance with this proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

No. The proposed change provides an alternative method for verifying rod position of one control rod. The proposed change meets the intent of the current specification in that it ensures verification of position of the control rod once every eight (8) hours. The proposed change provides only an alternative method of monitoring control rod position and does not change the assumption or results of any previously evaluated accident.

Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Will operation of the facility in accordance with this proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

No. As described above, the proposed change provides only an alternative method of determining the position of one control rod. No new accident initiators are introduced by the proposed alternative manner of performing rod position verification. The proposed change does not affect the reactor protection system or the reactor control system. Hence, no new failure modes are created that would cause a new or different kind of accident from any accident previously evaluated.

Therefore, operation of the facility in accordance with the proposed amendments would not create the possibility of a new or different kind of accident from any accident previously evaluated.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 2 License Amendment Request Page 3 of 3 Inoperable Rod Position Indication

3. Will operation of the facility in accordance with this proposed change involve a significant reduction in a margin of safety?

No. The bases of Specification 3.1.3.2 state that the operability of the rod position indicators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits. The proposed change does not alter the requirement to determine rod position but provides an alternative method for determining the position of the affected rod. As a result, the initial conditions of the accident analysis are preserved and the consequences of previously analyzed accidents are unaffected.

Therefore, operation of the facility in accordance with the proposed amendments would not involve a significant reduction in the margin of safety.

Based on the reasoning presented above, FPL has determined that the requested changes involve no significant hazards consideration.

Environmental Consideration The proposed license amendment changes requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20.

The proposed amendment involves no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite, and no significant increase in individual or cumulative occupational radiation exposure. FPL concluded that the proposed amendment involves no significant hazards consideration and meets the criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and that, pursuant to 10 CFR 51.22(b), an environmental impact statement or environmental assessment need not be prepared in connection with issuance of the amendment.

Conclusion FPL concludes, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be detrimental to the common defense and security or to the health and safety of the public.

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 3 License Amendment Request Page 1 of 1 Inoperable Rod Position Indication TURKEY POINT UNIT 3 MARKED-UP TECHNICAL SPECIFICATION PAGES Pages 3/4 1-17 Pages 3/4 1-18 Pages 3/4 1-20 Pages 3/4 1-21 Pages 3/4 1-25 Pages 3/4 1-26

REACTIVITY CONTROL SYSTEMS 3/4.1,3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and positioned within the Allowed Rod Misalignment between the Analog Rod Position Indication **and the group step counter demand position within one hour after rod motion. The Allowed Rod Misalignment shall be defined as:

a for THERMAL POWER less than or equal to 90% of RATED THERMAL POWER, the Allowed Rod Misalignment Is +/- 18 steps, and

b. for THERMAL POWER greater than 90% of RATED THERMAL POWER, the Allowed Rod Misalignment Is
  • 12 steps APPLICABILITY. MODES 1 and 2*

ACTON:

a. With one or more full length rods Inoperable due to being Immovable as a result of excessive friction or mechanical Interference or known to be untrippable. determine that the SHIJTDOWN MARGIN requirement of Specification 3.111 Is satisfied within I hour and be In HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With more than one full length rod Inoperable or misaligned from the group step counter demand position by more than +/- 12 steps and THERMAL POWER greate than 90% of RATED THERMAL POWER, within I hour either.
1. Restore all Indicated rod positions to within the Allowed Rod Misalignment, or
2. Reduce THERMAL POWER to less harn 90% of RATED THERMAL POWER and confirm that all Indicated rod positions are within the Allowed Rod Misalignment, or
3. Be In HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With more than one full length rod Inoperable or misaligned from the group step counter demand position by more than +/-18 steps and THERMAL POWER less than or equal to 90% of RATED THERMAL POWER, within I hour either
1. . Restore all indicated rod positlons to within the Allowed Rod Misalignment, or
2. Be In HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

"AWee eclal Test Exceptions 3.10.2 and 110.3.

"*Durng Unit 4-Cyce 21. the position of Rod F- Shutdown Bank B will be determined every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine It has not changed state, until the repair of the Indication system for this rod Is completed.

TURKEY POINT - UNITS 3 & 4 3/41-17 AMENDMENT NOS. 186 AND 221

REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

d. With one full length rod Inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the Allowed Rod Misalignment of Specification 3.1.3.1, POWER OPERATION may continue provided that within one hour either:
1. The rod is restored to OPERABLE status within the Allowed Rod Misalignment of Specification 3.1.3.1, or
2. The remainder of the rods in the bank with the Inoperable rod are aligned to within the Allowed Rod Misalignment of Specification 3.1.3.1 of the Inoperable rod while maintaining the rod sequence and Insertion limits of Specification 3.1.3.6; the THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent operation, or
3. The rod is declared Inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 Is satisfied. POWER OPERATION may then continue provided that:

a) The THERMAL POWER level is reduced to less than or equal to 75% of RATED THERMAL POWER within one hour and within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the power range neutron flux high trip setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER. THERMAL POWER shall be maintained less than or equal to 75% of RATED THERMAL POWER until compliance with ACTIONS 3.1.3.1.d.3.c and 3.1.3.1.d.3.d below are demonstrated, and b) The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and c) A power distribution map is obtained from the movable incore detectors and F0 (Z) and FNAH are verified to be within their limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and d) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions.

SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The position

  • of each full length rod shall be determined to be within the Allowed Rod Misalignment of the group step counter demand position at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (allowing for one hour thermal soak after rod motion) except during time Invervals when the Rod Position Deviation Monitor is Inoperable, then verify the group positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.1.2 Each full length rod not fully Inserted in the core shall be determined to be OPERABLE by movement of at least 10 steps in any one direction at least once per 92 days.

veriyin gripercoi parmetrs f th Co~olRod riv Mehanism to determine Ithas not changed state,

  • urig
  • Uit 4Cyce 2, th poitin ofRodF-8 Shudow Bak B, may be monitored by verifying gripper coil*

/ an Input Intoofthe parameters theRod Control RodDeviation Position DEve Mechanism Monitor. to determine The it has use of the not changedMstate alternate andF-8 method for Rod it Will doesnotnot provide TURKEY POINT - UNITS 3 &4 3/4 1-18 AMENDMENT NOS. 186 AND 221

RE-AC'T* CONTROL SYSMSTE POSITION INDICATION SYSTEMS - OPERATING UMITING CONDITION FOR OPERATION (Continued) 3.13.2 The Analog Rod Position Indication System

  • and the Demand Position Indication System shall be OPERABLE end capable of determining the respective actual and demanded shutdown and confrol rod positions as follows:
a. Analog rod position Indicators *,within one hour after rod motion (allowance for thermal soak);

Al Shutdown Banks: within the Allowed Rod Misalignment of Speciricalion 3.1.3.1 of the group.

demand counters for withdrawal ranges of 0-30 steps and 200-All Rods Out as defined Inthe Core Operating Umits Report.

Control Bank A and B: within the Allowed Rod Misalignment of Specification 3.1 3.1 of the group demand counters for withdrawal ranges of 0-30 steps and 200-4A Rods Out as defined In the Core Operating Limits Report Control Banks C and D: within the Allowed Rod Misalignment of Specification 3.1.3.1 of the group demand counters for withdrawal range of 0-AI Rods Out as defined Inthe Core Operating Limits Report.

b Group demand counters;v 2 steps, APPLICABILITY: MODES I and 2.

ACTION:

a. With a maximum of one analog rod position Indicator per bank Inoperable either.
1. Determine the position of the non-Indicating rod(s) *Idirec*ly by the movable Incore detectors at least once perB hours and within one hour after any moion of the non-Indicating rod which exceeds 24 steps Inone diection since the last determination of the rode poston, or 2 Reduce THERMAL POWER to less than 75% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
b. With a maximum of one demand position Indicator per bank Inoperable either.

1 Verify that all analog rod poslo indicators for the affected bank are OPERABLE and that the most withdrawn rod and the least w1thdrawn rod of the bank are within the Allowed Rod Misalignment of Specifcfation 3.1"3.1 at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or

2. Reduce THERMAL POWER to less than 75% of RATED THERMAL POWER withln 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

by verifyng gripper coil paraeters of the Control Rod Drive Mechanism to determine It has not J chage,state, uni h earo h niainsse o hsrdIopee TURKEY POINT - UNITS 3 &4 3/4 1-20 AMENDMENT NOS. 186 AND 221

REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.3.2.1 Each analog rod position indicator

  • shall be determined to be OPERABLE by verifying that the Demand i Position Indication System and the Analog Rod Position Indication System
  • agree within the Allowed Rod Misalignment of Specification 3.1.3.1 (allowing for one hour thermal soak after rod motion) at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time Intervals when the Rod Position Deviation Monitor **Is Inoperable, then compare the Demand Position Indication System and the Analog Rod Position Indication System at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.2.2 Each of the above required analog rod position indicator(s)

  • shall be determined to be OPERABLE by performance of a CHANNEL CHECK, CHANNEL CALIBRATION and ANALOG CHANNEL OPERATIONAL TEST performed in accordance with Table 4.1-1.

il ed t r i e of -

Rod F 8 Shut do nB n F-"

position )

Durin Unt4 C ce2,the D rive coil parameters of the Control Rod by verifying gripper the repair of the Indication

> every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> has not changed state, until it Mechanism to determine rod Is completed. Bank B, may be monitored system for thisCycle 21, the position of Rod F-8, Shutdown

    • During Unit 4 by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state and it will not provide an Input Into the Rod Position Deviation Monitor. The use of the alternate method for Rod F-8 does not require the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> comparison of demanded versus actual position per 4.1.3.2. 1.

A.&

=bb N1. SR

  • ________.

TURKEY POINT - UNITS 3 & 4 3/4 1-21 AMENDMENT NOS. 186 AND 221

REACTIVrTY CONTROL SYSTEMS SHUTDOWN ROD INSERTION LIMIT LIMITING CONDITION FOR OPERATION 3.13.5 Ali shutdown rods shall be fully wmthdrawn.

APPLICABILITY: MODES I*and 2*

  • ACTION:

With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4 1.31 2. wVthin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either.

a. Fully withdraw the rod, or
b. Declare the rod to be Inoperable and apply Specification 3.13 1 SURVEILLANCE REQUIREMENTS 4.1.3.5 Each shutdown rode'shl be 'determned to be ful-iw
a. Within 15 mlnutes pror to hdrawal orany rods In control banks A, B, C, or D during an approach to reactor criticality, and
b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

'See Speda! Test Exceptons Specifications 3.10 2 and 3.10.3. bEEF

.. ,_*W'dK,*rreaer han or equal to 1.A *---" --

/***During Unit 4 Cycle 21, the posrtion of Rod F-8 Shutdown Bank B will be S determhed every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by veriying grpper coll parameters of the Control Rod

\ Drive Mechanism to determine Ithas not changed state. until the repair of th~e TURKEY POWT - UNITS 3 &4 3141-25 AMENDMENT NOS. 137 AND 221

REACTIVITY CONTROL SYSTEMS CONTROL ROD INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.6 The control banks shall be limited in physical insertion specified in the Rod Bank Insertion Limits curve, defined In the CORE OPERATING LIMITS REPORT.

APPLICABILITY: MODES 1V and 2* **

ACTION:

With the control banks Inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2 either:

a. Restore the control banks to within the limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or
b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position specified in the Rod Bank Insertion Limits curve, defined in the CORE OPERATING LIMITS REPORT, or
c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.6 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions/at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

  • See Special Test Exceptions Specifications 3.10.2 and 3.10.3.

With Kff greater than or equal to 1.0 Atbb TURKEY POINT - UNITS 3 & 4 3/4 1-26 AMENDMENT NOS. 167 AND 161

Page 1 of 1 INSERTS FOR ATTACHMENT 3 OF L-2006-209 INSERT A (TS 3/4.1.3.1 and TS 3/4.1.3.2 and SR 4.1.3.1.1)

"During Unit 3 Cycle 22, the position of Rod M-6 Control Bank C will be determined every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state, until the repair of the indication system for this rod is completed."

INSERT B (SR 4.1.3.1.1)

"During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state and it will not provide an input into the Rod Position Deviation Monitor.

The use of the alternate method for rod M-6 does not require the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> comparison of demanded versus actual position per 4.1.3.1.1."

INSERT C (SR 4.1.3.2.1)

"During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state and it will not provide an input into the Rod Position Deviation Monitor.

The use of the altemate method for rod M-6 does not require the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> comparison of demanded versus actual position per 4.1.3.2.1."

INSERT D (SR 4.1.3.6)

"During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state."

Turkey Point Unit 3 L-2006-209 Docket No. 50-250 Attachment 4 License Amendment Request Page 1 of 1 Inoperable Rod Position Indication TURKEY POINT UNIT 3 CLEAN TECHNICAL SPECIFICATION PAGES Pages 3/4 1-17 Pages 3/4 1-18 Pages 3/4 1-20 Pages 3/4 1-21 Pages 3/4 1-25 Pages 3/4 1-26

REACTIVITY CONTROL SYSTEMS 314.1.3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and positioned within the Allowed Rod Misalignment between the Analog Rod Position Indication **and the group step counter demand position within one hour after rod motion. The Allowed Rod Misalignment shall be defined as:

a. for THERMAL POWER less than or equal to 90% of RATED THERMAL POWER, the Allowed Rod Misalignment is +/- 18 steps, and
b. for THERMAL POWER greater than 90% of RATED THERMAL POWER, the Allowed Rod Misalignment is +/- 12 steps.

APPLICABILITY: MODES 1* and 2*

ACTION:

a. With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within I hour and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With more than one full length rod inoperable or misaligned from the group step counter demand position by more than +/- 12 steps and THERMAL POWER greater than 90% of RATED THERMAL POWER, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either.
1. Restore all indicated rod positions to within the Allowed Rod Misalignment, or
2. Reduce THERMAL POWER to less than 90% of RATED THERMAL POWER and confirm that all indicated rod positions are within the Allowed Rod Misalignment, or
3. Be in HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With more than one full length rod inoperable or misaligned from the group step counter demand position by more than +/- 18 steps and THERMAL POWER less than or equal to 90% of RATED THERMAL POWER, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either-.
1. Restore all indicated rod positions to within the Allowed Rod Misalignment, or
2. Be in HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
  • See Special Test Exceptions 3.10.2 and 3.10.3.
    • During Unit 3 Cycle 22, the position of Rod M-6 Control Bank C will be determined every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state, until the repair of the indication system for this rod is completed.

TURKEY POINT - UNITS 3 &4 3/4 1-17 AMENDMENT NOS. AND 221

REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

d. With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the Allowed Rod Misalignment of Specification 3.1.3.1, POWER OPERATION may continue provided that within one hour either:
1. The rod is restored to OPERABLE status within the Allowed Rod Misalignment of Specification 3.1.3.1, or
2. T"e remainder of the rods in the bank with the inoperable rod are aligned to within the Allowed Rod Misalignment of Specification 3.1.3.1 of the inoperable rod while maintaining the rod sequence and insertion limits of Specification 3.1.3.6; the THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent operation, or
3. The rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:

a) The THERMAL POWER level is reduced to less than or equal to 75% of RATED THERMAL POWER within one hour and within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the power range neutron flux high trip setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER. THERMAL POWER shall be maintained less than or equal to 75% of RATED THERMAL POWER until compliance with ACTIONS 3.1.3.1.d.3.c and 3.1.3.1.d.3.d below are demonstrated, and b) The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and c) A power distribution map is obtained from the movable incore detectors and Fa (Z) and FN are verified to be within their limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and d) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions.

SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The position

  • of each full length rod shall be determined to be within the Allowed Rod Misalignment of the group step counter demand position at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (allowing for one hour thermal soak after rod motion) except during time invervals when the Rod Position Deviation Monitor is inoperable, then verify the group positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. ** 1 4.1.3.1.2 Each full length rod not fully inserted in the core shall be determined to be OPERABLE by movement of at least 10 steps in any one direction at least once per 92 days.

During Unit 3 Cycle 22, the position of Rod M-6 Control Bank C will be determined every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state, until the repair of the indication system for this rod is completed.

During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state and it will not provide an input into the Rod Position Deviation Monitor. The use of the alternate method for rod M-6 does not require the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> comparison of demanded versus actual position per 4.1.3.1.1.

TURKEY POINT - UNITS 3 &4 3/4 1-18 AMENDMENT NOS. AND 221

I REACTIVITY CONTROL SYSTEMS POSITION INDICATION SYSTEMS - OPERATING LIMITING CONDITION FOR OPERATION (Continued) 3.1.3.2 The Analog Rod Position Indication System

  • and the Demand Position Indication System shall be OPERABLE and capable of determining the respective actual and demanded shutdown and control rod positions as follows:
a. Analog rod position indicators *, within one hour after rod motion (allowance for thermal soak);

All Shutdown Banks: within the Allowed Rod Misalignment of Specification 3.1.3.1 of the group demand counters for withdrawal ranges Of 0-30 steps and 200-All Rods Out as defined in the Core Operating Limits Report.

Control Bank A and B: within the Allowed Rod Misalignment of Specification 3.1.3.1 of the group demand counters for withdrawal ranges of 0-30 steps and 200-All Rods Out as defined in the Core Operating Umits Report.

Control Banks C and D: within the Allowed Rod Misalignment of Specification 3.1.3.1 of the group demand counters for withdrawal range of 0-All Rods Out as defined in the Core Operating Limits Report.

b. Group demand counters;
  • 2 steps.

APPLICABILITY: MODES 1 and 2.

ACTION:

a. With a maximum of one analog rod position indicator
1. Determine the position of the non-indicating rod(s)
  • indirectly by the movable incore detectors at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and within one hour after any motion of the non-indicating rod which exceeds 24 steps in one direction since the last determination of the rod's position, or
2. Reduce THERMAL POWER to less than 75% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
b. With a maximum of one demand position indicator per bank inoperable either.
1. Verify that all analog rod position indicators for the affected bank are OPERABLE and that the most withdrawn rod and the least withdrawn rod of the bank are within the Allowed Rod Misalignment of Specification 3.1.3.1 at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or
2. Reduce THERMAL POWER to less than 75% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
  • During Unit 3 Cycle 22, the position of Rod M-6 Control Bank C will be determined every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state, until the repair of the indication system for this rod is completed.

TURKEY POINT - UNITS 3 &4 3/4 1-20 AMENDMENT NOS. AND 221

REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.3.2.1 Each analog rod position indicator

  • shall be determined to be OPERABLE by verifying that the Demand Position Indication System and the Analog Rod Position Indication System
  • agree within the Allowed Rod Misalignment of Specification 3.1.3.1 (allowing for one hour thermal soak after rod motion) at least once per 12 II hours except during time intervals when the Rod Position Deviation Monitor **is inoperable, then compare the Demand Position Indication System and the Analog Rod Position Indication System at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.2.2 Each of the above required analog rod position indicator(s)

  • shall be determined to be OPERABLE by performance of a CHANNEL CHECK, CHANNEL CALIBRATION and ANALOG CHANNEL OPERATIONAL TEST performed in accordance with Table 4.1-1.
  • During Unit 3 Cycle 22, the position of Rod M-6 Control Bank C will be determined every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state, until the repair of the indication system for this rod is completed.

"During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state and it will not provide an input into the Rod Position Deviation Monitor. The use of the alternate method for rod M-6 does not require the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> comparison of demanded versus actual position per 4.1.3.2.1.

TURKEY POINT - UNITS 3 & 4 3/4 1-21 AMENDMENT NOS. AND 221

REACTIVITY CONTROL SYSTEMS SHUTDOWN ROD INSERTION LIMIT LIMITING CONDITION FOR OPERATION 3.1.3.5 All shutdown rods shall be fully withdrawn.

APPLICABILITY: MODES 1* and 2***

ACTION:

With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either:

a. Fully withdraw the rod, or
b. Declare the rod to be inoperable and apply Specification 3.1.3.1.

SURVEILLANCE REQUIREMENTS 4.1.3.5 Each shutdown rod shall be determined to be fully withdrawn:

a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criticality, and
b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
  • See Special Test Exceptions Specifications 3.10.2 and 3.10.3.
    • With Kf greater than or equal to 1.0 TURKEY POINT - UNITS 3 & 4 3/4 1-25 AMENDMENT NOS. AND 221

REACTIVITY CONTROL SYSTEMS CONTROL ROD INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.6 The control banks shall be limited in physical insertion specified in the Rod Bank Insertion Limits curve, defined in the CORE OPERATING LIMITS REPORT.

APPLICABILITY: MODES 1" and 2* **

ACTION:

With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2 either:

a. Restore the control banks to within the limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or
b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position specified in the Rod Bank Insertion Limits curve, defined in the CORE OPERATING LIMITS REPORT, or
c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.6 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions ***at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. I

  • See Special Test Exceptions Specifications 3.10.2 and 3.10.3.

With Ke greater than or equal to 1.0 During Unit 3 Cycle 22, the position of Rod M-6, Control Bank C, may be monitored by verifying gripper coil parameters of the Control Rod Drive Mechanism to determine it has not changed state.

TURKEY POINT - UNITS 3 & 4 3/4 1-26 AMENDMENT NOS. AND 161