L-18-144, Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report

From kanterella
Jump to navigation Jump to search

Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report
ML18331A089
Person / Time
Site: Beaver Valley
Issue date: 11/13/2018
From: Bologna R
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18331A065 List:
References
L-18-144
Download: ML18331A089 (6)


Text

FENOC Beaver Valley Power Station P.O. Box4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Richard D. Bologna 724-682-5234 Site Vice President Fax: 724-643-8069 November 13, 2018 L-18-144 10 CFR 50.71(e) 10 CFR 50.54(a) 10 CFR 54.37(b)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001

SUBJECT:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Submittal of the Updated Final Safety Analysis Report, Revision 31 In accordance with the requirements of 10 CFR 50.71(e), the FirstEnergy Nuclear Operating Company (FENOC) is hereby submitting to the Nuclear Regulatory Commission (NRC) the Beaver Valley Power Station (BVPS}, Unit No. 1, Updated Final Safety Analysis Report (UFSAR) Revision 31 in CD-ROM format. This submittal reflects facility and procedure changes implemented between October 25, 2016 (the end of Refueling Outage 24), and May 10, 2018 (the end of Refueling Outage 25), along with several changes implemented after Refueling Outage 25.

In accordance with 10 CFR 50.4(b)(6), the BVPS, Unit No. 1, UFSAR Revision 31 is being submitted electronically on a total replacement basis. As required by NRC guidance for electronic submissions to the Commission, Attachment 1 and 2 provide a listing of the document components that make up the two enclosed CD-ROMs. In addition to the UFSAR, the first enclosed CD-ROM includes the following:

  • BVPS, Unit No. 1 Licensing Requirements Manual (LRM), Revision 102
  • Technical Specification (TS) Bases, Revision 36 , submitted to satisfy TS 5.5.1O.d, which requires submittal of TS Bases changes implemented without prior NRC approval

Beaver Valley Power Station , Unit No. 1 L-18-144 Page 2 The second enclosed CD-ROM includes the BVPS-1 UFSAR, LRM, TS Bases and QAPM with information identified in accordance with NRG Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," removed .

For this BVPS-1 UFSAR update, no excessive detail, obsolete information , or redundant information has been removed in accordance with Appendix A to Nuclear Energy Institute (NEI) 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis Reports," as endorsed by Regulatory Guide 1.181, "Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71 (e). "

FENOC conducted a review of BVPS, Unit No. 1 plant changes for 10 CFR 54.37(b) applicability. No components were determined to meet the criteria for newly identified components as clarified by Regulatory Information Summary (RIS) 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.34(b) for Holders of Renewed Licenses."

In accordance with NEI 99-04, "Guidelines for Managing NRG Commitment Changes, "

Revision 0, as endorsed by NRG Regulatory Issue Summary 2000-17 , "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRG Staff," a summary of regulatory commitment changes is provided in Attachment 3.

This certifies, to the best of our judgment and belief, that Revision 31 of the BVPS , Unit No. 1 UFSAR accurately presents changes made since the previous submittal that are necessary to reflect information and analysis submitted to the Commission or pursuant to Commission requirements .

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Phil H. Lashley, Acting Manager - Nuclear Licensing and Regulatory Affairs , at (330) 315-6808 .

Beaver Valley Power Station , Unit No. 1 L-18-144 Page 3 Attachments:

1. List of Document Components on CD-ROM 1
2. List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015 -17 Removed)
3. Commitment Change Summary Report

Enclosures:

A. Beaver Valley Power Station , Unit No. 1 UFSAR, Licensing Requirements Manual, Technical Specification Bases, and QAPM (on CD-ROM 1)

B. Beaver Valley Power Station , Unit No. 1 UFSAR With Information Identified Per RIS 2015-17 Removed , Licensing Requirements Manual, Technical Specification Bases , and QAPM (on CD-ROM 2) cc: NRC Region I Administrator (without Enclosure B)

NRC Resident Inspector (without Enclosure B)

NRC Project Manager (without Enclosure B)

Director BRP/DEP (without Enclosures)

Site BRP/DEP Representative (without Enclosures)

Attachment 1 L-18-144 List of Document Components on CD-ROM 1 Page 1 of 1 File Name 001 UFSAR List of Effective Pages Rev 31 .pdf 76KB 002 UFSAR Section 1.pdf 1,337KB 003 UFSAR Section 2.pdf 43,358KB 004 UFSAR Section 3.pdf 3,918KB 005 UFSAR Section 4.pdf 1,757KB 006 UFSAR Section 5.pdf 4,143KB 007 UFSAR Section 6.pdf 7,701 KB 008 UFSAR Section 7.pdf 2,658KB 009 UFSAR Section 8.pdf 1,960KB 010 UFSAR Section 9.pdf 2,204KB 011 UFSAR Section 10.pdf 997KB 012 UFSAR Section 11 .pdf 1,136KB 013 UFSAR Section 12.pdf 91KB 014 UFSAR Section 13.pdf 415KB 015 UFSAR Section 14.pdf 6,665KB 016 UFSAR Section 15.pdf 131KB 017 UFSAR Section 16.pdf 332KB 018 UFSAR Appendix A.pdf 583KB 019 UFSAR Appendix B.pdf 1,742KB 020 BVPS-1 LRM Rev 102.pdf 33 ,744KB 021 BVPS TS Bases Rev 36 (Part 1 of 2) .pdf 35,747KB 022 BVPS TS Bases Rev 36 (Part 2 of 2).pdf 31 ,506KB 023 FENOC QAPM Rev 23.pdf 3,173KB

Attachment 2 L-18-144 List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)

Page 1 of 1 File Name 001 UFSAR List of Effective Pages Rev 31.pdf 76KB 002 UFSAR Section 1.pdf 1,134KB 003 UFSAR Section 2.pdf 42 ,898KB 004 UFSAR Section 3.pdf 3,918KB 005 UFSAR Section 4.pdf 1,756KB 006 UFSAR Section 5.pdf 2,917KB 007 UFSAR Section 6.pdf 7,701KB 008 UFSAR Section 7.pdf 2,658KB 009 UFSAR Section 8.pdf 3,584KB 010 UFSAR Section 9.pdf 2,204KB 011 UFSAR Section 10.pdf 997KB 012 UFSAR Section 11.pdf 1,136KB 013 UFSAR Section 12.pdf 91KB 014 UFSAR Section 13.pdf 415KB 015 UFSAR Section 14.pdf 6,665KB 016 UFSAR Section 15.pdf 131KB 017 UFSAR Section 16.pdf 332KB 018 UFSAR Appendix A.pdf 583KB 019 UFSAR Appendix B.pdf 1,742KB 020 BVPS-1 LRM Rev 102.pdf 33 ,744KB 021 BVPS TS Bases Rev 36 (Part 1 of 2).pdf 35,747KB 022 BVPS TS Bases Rev 36 (Part 2 of 2) .pdf 31 ,506KB 023 FENOC QAPM Rev 23.pdf 3,173KB

Attachment 3 L-18-144 Commitment Change Summary Report Page 1 of 1 COMMITMENT COMMITMENT NUMBER/SOURCE/DATE DESCRIPTION CHANGE REASON FOR CHANGE BV-A90058 The vendor technical manual Closed. Improved communication technology, such Letter to NRC, 09/25/1990 control procedure incorporates as internet websites and electronic mail, GL 83-028, 07/08/1983 a periodic vendor/manufacturer and updated programs and processes (that GL 90-003 , 03/20/1990 contact. Periodic vendor is, 10 CFR 21 reports, Maintenance Rule contact is made with vendors Program , OE, PWROG communications, of pre-determined "key" safety NSSS technical bulletins, nuclear safety related components and with advisory letters, service information letters) the NSSS vendor. provide a more effective and efficient means of ensuring key safety-related vendor manuals are current.

List of Abbreviations Used:

GL Generic Letter NSSS Nuclear Steam Supply System NRC Nuclear Regulatory Commission OE Operating Experience PWROG Pressurized Water Reactor Owners' Group