Submittal of Revision 25 to Updated Final Safety Analysis Report
ML20335A122
Person / Time
Site: Beaver Valley
Issue date: 11/23/2020
From: Grabnar J
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML20335A124 List:
References
L-20-186
Download: ML20335A122 (5)


Text

menergy*

~---* harbor John J. Gralmar

.Site Vjce Presfdent, Beaver Valley Nuclear Novembe*r 23, 2020 L-20-186.

A TIN: Document Control Desk U.S. Nuclear Regulatory Gommission Washington, _DC 20555-001

SUBJECT:

Beaver Valley Power Station, l)n,it Ne;>. 2 Docket No. 50-412, License No. NPF-73

£r,ergy Harbor Nuclear Corp.

Beaver Valky Power Station

  • .. 'P.O.Box4

,Shippingport, PA 15077 724-682-5234 10 CFR 50.71 (e) 10 CFR.54.37(b) s*ubmittal of the Updated Final Safety Analysis Report Revis.ion 25 In ace9rda~~ with the requirements of 10 CFR 50.('1(e), the Ene,rgy Harbor Nuclear Corp: is hereby su~mitting _!o the 'Nuclear Regulatory Comr:nission (NRC) the Beaver Valley. Power Station*, Unit No. 2 (BVPS-2), Updated Fimff Safety Analysis Report *

  • (UFSAR) ~evision 25 in CD-ROM fo~at. This subrriittal reflects facility. and procedure changes implemei:,ted betwee11 Nov~mber 14, 2018 (the end:of Refueling Outage ~O),,

and May 6, 2020 (the end of Refueling O.utage 21), along with several.changes imple~nteij after Refueling *outa_ge 2-1.

. In a~rdance with 10. CFR 50.4(b)(6), ~ BVPS:-~ UF~AR Revision 25 is being submitted electronically.on a total replacement basis. As. required by NRC guidance for electrQnic submissions to the Commission, Attachment 1 and 2 provide a listing of the

  • document components that make* up the two enclosed CD-ROMs. In addition to the
  • UFSAR, ttie first encl~d C~OM in~ludes the following:

BVPS-2 Li~nsing R~ujrements Manual.(LRM),. Revision 95

\\

Techni<?9I Spec~cation (TS) Bases,.Revision 38, submitted*to satisfy TS 5.5.1 O.c( which requires submittal of TS Bases changes implemented without prior NRC ap:proval.

The second enclosed CD-ROM*includes the BVPS-2 UFSAR, LRM, and.TS Bases with inforrna~on identified in *accordance with NRC Regulatory Issue Summary (RIS)

  • 2015-17, ".Review _and S~bmission of Updates to Final Safety Analysis ~eports,

. (

\\

Be~ver Valley Po~e*r Station, Uri it No, 2.

L-20-186 Page2 For this BVPS-2 UFSAR update, no excessive detail, obsolete information, or redundant

. information has been removed in accordance with Appendix A to Nuclear Energy lnstitu.te (NEI) 9.8-03, ~evision 1, "~uidellnes for Updatin9 FinaJ Safety Analysis

Energy Marbor Nuclear Corp. conducted a review of BVPS-2 plant changes for 10 CFR.54.37(b) applicability. No comPQnents were determined to meet th~ criteria for

  • newly identified compon~nts as claiified1>y-Regulatory Information Summary (~IS).

2007-16, Revision 1; *tmplementation of the Requirements of 10 CFR 54.34(b) for

.Hold~rs of Rene'!Ved Licen~s."

There are n*o regulatory*commitmerit changes to be subnil~d in acco.rdan.ce with.

NEI 99-04, !'Guidelfnes:for Managing*_N~C.Commitment.Changes,"* R_evision 0, as endorsed by_NRC RJS 200.0-17, "Managing Regulatc;,ry Commitmer:its Made by.Power Reactor Licensees to the NRC Staff."

This :certifies; _to tt,e best of our judgment.and belief, that Revision 25 of the BVPS-2 UFSAR accurately presents changes made since the previous submittal that are necessary to reflect information.and-analysis' submitted to the Commission or pursuant to Commission requirements~

This letter contains no new regulatory commitments. If you have any questions r:egarding this report, plea~ contact Mr; Phil H. Lashley, Manager-Fleet Ucensing, at (330) 696-7208.

  • I Si_nce~ly, o.,;,.,-,om

.. ~-.-Wli,,

Grabnar,jolm "PP :.:=:;-:-.

...,,_.s;,.

john J. *Grabner f

. Attachments:

1.

List of Document Components on* CD-ROM 1'

2.

List of Docunie.nt Components on CD-ROM 2 (Information Identified Per RIS 2015 -17:Removed)'.

4

Beaver Valley Power Statipn, Unit No, 2

.L-20-186 Page 3

Enclosures:

A.

Beaver Valley Pow~r Station,* Unit No. 2* UFSAR, Licensing Requirements* Manual, and Technical Specification Bases (on CD-ROM 1).

B.

_Beaver Valley Power Station, Unit No, 2. UFSAR With lnfonnation Identified Per RIS 2015-17 Removed, Licensing Requirements Manual, *and Technical. -

Specification Bases (on CD-ROM 2),

cc:

NRC Region I Administrator (witho.ut Enclosure B)

  • .* NRC R,esident Inspector (without Enclpsure 6)

NRG-Project Manager (without E;nclosur~ B)

Director BRP/DEP (w~hout Enclosures}'

~ite BRP/DEP Representative (without En.closures)

L-20.:186 List of Document Components oh' CD-ROM 1 *

  • Page 1 of 1
  • File Name 001 UFSAR List of Effective Pages Rev 25.paf 002 UFSAR Section 1.pdf.

003 UFSAR Section 2.pdf

.004 UFSAR Section 3.pdf 005 UFSAR Section 4.pdf

  • -006 i.JFSAR Se~on 5.ppf 007 UFSAR Section 6.pdf 00_8 UFSARSection 7.pdf

. 009 UF~AR Section 8.pdf

, *010 UFSAR Section 9.pdf

  • _011 UFSAR Section 1 0.pdf 012 UFSAR Section 1 '(.pdf*

.. 01*5 UFSAR Section 14.pdf 016. UFSAR ~ctlon 15.pdf

.017 UFSAR Secti.on 16.pdf 01*8 UFSAR Section 17.pdf 019-UFSAR Section 18.pd_f 020 UFSAR Sectio~ 19.pdf 021 BVPS-2 LRM Rev 95.pdf

. 022 BVPS TS Bases Rev 38.pdf 130KB 1,454KB 39,421KB 38,728KB 4,747KB 1_,6721<8 4,361KB 8,941KB 1,108KB 2,482KB

-1,8641<8

-1, 161-KB 1*3,753KB 1,225~.

  • 425KB.

. 7,7681q3 35KB-80KB 26KB 505KB 1,088KB 2,483KB L-20-186 List of Docu*ment Components on CD-ROM 2

_(lnfonnation Identified Per RIS 2015-17 Removed)

Page 1 of 1

_File Name 001 UFSAR List of Effective Pages Rev 25.pdf

004 U~SAR Section 3.pdf 005 UFSARSection 4.pdf 006 UFSAR Section 5.pdf 007.UFSAR Section 6.pdf.

.008 UfSAR Section 7.pdf 009 UFSAR Section 8.pdf 010 UFSAR Section-9.pdf 011 UFSAR_ Sec_tion 1_0.pdf 012_ UFSAR. Section 11.pdf 013 UFS_AR Section 12.pdf 014. UFSAR Section 13.pdf

. 015 UFSAR Sectio*n 14.pdf 016 UFSAR Section 15.pdf 017-UFSAR Se¢ion 16.pdf

  • 018 UFSAR Section.17.pdf 01'9 UFSAR Section 18.pdf *

. 020 UF'.SAR Sect10n 19.pdf 021 BVPS-2 L:RM Rev 95.pdf

  • 022 -BVPS TS Bases Rev 38.pdf
130KB
  • 1,247~8

. 38,291KB 29,142KB 4,748KB 1,673KB 4,319KB

  • a,941KB 1,108KB 2,151KB

.1,864KB.

1, 162KB 9,606KB 1,225KB 425KB 7,770KB 35KB.

80KB

  • 26KB 505KB 1,088KB 2,483KB