L-18-144, Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report
Text
FENOC FirstEnergy Nuclear Operating Company Richard D. Bologna Site Vice President November 13, 2018 L-18-144 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001
SUBJECT:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Submittal of the Updated Final Safety Analysis Report, Revision 31 Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 10 CFR 50.71(e) 10 CFR 50.54(a) 10 CFR 54.37(b)
In accordance with the requirements of 10 CFR 50.71(e), the FirstEnergy Nuclear Operating Company (FENOC) is hereby submitting to the Nuclear Regulatory Commission (NRC) the Beaver Valley Power Station (BVPS}, Unit No. 1, Updated Final Safety Analysis Report (UFSAR) Revision 31 in CD-ROM format. This submittal reflects facility and procedure changes implemented between October 25, 2016 (the end of Refueling Outage 24), and May 10, 2018 (the end of Refueling Outage 25), along with several changes implemented after Refueling Outage 25.
In accordance with 10 CFR 50.4(b)(6), the BVPS, Unit No. 1, UFSAR Revision 31 is being submitted electronically on a total replacement basis. As required by NRC guidance for electronic submissions to the Commission, Attachment 1 and 2 provide a listing of the document components that make up the two enclosed CD-ROMs. In addition to the UFSAR, the first enclosed CD-ROM includes the following:
BVPS, Unit No. 1 Licensing Requirements Manual (LRM), Revision 102 Technical Specification (TS) Bases, Revision 36, submitted to satisfy TS 5.5.1 O.d, which requires submittal of TS Bases changes implemented without prior NRC approval FENOC Quality Assurance Program Manual (QAPM), Revision 23, submitted in accordance with 10 CFR 50.54(a)
Beaver Valley Power Station, Unit No. 1 L-18-144 Page 2 The second enclosed CD-ROM includes the BVPS-1 UFSAR, LRM, TS Bases and QAPM with information identified in accordance with NRG Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," removed.
For this BVPS-1 UFSAR update, no excessive detail, obsolete information, or redundant information has been removed in accordance with Appendix A to Nuclear Energy Institute (NEI) 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis Reports," as endorsed by Regulatory Guide 1.181, "Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71 (e)."
FENOC conducted a review of BVPS, Unit No. 1 plant changes for 10 CFR 54.37(b) applicability. No components were determined to meet the criteria for newly identified components as clarified by Regulatory Information Summary (RIS) 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.34(b) for Holders of Renewed Licenses."
In accordance with NEI 99-04, "Guidelines for Managing NRG Commitment Changes,"
Revision 0, as endorsed by NRG Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRG Staff," a summary of regulatory commitment changes is provided in Attachment 3.
This certifies, to the best of our judgment and belief, that Revision 31 of the BVPS, Unit No. 1 UFSAR accurately presents changes made since the previous submittal that are necessary to reflect information and analysis submitted to the Commission or pursuant to Commission requirements.
This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Phil H. Lashley, Acting Manager - Nuclear Licensing and Regulatory Affairs, at (330) 315-6808.
Beaver Valley Power Station, Unit No. 1 L-18-144 Page 3 Attachments:
- 1.
List of Document Components on CD-ROM 1
- 2.
List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015 -17 Removed)
- 3.
Commitment Change Summary Report
Enclosures:
A.
Beaver Valley Power Station, Unit No. 1 UFSAR, Licensing Requirements Manual, Technical Specification Bases, and QAPM (on CD-ROM 1)
B.
Beaver Valley Power Station, Unit No. 1 UFSAR With Information Identified Per RIS 2015-17 Removed, Licensing Requirements Manual, Technical Specification Bases, and QAPM (on CD-ROM 2) cc: NRC Region I Administrator (without Enclosure B)
NRC Resident Inspector (without Enclosure B)
NRC Project Manager (without Enclosure B)
Director BRP/DEP (without Enclosures)
Site BRP/DEP Representative (without Enclosures)
L-18-144 List of Document Components on CD-ROM 1 Page 1 of 1 File Name 001 UFSAR List of Effective Pages Rev 31.pdf 002 UFSAR Section 1.pdf 003 UFSAR Section 2.pdf 004 UFSAR Section 3.pdf 005 UFSAR Section 4.pdf 006 UFSAR Section 5.pdf 007 UFSAR Section 6.pdf 008 UFSAR Section 7.pdf 009 UFSAR Section 8.pdf 010 UFSAR Section 9.pdf 011 UFSAR Section 10.pdf 012 UFSAR Section 11.pdf 013 UFSAR Section 12.pdf 014 UFSAR Section 13.pdf 015 UFSAR Section 14.pdf 016 UFSAR Section 15.pdf 017 UFSAR Section 16.pdf 018 UFSAR Appendix A.pdf 019 UFSAR Appendix B.pdf 020 BVPS-1 LRM Rev 102.pdf 021 BVPS TS Bases Rev 36 (Part 1 of 2).pdf 022 BVPS TS Bases Rev 36 (Part 2 of 2).pdf 023 FENOC QAPM Rev 23.pdf 76KB 1,337KB 43,358KB 3,918KB 1,757KB 4,143KB 7,701 KB 2,658KB 1,960KB 2,204KB 997KB 1, 136KB 91KB 415KB 6,665KB 131KB 332KB 583KB 1,742KB 33,744KB 35,747KB 31,506KB 3,173KB L-18-144 List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)
Page 1 of 1 File Name 001 UFSAR List of Effective Pages Rev 31.pdf 002 UFSAR Section 1.pdf 003 UFSAR Section 2.pdf 004 UFSAR Section 3.pdf 005 UFSAR Section 4.pdf 006 UFSAR Section 5.pdf 007 UFSAR Section 6.pdf 008 UFSAR Section 7.pdf 009 UFSAR Section 8.pdf 010 UFSAR Section 9.pdf 011 UFSAR Section 10.pdf 012 UFSAR Section 11.pdf 013 UFSAR Section 12.pdf 014 UFSAR Section 13.pdf 015 UFSAR Section 14.pdf 016 UFSAR Section 15.pdf 017 UFSAR Section 16.pdf 018 UFSAR Appendix A.pdf 019 UFSAR Appendix B.pdf 020 BVPS-1 LRM Rev 102.pdf 021 BVPS TS Bases Rev 36 (Part 1 of 2).pdf 022 BVPS TS Bases Rev 36 (Part 2 of 2).pdf 023 FENOC QAPM Rev 23.pdf 76KB 1,134KB 42,898KB 3,918KB 1,756KB 2,917KB 7,701KB 2,658KB 3,584KB 2,204KB 997KB 1,136KB 91KB 415KB 6,665KB 131KB 332KB 583KB 1,742KB 33,744KB 35,747KB 31,506KB 3,173KB
COMMITMENT NUMBER/SOURCE/DATE BV-A90058 Letter to NRC, 09/25/1990 GL 83-028, 07/08/1983 GL 90-003, 03/20/1990 List of Abbreviations Used:
Generic Letter L-18-144 Commitment Change Summary Report Page 1 of 1 COMMITMENT DESCRIPTION CHANGE The vendor technical manual Closed.
control procedure incorporates a periodic vendor/manufacturer contact. Periodic vendor contact is made with vendors of pre-determined "key" safety related components and with the NSSS vendor.
GL NSSS NRC OE PWROG Nuclear Steam Supply System Nuclear Regulatory Commission Operating Experience Pressurized Water Reactor Owners' Group REASON FOR CHANGE Improved communication technology, such as internet websites and electronic mail, and updated programs and processes (that is, 10 CFR 21 reports, Maintenance Rule Program, OE, PWROG communications, NSSS technical bulletins, nuclear safety advisory letters, service information letters) provide a more effective and efficient means of ensuring key safety-related vendor manuals are current.