FENOC Perry Nuclear Power Plant PO Box 97 10 Center Road FirstEnergy Nuclear Operating Company Perry- Oh'° 44081 David B. Hamilton 440-280-5382 Vice President April 5, 2017 L-17-039 10 CFR 50.46 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 2016 Annual Report of Emergency Core Cooling Svstem Errors and Model Changes Attached is the 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes for the Perry Nuclear Power Plant. FirstEnergy Nuclear Operating Company (FENOC) is submitting this report to the Nuclear Regulatory Commission (NRC) in accordance with 10 CFR 50.46(a)(3)(ii).

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at (330) 315-6810.

Sincerely, David B. Hamilton

Attachment:

2016 Annual Report of Emergency Core Cooling System Errors and Model Changes cc: NRC Region III Administrator NRC Resident Inspector NRC Project Manager

Attachment L-17-039 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes Page 1 of 1 New Errors and Changes:

Change in an acceptable evaluation model or application of such model:

None.

Errors:

' None.

Report Summary:

During 2016, with respect to the GE14 and GNF2 fuel types, there were no changes in an acceptable evaluation model or application, nor were there any errors identified.