L-09-244, Supplemental Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42

From kanterella
(Redirected from L-09-244)
Jump to navigation Jump to search

Supplemental Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42
ML092530242
Person / Time
Site: Beaver Valley
Issue date: 09/08/2009
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-09-244, TAC MD6593, TAC MD6594
Download: ML092530242 (6)


Text

FENOC Beaver Valley Power Station

__ _ __ _ P.O. Box 4 Company

~Shippingport, PA 15077 FirstEnergyNuclear Operating Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 September 8, 2009 L-09-244 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos. MD6593 and MD6594), and License Renewal Application Amendment No. 42 Reference 1 provided the FirstEnergy Nuclear Operating Company (FENOC) License Renewal Application (LRA) for the Beaver Valley Power Station (BVPS). Reference 2 provided Amendment No. 39 to Reference 1. Reference 3 provided Amendment No. 40 to Reference 1. Reference 4 provided Amendment No. 41 to Reference 1. This letter provides grammatical corrections and consistency with information provided in References 2, 3 and 4.

The Enclosure provides Amendment 42 to the BVPS LRA.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September _. 2009.

Sincerely, Peter P. Sena III A'ot4

Beaver Valley Power Station, Unit Nos. 1 and 2 L-09-244 Page 2

References:

1. FENOC Letter L-07-113, "License Renewal Application," August 27, 2007.
2. FENOC Letter L-09-205, "Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.

MD6593 and MD6594), and License Renewal Application Amendment No. 39,"

July 28, 2009

3. FENOC Letter L-09-242, "Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.

MD6593 and MD6594), and License Renewal Application Amendment No. 40,"

September 2, 2009.

4. FENOC Letter L-09-243,. "Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.

MD6593 and MD6594), and License Renewal Application Amendment No. 41,"

September 4, 2009

Enclosure:

Amendment No. 42 to the BVPS License Renewal Application cc: Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator cc: w/o Attachment or Enclosure Mr. B. E. Holian, NRC DLR Director Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP

ENCLOSURE Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2 Letter L-09-244 Amendment No. 42 to the BVPS License Renewal Application Page 1 of 4 License Renewal Application Sections Affected Table A.4-1 Table A.5-1 The Enclosure identifies the correction by Affected License Renewal Application (LRA)

Section, LRA Page No., and Affected Paragraph and Sentence. The count for the affected paragraph, sentence, bullet, etc. starts at the beginning of the affected Section or at the top of the affected page, as appropriate. Below each section the reason for the change is identified, and the sentence affected is printed in italics with deleted text fined-eu and added text underlined.

Enclosure L-09-244 Page 2 of 4 Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.4-1 Page A.4-9 Item No. 35 Information in FENOC License Renewal Amendment No. 41 superseded information in FENOC License Renewal Amendment No. 40, thus changing the source document for the following commitment. Commitment No. 35 in LRA Table A.4-1, "Unit 1 License Renewal Commitments," is revised as follows:

ImplementationRead Related LRA A

Item Item Commitment Im heme Source Section No./

Number Schedule Cmet Comments 35 FENOC will evaluate if an January 29, FENOC None appropriate/applicable statistical 2016 Letter method exists to gain additional L-09-242 insight into potential liner degradation. and Data gathered will be evaluated and used to determine the general state of FENOC the liner. Letter L-09-243

Enclosure L-09-244 Page 3 of 4 Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.5-1 Page A.5-10 Item No. 33 To make Commitment No. 33 in LRA Table A.5-1 consistent with Commitment No. 32 in LRA Table A.4-1 (which was changed in LRA Amendments No. 40 and No. 41), Commitment No. 33 in LRA Table A.5-1, "Unit 2 License Renewal Commitments," is revised as follows:

Related LRA No.

Item Implementation Sectio Number Commitment Schedule Source Section No./

Comments 33 Supplemental volumetric Examinations FENOC None examinations will be performed on the will commence Letter Unit 2 containment liner prior to the by the end of the L-09-205.

period of extended operation. SA Unit 2 Refueling FENOC minimum of seventy-five (one foot Outage in 2011. Letter square) randomly selected (as l.x nti..* L-09-243 described in FENOC Letter L-09-205) The random sample locations will be examined (as sample plan will and describedin FENOC Letter L-09-243). be completed by FENOC If degradationis identified, it will be May 27, 2027. Letter addressedthrough the corrective L-09-244 action program (as describedin FENOC Letter L-09-243).

Enclosure L-09-244 Page 4 of 4 Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.5-1 Page A.5-10 Item No. 36 Information in FENOC License Renewal Amendment No. 41 superseded information in FENOC License Renewal Amendment No. 40, thus changing the source document for the following commitment. Commitment No. 36 in LRA Table A.5-1, "Unit 2 License Renewal Commitments," is revised as follows:

ImplementationRead Related LRA A

Item temCommitment Ipeme Source Section No./

Number ComtetSchedule Cmet Comments 36 FENOC will evaluate if an May 27, 2027 FENOC None appropriate/applicable statistical Letter method exists to gain additional L-09-242 insight into potential liner degradation. and Data gathered will be evaluated and used to determine the general state of FENOC the liner. Letter L-09-243