ML20249B147
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/16/1998
From: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20249B148 List:
References
AL-95-06, AL-95-6, JPN-98-026, JPN-98-26, NUDOCS 9806220110
Download: ML20249B147 (2)


Text

- _ _ _ _ _ - - _ _ _ -

e

' ' 123 Main Street

. White Plains, New York 10601

, 914 081 4950 914 2873309 (Fex)

  1. > NewWrkPower a.-ou  !

4# Authority mga"lgt"l~

i June 16,1998 JPN-98-026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 1

i

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Technical Specification Changes Regarding the Relocation of the SRC Review and Audit Requirements (JPTS-98-001)

Dear Sir:

This application for amendment seeks to revise Section 6 of Appendix A of the James A.

FitzPatrick Technical Specifications. Specifically, the following Technical Specificat. ion .

subsections are affected: l 6.5.2.8 - Safety Review Committee (SRC) Reviews;

/

. 6.5.2.9 - SRC Audits; and

.- 6.5.2.11 - SRC Records.

/

These changes relocate the SRC review, audit, and related record keeping requirements from the Technical Specifications to Chapter 17 of the Final Safety Analysis Report (FSAR) (i.e., Quality Assurance Program). The relocation of these requirements is in /

accordance with the guidance contain 3d in Administrative Letter 95-06.

7 /

Enclosed for filir6 is the signed onginal of a document entitled, " Application for Amendment to Operating License," together with Attachments I and 11, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation. A mark-up of the affected Technical Specification pages (for information only) is provided in Attachment lli. Attachment IV corttains a description of the changes to Chapte' 17 of the FSAR, and Attachments V and VI contain the proposed changes to the Quality Assurance Program, and a markup of these proposed changes (for information only).

In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being submitted to the designated New York State official.

-*n

^'

9906220110 9806$6 PDR ADOCK 05000333!

P PDR g

The're are no new commitments contained in this submittal. If you have any questions, l

please contact Ms. C. D. Faison.

Very truly yo rs, u l Senior Vice President and hief Nuclear Officer l

' Attachments: As stated l

cc: Regional Administrator j U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

)

i Office of the Resident inspector James A. FitzPatrick Nuclear Power Plant l U.S. Nuclear Regulatory Commission j P.O. Box 136 1 l_ Lycoming, NY 13093 l

l Mr. F. William Valentino, President  !

New York State Energy, Research, and Development Authority 1

)

Corporate Plaza West

- 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Joseph F. Williams, Project Manager  !

Project Directorate 1-1

. Division of Reactor Projects - 1/11 l l U.S. Nuclear Regulatory Commission  ;

l Mail Stop OWFN 14E21 ,

Washington, DC 20555 l l

l' l

l L .- - - - .---_--------__ .._ --_- s