JPN-95-030, Forwards ISI Summary Rept..., Providing Summary of ISI Exams Conducted During 1995 Refuel Outage (Reload 11/Cycle 12).Info Re Operating Status of FW Nozzle Leakage Monitoring Sys & Measured Leakage for FW Nozzles Also Encl

From kanterella
(Redirected from JPN-95-030)
Jump to navigation Jump to search
Forwards ISI Summary Rept..., Providing Summary of ISI Exams Conducted During 1995 Refuel Outage (Reload 11/Cycle 12).Info Re Operating Status of FW Nozzle Leakage Monitoring Sys & Measured Leakage for FW Nozzles Also Encl
ML20085L513
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/20/1995
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085L517 List:
References
JPN-95-030, JPN-95-30, NUDOCS 9506280534
Download: ML20085L513 (3)


Text

p w-

.k 123 Main street White Plains, New York 10601 91/.481-6840 914-287-3309 (FAX)

J >

'r Wmiam J. Cahili, Jr.

ter Authority c"--o-l June 20, 1995 JPN-95-030 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Inservice inspection Summary Report 1995 Refuel Outaae (Reload 11/Cvele 12)

Reference:

NYPA letter, W. A. Josiger to NRC (JPN-94-031), NUREG-0619 Inspection ,

Program for Feedwater Nozzles," dated July 19,1994. ,

f')

v

Dear Sir:

This letter submits the Inservice Inspection (ISI) Summary Report for the James A.

FitzPatrick Nuclear Power Plant as required by Article IWA-6230 of Section XI of the ASME Boiler and Pressure Vessel Code. The report provides a summary of the ISI examinations conducted during the 1995 Refuel Outage (Reload 11/ Cycle 12). The report also provides information regarding the operating status of the feedwater nozzle Leakage Monitoring -

System, and measured leakage for the feedwater nozzles. By July 31,1995, the Authority will submit a follow-up letter explaining why partial examinations were performed on two of the four spargers during the 1995 Refuel Outage, along with a schedule to complete the inspections.

If you have any questions, please contact Ms. C. D. Faison.

Very truly yours, i

ff ' lY' William J. ' ahill, Jr.

Chief Nuclear Officer  ;

cc: next page

'k 73-

,I 260070 A 5062so534 950620 pDR - ' '

I g ADDCK 0500o333 PDR A

y f' .1 cc: Regional Administrator i ,) U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 ,

I Lycoming, NY 13093 Mr. C. E. Carpenter, Project Manager Project Directorate 11 Division of Reacto- ojects-1/II U. S. Nuclear Regoutory Commission Mail Stop 14 B2 Washington, DC 20555 >

Attachments:

1. Summary of Commitments
11. Inservice inspection Summary Report For The 1995 Refuel Outage i

l l

l 1

r

.J

l t

Attachment I to JPN-95-030 j O s o - e a c - ii m ai.  !

Commitment Commitment Due Date i Number  ;

i JPN-95-030-001 Submit a follow-up letter explaining why partial July 31,1995 j examinations were performed on two of the four l

spargers during the 1995 Refuel Outage, along  ;

with a schedule to complete the inspections. l a

I i

l l

O  :

i I

t 5

l O

- -