JPN-91-043, Forwards List of Short Term Actions Identified at 910802 Meeting Re Recent Developments on Fire Protection at Plant

From kanterella
(Redirected from JPN-91-043)
Jump to navigation Jump to search
Forwards List of Short Term Actions Identified at 910802 Meeting Re Recent Developments on Fire Protection at Plant
ML20082H810
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/16/1991
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JPN-91-043, JPN-91-43, NUDOCS 9108260285
Download: ML20082H810 (4)


Text

_ _ - - - - -

r E Whde Plainn, New York 10601

. 914 t41 ( M6 t

  1. > NewYorkPower n. ,s t. o..oi.

4# Authority t ryO;r "'

August 16,1991 JPN 91-043 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mall Station P1 137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No.50 333 Schedule for Short Term Fire Protection Actions

Dear Sir:

New York Power Authority personnel met with NRC staff members on August 2,1991, at the NRC's Region I officos to outline recent developments concerning fire protection at the FitzPatrick Nuc!sar Power Plant. At that mooting, the Authority committed to submit a schedule for each of the short and long term actions identified in the meeting handout.

Attached is a list of the short term actions identified at that meeting. The Authority will complete each of the actions on the attached list prior to startup from the next FitzPatrick refuel outago.

A schedule for long terrn actions will be submitted not later than September 2,1991.

If you have any questions regarding any of these actions, please contact Mr. J. A. Gray, Jr.

Very truly yo' s n Rap Executive Vice President Nucler.r Generation cc: Next page 9108260285 910816 PDR ADOCK 05000333 )' l P PDR }

4-

. cc: . U. S. Nuclear Regulatory Commission

- 475 Allendale Road

. King of Prussia, PA 19406

. Office of the Resident inspector

- U. S. Nuclear Regulatory Commission P. O. Box 136 Lycoming, NY 13093 -

Mr. Brian C. McCabe

Project Directorate 11 Division of Reactor Projects l/11  ;

- U. S. Nuclear Regulatory Commission Mail Stop_14 B2

' Washington, DC 20555 .

l

.l

=

1 w y--- -

i  ;'

~ Attachment I to JPN 91043 New York Power Authority

' James A. FitzPatrick Nuclear Power Plant Schedule for Short Term Fire Protection Actions ,

l The Authority will complete each of the following actions. prior to startup from the next

- FitzPatrick refuel outage.

The presentation handout identified Control Room / Relay Room ventilation (Item 5) as .

both a start up and a short term issue, immediately after the formal presentation, this  ;

contradiction was brought to the attention of the NRC staff. The Author;ty stated that the

- Control Room / Relay Room ventilation concerns would be resolved as a short-term issue. The staff acknowiedged the change. 3 e

1. - - Modify (or replace, as appropriate) the following fire dampers

67FD-4 67FD5 67FD-13 67FD-18

- 67FD-26 69FD-35 70FD-3 70FD4 ..

70FD-5 70FD4 70FD-7 70FD.10 72FD 12 73FD 1 A -

73FD-18.

.73FD-10 -

73FD-1D - >

- 73FD 1E 73FD 1F

2. Complete evaluation of installed fire door closure and gaps. Complete any

, necessary modifications.'

Pagc1 l-l: -- - _ , .

,  ; ' Attachment i to JPN 91@@ t i

l

3. Completo evaluation to determine twad for fire pro!9etion of exposed structural  !

steel in the Battery Charger Rooms. Comploie any nocessary modifications. l

4. Install suppression system in Battery Room corridor (Atoa XVl/Zono BR 5). J
5. Complete evaluation of Control Room / Relay Room ventilation (Fire Area Ill/Firo Zones" .a 'd RR 1). Complete any necessary modificatims.
6. Resoh auch
  • dings on NFPA codo compilance and design reviews.
7. Assur. 4npliance with modification procedures for firo protection evaluations.
8. Complete the review of twenty randomly soloctod, previously installed modifications for fire protection and Appendix R concerns. Rosolve any identified concerns.
9. Install fire detection in Fire Area IE/Firo Zono TB 1, north of the Electric Bays, i

i Page 2 i-l

. _ - .-. - _ _ . - - - - . _ __ - _. _ .-