Federal Bureau of Investigation'S (FBI) Awareness of National Security Issues and Response (ANSIR) ProgramML031050167 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Issue date: |
05/07/1998 |
---|
Revision: |
0 |
---|
From: |
Roe J W, TenEyck E Q NRC/NMSS/FCSS, Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
IN-98-017, NUDOCS 9805050441 |
Download: ML031050167 (13) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Category:NRC Information Notice
MONTHYEARInformation Notice 2020-02, Flex Diesel Generator Operational Challenges2020-09-15015 September 2020 Flex Diesel Generator Operational Challenges ML20225A0322020-09-0303 September 2020 NRC Choice Letter to NAC International with Attached Safety Inspection Report, IR 0721015/2020201, February 24-27, 2020 and July 22, 2020, Inspection of NAC International in Norcross, Georgia Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs.2019-11-30030 November 2019 PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. Information Notice 2011-20, NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)2019-07-24024 July 2019 NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011) ML19196A2452019-07-15015 July 2019 Public Notice - Sequoyah Nuclear Plant, Unit 2 - Exigent Amendment to Facility Operating License Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2012-11, Age Related Capacitor Degradation2012-07-23023 July 2012 Age Related Capacitor Degradation ML12031A0132012-02-0606 February 2012 U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, Cpn International, Inc Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-26026 September 2011 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-15, Steel Containment Degradation and Associated License Renewal Aging Management Issues2011-08-0101 August 2011 Steel Containment Degradation and Associated License Renewal Aging Management Issues Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-26026 July 2011 Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-13, Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-13, Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13)2011-06-29029 June 2011 Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13) Information Notice 2011-13, OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-262010-12-21021 December 2010 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 ML13066A1872009-12-16016 December 2009 Draft NRC Information Notice 2009-xx - Underestimate of Dam Failure Frequency Used in Probabilistic Risk Assessments ML1007804482009-11-23023 November 2009 Email from Peter Bamford, NRR to Pamela Cowan, Exelon on TMI Contamination Control Event Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-112009-07-0707 July 2009 NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10)2009-07-0707 July 2009 Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation2008-07-0707 July 2008 Reactor Trip Due to Off-Site Power Fluctuation Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 12008-06-18018 June 2008 Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-0707 April 2008 Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 1991-09, Counterfeiting of Crane Valves2007-09-25025 September 2007 Counterfeiting of Crane Valves Information Notice 2007-28, Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls2007-09-19019 September 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station2007-03-30030 March 2007 Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems2007-02-0909 February 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures2007-02-0909 February 2007 Vertical Deep Draft Pump Shaft and Coupling Failures Information Notice 2006-31, Inadequate Fault Interrupting Rating of Breakers2006-12-26026 December 2006 Inadequate Fault Interrupting Rating of Breakers Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear Information Notice 2006-13, E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination2006-07-13013 July 2006 E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination 2020-09-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>. |
May 7, 1998
NRC INFORMATION NOTICE 98-17: FEDERAL BUREAU OF INVESTIGATION'S (FBI)AWARENESS OF NATIONAL SECURITY ISSUES ANDRESPONSE (ANSIR) PROGRAM
Addressees
- All U.S. Nuclear Regulatory Commission (NRC) fuel cycle and power and non-power reactorlicensees.
Purpose
- The NRC is issuing this information notice to advise addressees of the FBI's ANSIR Programand its availability to corporate security professionals. It is expected that recipients will reviewthis information for applicability to their physical protection programs and consider participationin the program. However, suggestions contained in this information notice are not NRCrequirements; no specific actions or written response is required.
Description of Circumstances
- The FBI's ANSIR Program was designed and established to develop a nationwidecommunications network among non-U.S. government security managers, corporate securityprofessionals, law enforcement organizations, and others, on a variety of security-relatedissues. The ANSIR Coordinator in the local FBI field office is the primary point of contact for allinformation disseminated by this system. ANSIR provides unclassified information, via e-mail,to organizations that request to be placed on distribution and are approved by the FBI. Forfurther information or to request participation in the ANSIR program, contact the ANSIRCoordinator at the closest FBI Field Office (Attachment 1).Discussion:Among its many threat assessment program activities, NRC participates in the FBI terroristthreat advisory and warning system. NRC also is a recipient of the FBI's ANSIRcommunications and will review them as part of NRC's ongoing threat assessment andevaluation program. It Is expected that ANSIR communications will duplicate some of theinformation provided to NRC through the FBI terrorist threat advisory and warning system andother Intelligence Community communications.Although the ANSIR program is available to security managers, NRC licensees arereminded that NRC will continue to review all threat-related information, and NRC will advise9850/ g PR L'F A s q9_tl qv50l IN 98-17May 7, 1998 other agencies' assessments. Absent an NRC advisory, any licensee response to an ANSIRmessage to increase security above the licensee's normal level of security and commitmentswould be entirely voluntary. As in the past, licensees may contact NRC regional safeguardsstaff regarding threat-related matters at any time. Non-power reactor licensees should continuetheir contact with Headquarters staff.This information notice requires no specific actions or written response. If you have anyquestions about the information in this notice, please contact the technical contacts listedbelow.Elizabeth Q. Ten Eyck, DirectorDivision of Fuel Cycle Safetyand SafeguardsOffice of Nuclear Material Safetyand SafeguardsJack W. Roe, Acting DirectorDivision of Reactor Program ManagementOffice of Nuclear Reactor RegulationTechnical contacts: John Davidson, NMSS(301) 415-8130E-Mail: jdenrc.govRobert Skelton, NRR(301) 415-3309E-Mail: rfsl@nrc.gov
Attachments:
1. List of FBI Field Offices2. List of Recently Issued NMSS Information Notices3. List of Recently Issued NRR Information NoticesA 77F 4 /Af;-L E ..':r .G K>Attachment 1IN 98-17May 7, 1998 FBI Field OfficesAddresses and Telephone Numbers56 locations in major U.S. cities and Puerto RicoALABAMAFederal Bureau of InvestigationRoom 14002121 8th. Avenue N.Birmingham, Alabama 35203(205) 252-7705Federal Bureau of InvestigationOne St. Louis Centre1 St. Louis Street, 3rd. FloorMobile, Alabama 36602(334) 438-3674ALASKAFederal Bureau of Investigation101 East Sixth AvenueAnchorage, Alaska 99501(907) 258-5322ARIZONAFederal Bureau of InvestigationSuite 400201 East Indianola AvenuePhoenix, Arizona 85012(602) 279-5511ARKANSASFederal Bureau of InvestigationSuite 200Two Financial Centre10825 Financial Centre ParkwayLittle Rock, Arkansas 72211-3552(501) 221-9100CALIFORNIAFederal Bureau of InvestigationSuite 1700, FOB11000 Wilshire BoulevardLos Angeles, California 90024(310) 477-6565Federal Bureau of Investigation4500 Orange Grove AvenueSacramento, California 95841-4205(916) 481-9110Federal Bureau of InvestigationFederal Office Building9797 Aero DriveSan Diego, California 92123-1800(619) 565-1255Federal Bureau of Investigation450 Golden Gate Avenue, 13th. FloorSan Francisco, California 94102-9523(415) 553-7400COLORADOFederal Bureau of InvestigationFederal Office Building, Suite 18231961 Stout Street, 18th. FloorDenver, Colorado 80294(303) 629-7171 Attachment 1IN 98-17May 7, 1998 CONNECTICUTFederal Bureau of InvestigationRoom 535, FOB150 Court StreetNew Haven, Connecticut 06510(203) 777-6311FLORIDAFederal Bureau of InvestigationSuite 2007820 Arlington ExpresswayJacksonville, Florida 32211(904) 721-1211Federal Bureau of Investigation16320 Northwest Second AvenueNorth Miami Beach, Florida 33169(305) 944-9101Federal Bureau of InvestigationRoom 610, FOB500 Zack StreetTampa, Florida 33602(813) 273-4566GEORGIAFederal Bureau of InvestigationSuite 4002635 Century Parkway, NortheastAtlanta, Georgia 30345(404) 679-9000HAWAIIFederal Bureau of InvestigationRoom 4307, Kalanianaole FOB300 Ala Moana BoulevardHonolulu, Hawaii 96850(808) 521-1411ILLINOISFederal Bureau of InvestigationRoom 905E.M. Dirksen Federal Office Building219 South
Dearbom StreetChicago,
Illinois 60604(312) 431-1333Federal Bureau of InvestigationSuite 400400 West Monroe StreetSpringfield, Illinois 62704(217) 522-9675INDIANAFederal Bureau of InvestigationRoom 679, FOB575 North Pennsylvania StreetIndianapolis, Indiana 46204(317) 639-3301KENTUCKYFederal Bureau of InvestigationRoom 500600 Martin Luther King Jr. PlaceLouisville, Kentucky 40202(502) 583-3941LOUISIANAFederal Bureau of InvestigationSuite 22001250 Poydras StreetNew Orleans, Louisiana 70113-1829(504) 522-4671MARYLANDFederal Bureau of Investigation7142 Ambassador RoadBaltimore, Maryland 21244-2754(410) 265-8080 Attachment 1IN 98-17May 7, 1998 MASSACHUSETTSFederal Bureau of InvestigationSuite 600One Center PlazaBoston, Massachusetts 02108(617) 742-5533MICHIGANFederal Bureau of Investigation26th. Floor, P. V. McNamara FOB477 Michigan AvenueDetroit, Michigan 48226(313) 965-2323MINNESOTAFederal Bureau of InvestigationSuite 1100111 Washington Avenue, SouthMinneapolis, Minnesota 55401(612) 376-3200MISSISSIPPFederal Bureau of InvestigationRoom 1553, FOB100 West Capitol StreetJackson, Mississippi 39269(601) 948-5000MISSOURIFederal Bureau of InvestigationRoom 300, U.S. Courthouse811 Grand Ave.Kansas City, Missouri 64106(816) 221-610Federal Bureau of InvestigationRoom 2704L. Douglas Abram Federal Bldg.1520 Market StreetSt. Louis, Missouri 63103(314) 241-5357NEBRASKAFederal Bureau of Investigation10755 Burt StreetOmaha, Nebraska 68114(402) 493-8688NEVADAFederal Bureau of Investigation700 East Charleston BoulevardLas Vegas, Nevada 89101(702) 385-1281NEW JERSEYFederal Bureau of InvestigationI Gateway Center, 22nd. FloorNewark, New Jersey 07102-9889(201) 622-5613NEW MEXICOFederal Bureau of InvestigationSuite 300415 Silver Avenue, SouthwestAlbuquerque, New Mexico 87102(505) 224-2000NEWYORKFederal Bureau of InvestigationSuite 502, James T. Foley Bldg.445 BroadwayAlbany, New York 12207(518) 465-7551Federal Bureau of InvestigationOne FBI PlazaBuffalo, New York 14202-2698(716) 856-7800Federal Bureau of Investigation26 Federal Plaza, 23rd. FloorNew York, New York 10278(212) 384-1000 l JAttachment 1IN 98-17May 7, 1998 NORTH CAROLINAFederal Bureau of InvestigationSuite 900400 South Tyron StreetCharlotte, North Carolina 28285(704) 377-9200OHIOFederal Bureau of InvestigationRoom 9023550 Main StreetCincinnati, Ohio 45273-8501(513) 421-4310Federal Bureau of InvestigationRoom 3005Federal Office Building1240 East 9th StreetCleveland, Ohio 44199-9912(216) 522-1400OKLAHOMAFederal Bureau of InvestigationSuite 160050 Penn PlaceOklahoma City, Oklahoma 73118(405) 290-7770OREGONFederal Bureau of InvestigationSuite 401, Crown Plaza Building1500 Southwest 1st AvenuePortland, Oregon 97201(503) 224-4181Federal Bureau of InvestigationSuite 300.U.S. Post Office Building700 Grant StreetPittsburgh, Pennsylvania 15219(412) 471-2000PUERTO RICOFederal Bureau of InvestigationRoom 526, U.S. Federal Bldg.150 Carlos Chardon AvenueHato ReySan Juan, Puerto Rico 00918-1716(809) 754-6000SOUTH CAROLINAFederal Bureau of InvestigationRoom 13571835 Assembly StreetColumbia, South Carolina 29201(803) 254-3011TENNESSEEFederal Bureau of InvestigationSuite 600, John J. Duncan FOB710 Locust StreetKnoxville, Tennessee 37902(423) 544-0751Federal Bureau of InvestigationSuite 3000, Eagle Crest Bldg.225 North Humphreys Blvd.Memphis, Tennessee 38120-2107(901) 747-4300PENNSYLVANIAFederal Bureau of Investigation8th. FloorWilliam J. Green Jr. FOB600 Arch StreetPhiladelphia, Pennsylvania 19106(215) 829-2700 Attachment 1IN 98-17May 7, 1998 TEXASFederal Bureau of InvestigationRoom 3001801 North LamarDallas, Texas 75202(214) 720-2200Federal Bureau of InvestigationSuite C-600700 East San Antonio AvenueEl Paso, Texas 79901-7020(915) 533-7451Federal Bureau of InvestigationRoom 2002500 East TC JesterHouston, Texas 77008-1300(713) 868-2266Federal Bureau of InvestigationSuite 200U.S. Post Office & Courthouse Bldg.615 East Houston StreetSan Antonio, Texas 78205(210) 225-6741Federal Bureau of Investigation111 Greencourt RoadRichmond, Virginia 23228(804) 261-1044WASHINGTONFederal Bureau of InvestigationRoom 710915 Second AvenueSeattle, Washington 98174-1096(206) 622-0460WASHINGTON, D.C.Federal Bureau of InvestigationWashington Metropolitan Field Office1900 Half Street, SWWashington, D.C. 20024(202) 252-7801VfnSCONSINFederal Bureau of InvestigationSuite 600330 East Kilboum AvenueMilwaukee, Wisconsin 53202-6627(414) 276-4684UTAHFederal Bureau of InvestigationSuite 1200, 257 Towers Bldg.257 East, 200 SouthSalt Lake City, Utah 84111(801) 579-1400VIRGINIAFederal Bureau of Investigation150 Corporate BoulevardNorfolk, Virginia 23502(804) 455-0100 IKJ1-Attachment 2IN 98-17May 7, 1998 LIST OF RECENTLY ISSUEDNMSS INFORMATION NOTICESInformation Date ofNotice No. Subject Issuance Issued to98-16 Inadequate Operational Checks 4/30/98 All Industrial Radiographyof Alarm RatemetersLicensees98-12Licensees' ResponsibilitiesRegarding Reporting andFollow-up Requirements forNuclear-Powered PacemakersApril 3, 1998All U.S. Nuclear RegulatoryCommission nuclear pacemakerlicensees98-1098-0998-08Probable MisadministrationsOccurring During IntravascularBrachytherapy With TheNovoste Beta-Cath SystemCollapse of an Isocam II, Dual-Headed Nuclear Medicine Gamma-Camera4/3/983/5198Information Likely to be Requested 3/3/98if an Emergency is DeclaredAll Medical LicenseesAll medical licenseesAll parts 30, 40, 70, 72 and 76licensees and certificate holdersrequired to have a NuclearRegulatory Commission approvedEmergency plan.All NRC Licensees authorizedto Possess Licensed MaterialsAll U.S. Nuclear RegulatoryCommission licensees.All portable gauge licenseesAll industrial radiographylicensees98-0698-04Unauthorized use of Licenseto Obtain Radioactive Materials,and its Implications Under TheExpanded Title 18 of the U.S. Code1997 Enforcement Sanctions forDeliberate Violations of NRCEmployee ProtectionRequirementsThefts of Portable GaugesRecent Failures of ControlCables Used on AmershamModel 660 Posilock RadiographySystems2/19/98219/981/15/9812/31/9798-0197-91 v'IAttachment 3IN 98-17May 7, 1998 LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICESInformation Date ofNotice No. Subject Issuance Issued to97-63, SupplStatus of NRC StaffsReview of BWRVIP-055/7/9898-1698-1598-1498-1398-1298-11Inadequate Operational Checksof Alarm RatemetersIntergrity of Operator LicensingExaminationsUndocumented Changes toNon-Power Reactor SafetySystem WiringPost-Refueling Outage ReactorPressure Vessel Leak TestingBefore Core CriticalityLicensees' ResponsibilitiesRegarding Reporting and Follow-upRequirements for Nuclear-PoweredPacemakersCracking of Reactor VesselInternal Baffle Former Boltsin Foreign Plants4/30/984120/984/201984/20/984131983125198All Industrial RadiographyLicenseesAll holder of operating licensesfor nuclear power reactors exceptthose that have permanentlyceased operations and havecertified that fuel has beenpermanently removed from thereactor vesselAll holders of operating licensesor construction permits for testresearch reactorsAll holders of operating licensesfor nuclear power reactors exceptthose that have permanentlyceased operations and havecertified that fuel has beenpermanently removed from thereactor vesselAll U.S. Nuclear RegulatoryCommission nuclear pacemakerlicenseesAll holders of operating licensingfor pressurized-water reactors(PWRs) except those who haveceased operation and havecertified that fuel has beenpermanently removed from thereactor vessel.OL = Operating LicenseCP = Construction Permit IN 98-17May 7, 1998 other agencies' assessments. Absent an NRC advisory, any licensee response to an ANSIRmessage to increase security above the licensee's normal level of security and commitmentswould be entirely voluntary. As in the past, licensees may contact NRC regional safeguardsstaff regarding threat-related matters at any time. Non-power reactor licensees should continuetheir contact with Headquarters staff.This information notice requires no specific actions or written response. If you have anyquestions about the information in this notice, please contact the technical contacts listedbelow.Original signed byMichael F. Wber FORElizabeth Q. Ten Eyck, DirectorDivision of Fuel Cycle Safetyand SafeguardsOffice of Nuclear Material Safetyand SafeguardsOriginal signed byD. B. Matthews FORJack W. Roe, Acting DirectorDivision of Reactor Program ManagementOffice of Nuclear Reactor RegulationTechnical contacts: John Davidson, NMSS(301) 415-8130E-Mail: jd@nrc.govRobert Skelton, NRR(301) 415-3309E-Mail: rfsl@nrc.gov
Attachments:
1. List of FBI Field Offices2. List of Recently Issued NMSS Information Notices3. List of Recently Issued NRR Information Notices*See Previous ConcurrenceDOCUMENT NAME: S:MDRPMSECFBI.INTo receive a copy of this document, indicate In the box C=Copy wlo attachmentlenclosure E=Copy with attachmenteendosure N = No copyOFFICE TECH ED FCOB:FCSS FCOB:FCSS C:FCOB:FCSS DD:FCSSElNAME EKraus, NMSS* JDavidson* RWarren* PTing* EWBrachDATE 3/27/98 412/98 412198 4128 4/298OFFICE _ D/FCSS IMOB PSGI PECB l (AD:DRPMNAME EQTen Eyck KRamsey* RSkelton' JStolz* JRoe*DATE 4/7/98 4/7/98 4117198 4/21/98 5/4/98OFFICIAL RECORD COPY f*IN 98-XXApril XX, 1998 other agencies' assessments. Absent an NRC advisory, any licensee response to an ANSIRmessage to increase security above the licensee's normal level of security and commitmentswould be entirely voluntary. As in the past, licensees may contact NRC regional safeguardsstaff regarding threat-related matters at any time. Non-power reactor licensees should continuetheir contact with Headquarters staff.This information notice requires no specific actions or written response. If you have anyquestions about the information in this notice, please contact the technical contacts listedbelow.Elizabeth Q. Ten Eyck, DirectorDivision of Fuel Cycle Safetyand SafeguardsOffice of Nuclear Material Safetyand SafeguardsJack W. Roe, Acting DirectorDivision of Reactor Program ManagementOffice of Nuclear Reactor RegulationTechnical contacts:John Davidson, NMSS(301) 415-8130E-Mail: jd@nrc.govRobert Skelton, NRR(301) 415-3309E-Mail: rfs1@nrc.gov
Attachments:
1. List of FBI Field Offices2. List of Recently Issued NMSS Information Notices3. List of Recently Issued NRR Information NoticesTo receive a copy of this document, Indicate In the box C=Copy who attachment/encdosure E=Copy with attachment/enclosure N = No copyDOCUMENT NAME: S:\DRPMSEC\FBI.INn -n aiv e -, 1E tho this .d ment Indicatp in t hrne C=Conv win attacohment/enclosure E=Coov with attachment/enclosure N = No copyOFFIC TECH ED FCOB:FCSS FCOB:FCSS C:FCOB:FCSS DD:FCSS]lNAME EKraus, NMSS* JDavidson* RWarren* PTing* EWBrach*DATE 3/27/98 412/98 4/2/98 412/98 /8OFFICE _ZD/FCSS IMOB I PSGB T PECB l l(A)D:DRPMNAME EQTen Eyck KRamsey* VN Ao RSkelton JStokz JRDATE _4198 47198 Iyt 4117198 4/21/98 j98OFFICIAL RECORD COPY
-4.IN 98-XXApril XX, 1998 d00g
.2'CONCURRENCE PAGE FOR: NRC INFORMATION NOTICE 98-XX: FBI AWARENESS OF NATIONALSECURITY ISSUES AND RESPONSE (ANSIR) PROGRAMTo receive a copy of this document, Indicate In the box C=Copy w/o attachmentlenclosure E=Copy with attachment/enclosure N = No copyOFFICE Tech Editor FCOB:FCSSY I FCOB:FCSS C/FCOB:FCSS l cNAME EKraus,NMSS JJDavidso'n RWarren j PTing43DATE 3/27/98 Ji /498 k12I98 ci 1-98OFFICE DepI SS ll D/FCSS IMOBNAME EW/ch EQTen EyK KRamsey^ e IDATE g 1298 /[898 /98OFFICE C/PECB:DRPM D/DRPM .NAME SARichards JWRoeDATE I /98 I /98OFFICIAL RECORD COPY
|
---|
|
list | - Information Notice 1998-01, Thefts of Portable Gauges (15 January 1998, Topic: Shutdown Margin, Moisture Density Gauge, Stolen)
- Information Notice 1998-02, Nuclear Power Plant Cold Weather Problems and Protective Measures (21 January 1998)
- Information Notice 1998-03, Inadequate Verification of Overcurrent Trip Setpoints in Metal-Clad, Low-Voltage Circuit Breakers (21 January 1998)
- Information Notice 1998-04, 1997 Enforcement Sanctions for Deliberate Violations of NRC Employee Protection Requirements (9 February 1998)
- Information Notice 1998-05, Criminal History Record Information (11 February 1998)
- Information Notice 1998-06, Unauthorized Use of License to Obtain Radioactive Materials, and Its Implication Under the Expanded Title 18 of the U.S. Code (19 February 1998)
- Information Notice 1998-07, Offsite Power Reliability Challenges from Industry Deregulation (27 February 1998)
- Information Notice 1998-08, Information Likely to Be Requested If an Emergency is Declared (2 March 1998)
- Information Notice 1998-08, Information Likely to Be Requested If an Emergency Is Declared (2 March 1998)
- Information Notice 1998-09, Collapse of an Isocam II, Dual-Headed Nuclear Medicine Gamma Camera (5 March 1998)
- Information Notice 1998-10, Probable Misadministrations Occurring During Intravascular Brachytherapy with Novoste Beta-cath System (9 March 1998, Topic: Brachytherapy)
- Information Notice 1998-11, Cracking of Reactor Vessel Internal Baffle Former Bolts in Foreign Plants (25 March 1998, Topic: Fire Barrier, Brachytherapy)
- Information Notice 1998-12, Licensees' Responsibilities Regarding Reporting & Follow-up Requirements for Nuclear-Powered Pacemakers (3 April 1998, Topic: Fire Barrier, Brachytherapy, Stolen)
- Information Notice 1998-13, Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality (20 April 1998, Topic: Fire Barrier, VT-2, Pressure Boundary Leakage, Brachytherapy)
- Information Notice 1998-14, Undocumented Changes to Non-Power Reactor Safety System Wiring (20 April 1998, Topic: Brachytherapy)
- Information Notice 1998-15, Integrity of Operator Licensing Examinations (20 April 1998, Topic: Fire Barrier, Job Performance Measure)
- Information Notice 1998-16, Inadequate Operational Checks of Alarm Ratemeters (30 April 1998, Topic: Brachytherapy)
- Information Notice 1998-17, Federal Bureau of Investigation'S (FBI) Awareness of National Security Issues and Response (ANSIR) Program (7 May 1998)
- Information Notice 1998-17, Federal Bureau of Investigation'S (FBI) Awareness of National Security Issues and Response (Ansir) Program (7 May 1998, Topic: Brachytherapy)
- Information Notice 1998-18, Recent Contamination Incidences Resulting from Failure to Perform Adequate Surveys (13 May 1998, Topic: Brachytherapy)
- Information Notice 1998-19, Shaft Binding in General Electric Type Sbm Control Switches (3 June 1998)
- Information Notice 1998-20, Problems with Emergency Preparedness Respiratory Protection Programs (3 June 1998, Topic: Brachytherapy)
- Information Notice 1998-21, Potential Deficiency of Electrical Cable/Connection Systems (4 June 1998)
- Information Notice 1998-22, Deficiencies Identified During NRC Design Inspections (17 June 1998, Topic: Stroke time, Tornado Missile)
- Information Notice 1998-23, Crosby Relief Valve Setpoint Drift Problems Caused by Corrosion of Guide Ring (23 June 1998, Topic: Loop seal, Condition Adverse to Quality)
- Information Notice 1998-25, Loss of Inventory from Safety-Related Closed-Loop Cooling Water Systems (8 July 1998, Topic: Ultimate heat sink)
- Information Notice 1998-26, Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations (24 July 1998, Topic: Condition Adverse to Quality)
- Information Notice 1998-27, Steam Generator Tube End Cracking (24 July 1998)
- Information Notice 1998-28, Development of Systematic Sample Plan for Operator Licensing Examinations (31 July 1998)
- Information Notice 1998-29, Predicted Increase in Fuel Rod Cladding Oxidation (3 August 1998, Topic: Fuel cladding)
- Information Notice 1998-30, Effect of Year 2000 Computer Problem on NRC Licensees and Certificate Holders (12 August 1998, Topic: Brachytherapy)
- Information Notice 1998-31, Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2 (18 August 1998)
- Information Notice 1998-33, NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities (28 August 1998, Topic: Brachytherapy)
- Information Notice 1998-34, Configuration Control Errors (28 August 1998)
- Information Notice 1998-36, Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems (18 September 1998)
- Information Notice 1998-37, Eligibility of Operator License Applicants (1 October 1998)
- Information Notice 1998-38, Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections (15 October 1998, Topic: Overtravel)
- Information Notice 1998-39, Summary of Fitness-for-Duty Program Performance Reports for Calendar Years 1996 and 1997 (30 October 1998, Topic: Fitness for Duty)
- Information Notice 1998-40, Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents (26 October 1998)
- Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators From Design Oversight (20 November 1998)
- Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators from Design Oversight (20 November 1998)
- Information Notice 1998-42, Implementation of 10 CFR 55.55a(g) Inservice Inspection Requirements (1 December 1998)
- Information Notice 1998-43, Leaks in Emergency Diesel Generator Lubricating Oil & Jacket Cooling Water Piping (4 December 1998)
- Information Notice 1998-44, Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping (10 December 1998, Topic: Probabilistic Risk Assessment)
- Information Notice 1998-45, Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds (15 December 1998)
|
---|