IE Insp Repts 50-546/79-27 & 50-547/79-27 on 791203-21.No Noncompliance Noted.Major Areas Inspected:Auxiliary Bldg, Fuel Handling Bldg,Units 1 & 2 Containments & Miscellaneous Areas to Verify Compliance w/790807 Stop Work Order
ML19312D592
Person / Time
Site: Marble Hill
Issue date: 02/07/1980
From: Harrison J, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19312D590 List:
References
50-546-79-27, 50-547-79-27, NUDOCS 8003250043
Download: ML19312D592 (3)


Text

  • e-d

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Rtport Nos. 50-546/79-27;.50-547/79-27

' Docket Nos. 50-546; 50-547 License Nos. CPPR-170; CPPR-171 Licensce: Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble 11111 Generating Station, Units 1 and 2

,

Inspection At: Marble Hill Site, Jefferson' County IN Inspection Conducted: December 3-21, 1979 C, k.

'

Inspector:

J. J. Harrisonge-f-d_ 'b hO S. V iams,%Chie p-O

~

h, Approved By:

C. C.

i Projects Section 2

-Inspection Summary Inspection on December 3-21, 1979 (Report Nos. 50-546/79-27; 50-547/79-27)

Areas Inspected:

Inspection by the IE Regional Resident Inspector of the Auxiliary Building, Fuel Handling Building, Units 1 and 2 containments and

miscellaneous areas to verify that activities in progress complied with

,

the stop work order issued August 7, 1979. This inspection also included

'

a review of storage and maintena'nce activities' for safety-related items,

,

and the testin;; of equipment and unloading of the reactor vessel upper and lower internals. This inspection' involved a total of 136 inspector hours i

on site by one NRC. inspector.

Results: No items of noncompliance or deviations were identified.

\\

80032.50041

4 l

DETAILS e

Principal Persons Contacted Public Service of Indiana (PSI)

L.-Crews, Vice President Construction

  • G. Brown, Project Director
  • J. Brewer, Construction Manager
  • B. Turner, Quality Assurance-Manager E. Shows, Consultant (MAC)

D. Ashley, Project Engineering Manager T. Burns, Project Engineering Manager

  • R. Ubaudi, Project Controls Manager
  • M._ Morris, Project Control Manager M.'Linn, Reactor Building Mechanical Supervisor S..Farlow, Project Engineering Supervisor T. McCarty, Construction Inspection Supervisor D. Ingmire, Supt. Civil Quality Engineering G. Weston, Supt. Mechanical Quality Engineering D. Shuter, Civil Quality Engineer R. Hand, Supt. Electrical Quality Engineering J. Frost, Area Manager, Auxiliary Building R. Hayes, Reactor Building MechanicalEgineer R. Galloway, Operations Maintenance Superintendent Authorized Nuclear Inspector

,

B. Rice, Hartford Steam Boiler (ANI-PSI)'

Naclear Installation Services Company (NISCO)

R. Heade, Site Manager B. Larkin, Quality Assurance Manager

  • Denotes those present at the exit meetings, (MAC) Management Analysis Company. The inspector also contacted and interviewed other licensee and contractor personnel.

Functional or Program Areas Inspected 1.

Construction Activities Inspection of construction activities indicated that work in all Category I areas, i.e., safety-related work, remains terminated in accordance with NRC confirmatory order dated August 15, 1979, except for material receiving, storage, and maintenance. Four tours were made on the second shift to assure those activities were also being maintained in a stop work condition.

No' items of' noncompliance or deviations were identified.

-2-

-

.

,e 2.

Storage'and Ma'intenance of Material The inspector-observed the storage and maintenance of material on the basis of on-going daily activities and on the corrective action

,

that hed been_taken on the problems identified in Report Nos.

-50-546/79-25:and 50-547/79-25. This corrective action review was informal and was-requested by the liccasee.

It was observed that

'

much had been accomplished in areas of correctir g immediate storage and maintenance problems and an action plan was being developed to

-

correct systematic problems. Even though much bad been accomplished,

,.

a considerable' amount of. work remains to be accesplished.

No items of noncompliance or devistions were ideritified.

'

3.

Receiving' of Major Equipment

'During the reporting period, the reactor vessel upper and' lower internals were received on site, the_ required lifting equipment was tested,-and the internals were unloaded and placed in storage.

No items of nomeompliance or deviations were identified.

News Media Contacts

'During this reporting period, the inspector had the following media contacts:

.

1.

December'13, 1979 - Telephone interview with news reporter for TV Channel l3, Louisville, KY.

2.

December 20, 1979 - Live Film Report for TV Channels 6 and 13, Indianapolis, IN Exit Meetings The-resident inspector attended the exit meeting conducted by RIII-Inspector F. Hawkins on December 6, 1979 (NRC Inspection Report Nos.

50-546/79-26 and 50-547/79-26).

1The resident inspector met with licensee representatives denoted under Principal Persons Contacted periodically during this inspection. The

inspector summarized the. scope and findings of the inspections.

.