IR 05000546/1979005

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-546/79-05 & 50-547/79-05 on 790515.No Noncompliance Noted.Major Areas Inspected:Concrete Work Activities,Const Deficiency Reporting Requirements & Document Control
ML19274F304
Person / Time
Site: Marble Hill
Issue date: 05/29/1979
From: Fiorelli G, Hawkins F, Hayes D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19274F303 List:
References
50-546-79-05, 50-546-79-5, 50-547-79-05, 50-547-79-5, NUDOCS 7907240172
Download: ML19274F304 (5)


Text

.

.

U.S NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-546/79-05; 50-547/79-05 Docket No. 50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee:

Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2 Inspection At: Corporate Office, Plainfield, Indiana Inspection Conducted: May 15, 1979 Inspectors:

G. Fiore11i

,

6/25'/h

'

F. C. Hawkins1 7e

)

/

/

$

b

['

.f/z5}/y p. w. Hayes YETbh R. C.

  • E. 2

bMb E. R. Schweibinz O

f f

Approved By:

Gaston Fi Reactor Construction and

~

'/

Engineering Support Branch 19 072 40th'1

.

.

Inspection Summary

.

Inspection on May 15, 1979 (Report No. 50-546/79-05; 50-547/79-05)

Areas Inspected:

This was a special, announced, meeting to discuss previous inspection findings relative to the following topics: QC Inspection of concrete work activities; need for prompt and adequate corrective action; construction deficiency reporting requirements; communications between NRC and PSI; housekeeping; and document control.

This inspection involved a total of 15 inspector-hours at the PSI Corporate Office by five inspectors.

Results: No items of aoncompliance or deviations were identified.

-2-

.

.

DETAILS 1.

Attendees Public Service of Indiana (PSI)

H. A. Barker, President and Chief Executive Officer R. C. Pattyn, Senior Vice President and Assistant to the President S. W. Shields, Vice President - Electric System J. Coughlin, Vice President - Nuclear L. A. Crews, Vice President - Construction W. E. George, Jr., Vice President - Power G. L. Hofmockel, Vice President - Engineering F. R. Hodges, Quality Assurance Manager NRC G. Fiorelli, Chief, Reactor Construction and Engineering Support, Branch (RC&ESB)

R. C. Knop, Chief, Projects Section, (RC&ESB)

D. W. Hayes, Chief, Engineering Support Section No.

1, (RC&ESB)

F. C. Hawkins, Reactor Inspector, (RC&ESB)

E. R. Schweibinz, Reactor Inspector, (RC&ESB)

2.

Corporate Meeting The meeting was held to discuss previous inspection findings relative to the following topics.

a.

QC Inspection of Concrete Work Activities The inspectors discussed with licensee representatives the need for proper and complete implementation of the PSI and Newberg QC inspection program, as pertaining to concrete work activities.

Specific examples of concrete construc-tion activities which were not properly controlled or inspected were discussed in detail as follows:

(1) Concrete Pre-Placement Inspection (a) Reinforcing steel placement.

(b) Clean-up of the placement area.

-3-

-

.

%

(2) Concretd Post-Placement Inspection (a)

Identification, tagging, and repair of defective concrete (i.e., honeycomb).

(b) Concrete curing.

Based on these discuc:'ons, it was mutually agreed, that PSI would give additional attention to the site QC inspec-tion program to assure that it is effective and properly implemented to assure the quality of concrete work activities.

Secondly, the inspector expressed concern over Marble Hill Construction Management Manual Procedure 2.7, Section 4.2.3.

This procedure allows the concrete contractor to order concrete for placement prior to the required PSI Engineering and QC inspectors final release of the pour area. The inspectors concurred with licensee personnel,

.

that if the QC inspection program was operating properly, this practice would be acceptable.

But, in light of the observed QC inspection difficulties, the inspectors strongly recommended that PSI revise Procedure 2.7 to allow concrete to be ordered only after the PSI final release of the pour area. This revision will assure that no unnecessary production pressure is exerted on the responsible QC inspectors.

In addition, the licensee was requested to evaluate selected areas of in place Auxiliary Building concrete, to provide confidence that no internal voids or honeycomb are present in the completed structure. This request is based on the fact that the licensee is experiencing a higher than normal frequency and severity of honeycomb occurrence in the Auxiliary Building. Based on the results of this investigation the licensee can determine whether further investigation in other buildings is warranted.

b.

Need for Prompt and Adequate Corrective Action The inspectors discussed with the licensee management the apparent lack of trending of contractor identified deficien-cies by PSI QA/QC to assure prompt and effective corrective action.

It was recognized that the licensee is presently establishing a system to trend the contractor identified deficiencies. The apparent lack of timely responsiveness-4-t

.

.

.

by Newberg production personnel to requests made by QA/QC was also discussed.

c.

Construction Deficiency Reporting Requirements The recent item of noncompliance identified in Report No.

50-546/79-04 with regard to reportable deficiencies as defined by 10 CFR 50.55(e) was discussed. A copy of the NRC procedure for processing these itees was given to the licensee. The licensee appears to 'ue es::ing some improve-ment in this area and that message was communicated to them.

d.

Communications Between NRC and PSI The need for openness and candor between the licensee and the NRC was discussed including keeping inspectors informed in a timely manner of events within the inspection purview.

e.

Housekeeping The observed deterioration in the cleanliness of the work areas, especially in the lower areas of the Auxiliary Building and around the containments, was discussed. The licensee concurred that this was a problem and that they had already initiated corrective action.

f.

Document Control The recent item of noncompliance identified in Report No.

50-546/79-04 was discussed. This item was in regard to the lack of control of specifications and documents (other than drawings) in use by contractors at the site.