IE Insp Repts 50-546/79-13 & 50-547/79-13 on 790815-17.No Noncompliance Noted.Major Areas Inspected:Surveillance of Auxiliary Bldg,Unit 1 & Unit 2 Containments & Storage Areas
ML19209A875
Person / Time
Site: Marble Hill
Issue date: 08/24/1979
From: Hawkins F, Clint Jones, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19209A870 List:
References
50-546-79-13, 50-547-79-13, NUDOCS 7910050506
Download: ML19209A875 (3)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-546/79-13; 50-547/79-13 Do,cket No. 50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee:

Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble Hill Generating Station, Units 1 and 2 Inspection At: Marble Hill Site, Jefferson County, Indiana Inspection Conducted: August 15-17, 1979 E, k h m

.

,

.

Inspector:

E. Jones d

I~'

'

Y T

-

cu k

~

'

F. C.{Hawkins O 2 8,b i

,

,

( $ 0 );X f N n Approved By:

C. C. Williams, Chief 8/2b,/77 Projects Section 2

'

'

Inspection Summary Inspection on August 15-17, 1979 (Report No. 50-546/79-13; 50-547/79-13)

Areas Inspected:

Surveillance of the Auxiliary Building, Unit 1 and Unit 2 containments, storage areas and miscellaneous areas to verify that activities in progress complied with the stop work order issued August 7, 1979, by the licensee and confirmed by the NRC on August 15, 1979.

This inspection involved a total of 24 inspector-hours on site by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

1127 232 b

7910050

.

e DETAILS Persons Contacted Public Service of Indiana (PSI)

S. W. Shields, Vice President - Electrical System

  • R. M. Brown, Construction Project Superintendent Er. A. Crews, Vice President Construction M. Morris, QC Manager F. R. Hodges, QA Manager
  • T. L. McClarty, QA Construction Supervisor
  • S. K. Farlow, Const:uction Engineer W

G. Minick, QC Inspector T. J. Geyman, QC Inspector D. L. Sutter, QC Engineer, Civil Hartford Steam Boiler and Insurance Company W. C. Rice, AI for PSI W. Burden, AI for Cherne Contracting Corporation

  • Denotes those persons present for the exit meeting.

Functional or Program Areas Inspected 1.

Construction Activities Surveillance of construction activities indicated that work in all Category 1, i.e.,

safety related work, had been terminated except for the protection of installed or in place components.

Work in other portions of the plant such as the turbine building and cooling towers is continuing but at a reduced rate.

This work may eventually be further reduced as the construction becomes dependent on work halted by the stop work order.

2.

Concrete Patch Removal The licensee prepared a record sheet for recording results of the concrete patch removal.

The data sheet contained the following information; Patch No. and Location, Previous Patch Status and Verification of the test results by chipping. Verification signa-tures suggested were as follows:

PCA, PSI QA, S&L, Newbery QC, PSI Construction and space to indicate whether the NRC Inspector was present. A separate data sheet was suggested for each patch removed.

The final procedure for patch removal control will be reviewed and approved prior to use.

-2-1127 233

.

.

.

3.

Record Review Newberg Marble Hill Procedure WPN-35, Dry Patch Patching, Revision B, dated June 24, 1979, was reviewed together with the comments from PSI, QC Section. The response to the comments was noted; however, a(ditional study of the specifications is required prior to acceptance of the procedure for use in Dry Patching. Other procedures reviewed were WPN-9, QAPN-10, WPN-25 and WPN-33.

Prior review of these procedures by NRC inspectors indicated these procedures were acceptable.

_

4.

Review of Qualification and Training Records a.

N-MH QC Personnel The RIII inspector reviewed records of training classes given relative to the upgraded QC program requirements. On July 22, 1979, a class was given to five newly hired N-MH QC inspectors to indoctrinate them into the N-MH QA/QC organization.

N-MH procedures WPN-34, Rev. O and QAPN-10, Rev. 4 were discussel in detail during the session.

b.

N-MH Production Personnel Records for training classes conducted for 27 N-MH concrete production per:onnel on July 27, 1979 were reviewed. N-MH procedure WPN-4 Rev. 10, and ACI-309 were discussed as they apply to pre pticement preparation and concrete placement /

consolidation u chniques. On July 31, 1979, the attendees of the July 27 training class were given an exam to evaluate their understanding of the requirements. The test results showed that all personnel scored 80% or better. This training was accomplished as part of the upgraded program commitments in accordance with WPN-9, Rev. 10, Section 4.5.3.

Exit Meeting The inspector met with those persons (denoted in the Persons Contacted paragraph) at the conclusion of the inspection on August 17, 1979. The inspector summarized the scope and findir gs of the inspection.