U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-546/79-16; 50-547/79-16 Docket No. 50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee: Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble hill Nuclear Generating Station, Units 1 and 2 Inspection At: Marble Hill Site, Jefferson County, Indiana Inspection Conducted: July 25-27, 1979, by inspectors from the U. S. Army Engineer Waterways Experiment Station (WES)
Inspectors:
George C. Hoff, Chief, Materials Propertie. Branch Joe G. Tom, Civil Engineer Olen K. Loyd, Senior Technician William B. Lee, Senior Technician
Approved By:
D. W. Hayes, Chief 9 //7/'/ 9 Engineering Support Section 2
'/
Inspection Summary Inspection on July 25-27, 1979 (Report No. 50-546/79-16; 50-547/79-16)
Areas Inspected: Revire of U. S. Testing Laboratory and field testing procedures for quality control measures for the testing of concrete and concrete materials and reinforcing steel. Review of allegations concerning the concrete testing laboratory received through Congressman Deckard of Indiana on June 28, 1979.
Results: Nineteen items are identified in the report which are considered unresolved by WES. Either the inspection work could not be completed or descrepancies were identified in laboratory equipment or procedures.
Further review of these items is planned by the NRC Region III office and the results will be documenteJ in a subsequent report.
.
-
21s,'
.,m ('
7 9102 50D
.
.
Intr 6 cion This report is one of several reports docus..iting results of inspections performed at the Marble Hill construction site over the past several months by the NRC Office of Inspection ar.d Enforcement (IE) Region III and by the U. S. /.rmy Engineer Waterways Experiment Station culminating in the issuance of an Order Confirming Suspension of Construction on August 15, 1979.
On June 12, 1979, the NRC received information that a former worker at the Marble Hill site had alleged improper repairs of honeycomb areas in concrete. The allegations were contained in a sworn statement submitted to the Office of Nuclear Reactor Regulation (NRR) through an attorney representing an Indiana intervenor group.
Subsequently Region III IE received a copy and initiated an investigation on June 22, 1979. The results of this investigation are documented in Report No. 50-546/79-08.
Prior to receipt of the allegations during inspections conducted in April 3-6 and April 30-May 3, 1979, problems were identified relative to the placement and epair of concrete. A management meeting with PSI was held on May 15, 1919, to discuss these findings. The results of the inspections and the May 15, 1979, meeting are documented in Report hos.
50-546/79-03, 79-04 and 79-05.
On June 26, 1979, a second meeting was held with PSI officials to discuss the findings of the investigation at that point and the fact that deficient repairs of concrete had been identified. As a result of this meeting PSI agreed N stop concrete activities for safety related structures, perform non-destcuctive examinations of various concrete structures, identify and evaluate repaired areas for adequacy and review their entire program for concrete activities on site. An Immediate Action Letter (IAL) dated June 27, 1979, was issued confirming this agreement. A copy of this letter is attached to Report No. 50-546/79-07.
On June 27-29 and July 2-7, 1979, an inspection was conducted relative to items 1, 2, 3, 4 and 5 of the IAL. Based on the results of this inspection, documented in Report No. 50-546/79-07, IE: Region III concurred in the resumption of concrete placement for Safety Related Structures. The conditions for this concurrence are contained in a Region III letter to PSI dated July 13, 1979. A copy of the July 13 letter is attached to Report No. 50-546/79-07.
Report No. 50-546/79-09 documents results of an inspection conducted during the period July 9 through July 27, 1979.
Initial results of this inspection led to a site managemnt meeting on July 20, 1979, and an understanding that PSI would again stop concrete activities for Safety Related structures. A second IAL dated July 23, 1979, was issued documenting this understanding and a copy is attached to Report No. 50-546/7 -09.
Report No. 50-546/79-10 documents the results of an inspection conducted July 10-13, 1979, relative to the erection of safety related steel structures.
] '-) j 'i
' /, 7
"
_2-
.
.
On July 24, 1979, IE: Region III learned that a team from the National Board of Boiler and Pressure Vessel Inspectors had conducted an inspection on June 12-14, 1979, at the Marble 6111 site during which numerous items of noncompliance with the ASME Code were f e d.
As a result of the National Board's inspection and the IE: Region III findings a comprehen-sive team inspection was conducted during the period July 26-28 and July 31-August 3, 1979. The purpose of this inspection was to identify the underlying causes leading to the concrete and ASME code deficienc~ies and to determine if they were symptomatic of problems in other areas.
The results of this inspection, documented in Report No. 50-546/79-11, indicated tha' problems in the Quality Assurance / Quality Control (QA/QC)
program in coucrete construction activities extended to other construction areas as well.
At the request of PSI, representatives of Region III and PSI management met again on August 1, 1979, to discuss PSI's planned actions to correct the programmatic QA/QC problems at the Marble Hill site. The meeting included a discussion of the desirability of stopping all safety related construction activities at the Marble Hill site until such time as the licensee demosstrates that it has an effective QA program acceptable to the NRC. The licensee issued a stop work order on August 7, 1979, for all safety related cons +.ruction.
An order confirming this suspension of construction was issued en August 15, 1979, by the NRC. A Meeting was held with PSI management in the Region III offices on August 15, 1979, to discuss the conditions of the con; ming order. The meeting is documented in Report No. 50-546/79-14.
On June 28, 1979, NRC headquarters personnel met with Congressman Deckard of Indiana. During this meeting Congressman Deckard provided information concerning allegations he had received involving improper activities by the concrete testing laboratory at the Marble Hill construction site. As a result of this information the U. S. Army Engineer Waterways Experiment Station was requested to perform an independent inspection of the testing laboratory activities. The results of the Corps of Engineers inspection conducted July 25-27, 1979, are documented in Report No. 50-546/79-16.
Report No. 50-546/79-18 documents the results of NRC Region III followup inspection conducted August 13 and 14 and September 4-7, 1979, relative to the unresolved items identified by the Corps of Engineers in report No. 5?-546/79-16.
Report Nos. 50-546/79-06, 12, 13, 15 and 17 document results of routine or surveillance inspections conducted May 29-June 1, August 7-10, August 3-17, August 21-24 and August 27-31, 1979, respectively.
-
121.' X:
-3-
.
,
.
INSPECTION OF LABORATORY TESTING FACILITY AT THE MARBLE HILL NUCLEAR PLANT Under Interagency Agreement No. NRC 05-79-267, dated 19 July 1979, the US Army Engineer Waterways Experiment Station was retained to inspect the concrete testing 1sboratory of the US Testing Co. located at the Marble Hill Nuclear Plant and provide to the Nuclear Regulatory Commis-sion a report of the evaluation.
Attachment 2 of the above agreement details the items to be considered in the inspection.
This report con-tains the results of the inspection on an item by item basis.
Not all
.
items requested in Attachment 2 of the basic agreement could be considered either in their entirety or in part because of factors of time, weather, availability, and Waterways Experiment Station capability.
The inspection crew from the Struc tures Laboratory consisted of the following individuals.
George C. Hoff, Chief, Materials Properties Branch Joe G. Tom, Civil Engineer Olen K. Loyd, Senior Technician Willard B. Lee, Senior Technician The inspection took place at Marble Hill Nuclear Site on 25, 26, and 27 July 1979.
The following aih eviations are used throughout the report.
WES - Waterways Experiment Station NRC - Nuclear Regulatory Commission UST - United States Testing Company, Inc.
PSI - Public Service Indiana N-MH - Newberg - Marble Hill S&L - Sargent and Lu ly This report includes certain items that will be reviewed further by the Nuclear Regulatory Commission, Office of Inspection and Enforcement (IE)
Region III. The results of those reviews will be documented in a subse-quent IE Inspection Report.
121 '
Z 3 z
.
h!
eld /
.
..
.
.
INSPECTION ITEMS A.
Procedure Review This is a general requirement to review all laboratory and field testing procedures to assure appropriate quality control measures have been incorporated for the testing of concre_te, concrete materials and reinforcing steel. The specific details of review are contained in the following sections.
B.
Materials (1) Cement. All cement is sampled at the project site by the UST Batch Plant Inspector,at a prescribed frequency of one sample per 1200
tons.
The sample is identified and sent to the UST laboratory in Hoboken, New Jersey, for testing. A Log of all cement shipments is kept
,
by the Batch Plant Inspector. The Log includes date, ticket number, weight, accumulative weight in pounds, and. accumulative weight in tons.
A portion of the cement log was examined by the WES inspectors.
A re-view of 31 test reports from the Hoboken Laboratory covering the period from 21 December 1977 to 5 July 1979 indicated only one instance of a failure of a sample of cement to comply alth the requirements of the specification. Cement sample No. 2 taken on 6 March 1978 exceeded the total alkalies permitted by the specification.
It contained 0.70 percent total alkalies, whereas ASTM-C 150-73a permits a maximum of 0.60 percent The test report did not indicate what action beyond notification was taken by PSI. 'WES understands that the NRC plans further review of this item (546/79-16-01; 547/79-16-01).
One period of missed sampling frequencies of cement did occur in August and September 1978 and is described in Section I(10).
(2) Fly Ash.
All fly ash is sampled at the project site by the UST Baten Plant Inspector at a prescribed frequency of one sample per 200 tons. The sample is identified and sent to the UST laboratory in Hoboken,
-
New Jersey, for testing. A Log of all fly ash shipments received is kept I
by the Batch Plant Inspector. The Log includes date, ticket number,
.
truck number, trailer number, weight in pounds, accumulative weight in pounds, and the fly ash sample number.
A portion of the Fly Ash Log was 1 2 1 J
.^_ ' ;
.
-
.
.
.
examined by the WES inspectors. A review of 41 test reports from the Hoboken Laboratory covering the period from 19 December 1977 to 29 June 1979 indicated three instances of fly ash test failures. All three concerned the fineness of the fly ash and occurred in consecutive samples in May and June of 1978. The three fly ash test reports gave no indication of what action was taken to disposition the nonconforming fly ash. WES understands that the NRC plans further review of this item (546/79-16-02; 547/79-16-02).
One period of missed sampling frequencies of fly ash did occur in August and September 1978 and is described in Section 1(10).
(3) Aggregates (fine and coarse).
It was impossible to check all
-
the grading test records for the job because of the large number of tests run.
Job requirements call for a daily check of grading of both fine and coarse aggregate and a grading for each incoming shipment. As a spot check, the month of June 1979 was examined.
A total of 25 deter-minations each for grading of both fine and coarse aggregate
're made.
All were satisfactory except for Daily Coarse Aggregate Sample No. 292-158 which on 7 June 1979 did not meet the percent passing requirement on the 1/2-in. size. The report of the results indicates that PSI was notified of the failure on 8 June 1979 but gives no other informa*. ion concerning dicposition of the nonconforming material. WES understands that the NRC plans further review of this item (546/79-16-03; 547/79-16-03). Moisture content is required by Specification Y-2850 to be determined twice daily; unit weight, weekly; and s; ecific gravity and absorption, monthly, during concrete production.. UST personnel stated that they met these frequencies.
UST has no responsibility for the maintenance of aggregate stockpiles.
(4) Water. All water analysis is performed at the UST laboratory in Hoboken, New Jersay.
Fe. a review of the water testing, see Section 1(1).
(5) Reinforcing S eel.
Reinforcing steel is identified for testing by N-MH personnel.
This identification is carried over onto UST records when the samples are tested.
The job specifications require testing of at least one tension specimen from each bar size for tsch 50 tons or fraction thera:i of the reinforcing i21? ^'7
-
.
e
.
.
.
.
At least one bend test is required bars that are produced from each heat.
for each bar size rolled from each heat. During a review of test reports, some reinforcing steci :ension and bend test failures were noted and are described in Section I(13).
C.
Laboratory Equipment i
See Appendix
.
D.
Qualification of Lab Personnel for the evaluation of laboratory technicians with re-See Appendix ga;i to the manner in which testing is conducted.
E.
Observe Field Testing No concreting operations were accomplished during the WES inspection at Marble Hill.
F.
Concrete Mix Design Qualifications The basic mixtures that were given to WES were found to be propor-tioned according to ACI 211-74, Recommended Practice for Selecting Pro-portions for Normal and Heavyweight Concrete. This includes aggregates, admixturca, cement, batch quantitles, air content, and yield. The water-cement ratios for the 3500 and 5500 psi mix designs (air entrained) were generally higher than specified by ACI 211. However, a review of com-pressive test results indicated that adequate compressive strength was being obtained.
G.
Review of Concrete Strength Results Upon the completion of the testing of concrete cylinders for compres-sive strength, personnel from UST transpose the information from labora-tory and field concrete reports to Sargent and Lundy computer forus SC-1 One copy of the UST Concrete Reports and SC-1 and SC-2 are and SC-2.
then sent to Sargent and Lundy via PSI mail service. Sargent and Lundy then performs all statistical analysis of the data through the use of conputer programs.
Sargent and Lundy Specification Y-2722, page 4-5, Section 409.2,
" Mix Design," requires three different concrete strengths:
a
"c3.1 2000 psi at 28 days, c3.2 3500 psi at 91 days and c3.3 5500 psi at 91 days" f2f
'$
,
.
In discussion with Mr. Arthur Weiss, Concrete Technologist for Sargent and Lundy, he noted that the 2000-psi strength requirement was for " mud mats" and was inserted in the specification only as a point of reference, as strength was not critical for these elements.
Sargent and Lundy used the quality control procedures described in ACI 214-65, Recommended Practice for Evaluation of Compression Test Re-sults of Field Concrete, 1965.
A 1977 updated version of this document is now available; however, it incorporates all the features of the 1965 was used by Sargent and Lundy.
The data from the 3500-version whi25 and 5500-psi concrete test cylinders appear in computer printout reports entitled Statistic =t Analysis and Evaluation of Field Concrete by Com-
.
puter Program for Public Service Indiana Marble Hill-Units 1 and 2. Proj-ect No. 4808-15. These printouts also include all statistical data and computerized control charts for the data.
Eleven of these reports numbered MHCON-1 to MCHCON-11 covering a time period of 6 July 1978 to 9 May 1979 were reviewed.
Section 413.9 of S&L Specification Y-2722 includes the criteria for evaluation and acceptance of concrete compression test results.
A review of the MHCON report series indicates that the concrete strengths exceed the strength criteria of the job. The average etrength of all of the 492 test samples (two cylinders per sample) of the 3500-psi mixture evaluated at 21 days exceeded the specified strength for the job with an overall average on the job of 6020 psi.
The average strength of 415 of the 418 test samples (two cylinders per sample) of the 5500-psi mix-ture evaluated at 91 days exceeded the specified strength for the job with an overall average on the job of 7006 psi. All of the samples falling below the specified strength were statistically acceptable.
The individual test reports for the 2000-psi mixtures over the period 28 February 1978 to 11 May 1979 were reviewed and none of the 196 test cylinders tested had strengths less than the specified strength.
A spot check on the statistical calculations on the MHCON report
series indicated that they were properly done.
The MHCON reports indicate that the proper number of; cylinders were being tested at 91-days age.
Lj
]2]/
' /, o
'
e
.
.
_
.
.
H.
Jon-Conformance or Deviation Reports Two types of non-conformance or deviation reports were made available for inspection. These were UST Internal Corrective Action Requests (ICAR)
and PSI Field Corrective Action Requests (FCAR).
(1) Internal Corrective Action Request (ICAR). PQAM-1036, Rev 1, pages 17.1 and 17.2, paragraph 17.0, Corrective Action, requires that
"17.2 In the case of significant conditions adverse to quality, the cause of the condition shall be determined and correct'.ve action taken to preclude repetition.
All actions in the '.dentifi-cation, cause, and correction of these conditions shall be documented, resolved, and reported as specified in.the 7.nternal Corrective Action procedure (UST-CA-1).
17.2.1
"Significant" is defined as having direct impact
'
on the acceptability of materials tested or items ir.spected."
It also requires that
"17.3 The PSI QA Construction Supervisor shall be advised of significant conditions adverse o quality by issuing him in-formation copies of Internal Corrective Action Requests."
Th. procedure that is folleved i.s that whenever any US Testing staff member detects a deficiency on work performed by or for UST, they report this deficiency by initiating an ICAR Form No. USTF-CA-1.1.
The Site Project Supervisor reviews the ICAR and determines if it is valid.
If the ICAR is determined not to be valid, the Site Project Supervisor attaches his reasons for that decision to the original docu-ment, and submits it to his next higher level of management in the UST Hoboken office for concurrence.
Where a deficiency is considered valid, the Site Project Supervisor determines the corrective action necessary to correct the specific deficiency cited and to prevent recurrence. He also determines if the corrective action due date is appropriate.
He then forwards a copy cf the ICAR to the next highest level of management in the UST Hoboken
'
office.
The Site Project Supervisor is required to close out c11 ICAR's and sign off on them when he does.
PSI maintains a log of all ICAR's.
Forty-seven ICAR's were received by PSI. The first recorded entry was in October 1977,
~
,
-7, 1nj4 l *:
/J
,
4
.
.
The ICAR's are very brief and to the point.
For purposes of expe-diency they can be grouped into the following eight categories:
No. of Related
Category of Problem Typical Example ICAR 's Administration Improperly processed R & I report on SW.
Calibration Pocket thermometer out of calibration.
Test Frequency Missed frequency tests on concrete.
Test Omission Grout cubes not made.
Improper Test Cold bend tests improperly made.
Error in reporting Tolerance incorrectly recorded.
Faulty equip =ent Curing room had insufficient moisture.
.
Non-corgliance to Incorrect specification limit on C 123.
_j[
specification
The " Typical Example" above is by title entered into the ICAR log.
Other related ICAR's have different titles and may not be related to the example shown in any way with regard to content.
None of the ICAR's appeared to be out of the ordinary from what might be expected on the startup of any large multi-year construction project.
The fact that UST was required not only to correct the problem but to insure that it did not become a repetitive problem was reficcted in the absence of any identical, recurring problem or theme in the ICAR's already submitted.
(2) Field Corrective Action Request (FCAR). PSI personnel, when they become aware of any problems associated with the duties, responsi-bilities, or performance of USL will give oral notification of the problem to UST and attempt to resolve the matter.. Depending on the severity or frequency or b'oth of the problem an FCAR may also be issued.
The FCAR is a. written request to correct the problem. These FCAR's are recorded in the Field Corrective Action Request Status Log. The first was issued to UST in April 1977. A total of twenty-eight (28) FCAR's J have been issued through July 1979.
PSI personnel advised WES.that problem areas are identified by the PGI inspectors through surveillance inspections of UST.
121/
27i
..
.
.
.
The twenty-eight (28) FCAR's can be generally categorized as follows:
No. of Related Category FCAR's of Problem Typical Example Administration Noncompliance tJ PQAM 1036, para 7.4,
page 7.2.
Copies o'f test reports not sent to N-MH.
Qualification Question on qualification of technicians.
Improper Test Improper curing of concrete cylinders, 507, should have been 73 + 3.
Non-compliance to Non-compliance to Al for spec control.
specificar. ions Improper completion of unit weight of sand 11, Improper Test
reports test report.
The " Typical Example" above is by title entered into the Field Corrective Action Request Status Log.
Other related FCAR's have different titles and may not be directly related to the example shown.
Nine of the eleven FCAR's related to improper test reports occurring between 29 November 1978 and 13 February 1979.
UST hired a document control clerk to resolve.the reporting problems and no fttrther FCAR's have been issued in that area. As in the case of the ICAR's, the problem areas do not appear to be out of the ordinary and al?. were re-solved to the satisfaction of PSI.
I.
Specific Allegations The specific allegations were an enclosure to a memorandum dated 5 July 1979 from Mr. H. D. Thornburg, Director, Division of Reactor Con-struction Inspection, NRC, to Mr. J. G. Keppler, Director, Region III, NRC, subject, Metting With Congressman Deckard and were transmitted to Mr. Hoff, WES, on the morning of 25 July 1979 by an NRC representative at Marble Hill. Attempts to look into these allegations are reported in the following paragraphs.
(1) Allegation No. 1
"There may have been an irregularity in the approved
-
water supply for concreting.
Check into water supply used for concreting."
}2l/
^7]
.
...
.
.
.
Finding:
Sargent and Lundy Specification Y-2722: Amd 3, dated 29 March 1979, pages 4-14a and 4.15, paragraph 508, WATER, requires the following:
"408.1 Mixing water and ice shall conform to the requirements specified in CC-2223 of ASME Boiler and Pressure Vessel Code, Section Ill, Division 2, except that total solids content and limits on chloride ions indicated in CC-2223.1 shall not apply.
Maximum content of chloride ions in the mixing water shall not exceed 500 ppm.
408.2 Testing:
Initial Testing: Initial tests-preliminary to mix design, a.
will be performed by' Purchaser to insure compliance with the requirements specified in Parag.aph 408.1.
b.
Control Testing: The following tests, as specified in Specification Y-2850, will be performed by an independent testing laboratory to ascertain conformance, with the requirements specified in Paragraph 408.1:
.
bl.
ASTM C 109, C 191, C 151, D 512 and D 1888 - every six months.
The following United States Testing Company Reports were reviewed:
UST Reference Report Material Date Date Number Date Evaluated Sampled Tested 1) No. not 21 Jul 77 water from the Ohio 21 Jun 77 6-7 Jul 77 River at Plant Site given (2 reports)
2) 56421, 17 Jan 78 Water from New 11 Nov 77 21 Dec 77 thru 56423 Washington Public 13 Jan 78 Water Supply 3) 56430 22 Feb 78 Water from New 11 Nov 77 21 Dec 77 thru Washington Public 13 Jan 78 Water Supply 4) 56,198, 5 Jul 78, Batch water, 6 Jun 78 22-23 Jun 78 56,199 18 Jul 78 Sample No. 3 (amend.)
Jobsite Well 5) 56,195 20 Jun 78 Ice from Artic 29 Jun 78 6 Jul 78 thru Ice Co.
18 Jul 78
,
5) 56,776, 28 Nov 78 Water, Site Well 3 Oct 78 30 Oct 78 thru
-
56,777 and Ice, Polar 27 Nov 78
,
- 7 _,
3,,l'
!J IL
.
.
.
UST Reference Report Material Date Date Number Date Evaluated Sampled Tested 7) 57,494, 25 Apr 79 Water, Site Well 7 Mar 79 Not given 57,495 8) 57,542, 7 Jan 79 Ice Water, Sample 2 May 79 9 May 79 thru
,
57,543 No. 4, Artic Ice Co.
7 Jun 79 Three different water sources were evaluated for use on the job; Ohio River, New Washington Public Water Supply, and an on-site well, which is presently being used.
All,f the data included in the test reports noted above indicated that all of the water and ice tested from all sources met the require-
.
ments of the job. The UST limits specified on water for chemical analysis test reports differ from those specified by S&L specification Y-2722.
The UST test reports specify 250 ppm (max) for chlorides, whereas S&L Specification Y-2722 allows 500 ppm.
All samples meet the lower limit.
The total solids content requirement is deleted in S&L Specification Y-2722 but appears on some test reports as 2000 ppm, maximum.
All samples also met this limit. Both ice and yater samples were evaluated at 6-month intervels from the time of their initial testing. This also conforms to the job requirements.
If a problem existed with the water supply, it is not apparent from the test reports.
'
(2) Allegation No. 2
"Apparently US Testing used temporary facilities at some time for concrete testing. A trailer may have been used and humidity and temperature control may not have been properly controlled."
Findings UST did operate out of both an old house and a mobile trailer
.
through July 1978.
Field Corrective Action Request's (FCAR's) issued by PSI in November and December 1977 indicate that problems of temperature and humidity control did exist at that time and were corrected.
121.'
'70
,,
.
.
.
(3) Allegation No. 3
"US Testing's limit of authority for stopping the job in They may have attempted the event of nonconformance was raised.
to stop work at some point and been thwarted."
Finding:
PQAM-1036, Rev 1, Page 1.1, para 1.1 states that:
" United States Testing is contracted to provide civil material inspection and testing service.
The results of inspection and tests are submitted to those who are responsible for accepting or rejecting the materials inspected or tested."
UST has nct authority for stopping the job in the event of a noncon-If nonconformance is discovered by UST through in process in-formance.
Nonconformance
-
spection, UST notifies P31 who decides what needs to be done.
form
, observed in testing is documented on the appropriate t'est report and sent to PSI for action.
(4) Allegation No. 4
"The qualifications of US Testing personnel was questioned."
Finding:
The following test procedures were discussed with all laboratory Each individual personnel involved in the execution of the procedures.
appeared to be knowledgeable in his respective field of responsibility.
ASTM C 172-71.
Sampling Fresh Concrete.
a.
b.
Slump Test. C-143-71.
c.
Unit Veight. C 138-74.
C 31-69.
d.
Making Concrete Test Specimens.
Air Content Pressure. C 231-73.
c.
f.
Sampling. D 75-71.
C 117-69.
Material Finer than No. 200 Sieve.
g.
h.
(1) Coarse Aggregate. C 127-73.
(2) Fine Aggregate.
C 128-73.
C 87-69.
Effect of Organic Impurities on Strength.
i.
C 702-71 T.
j.,, Reduction of Samples.
CRD-C 119-53.
k.
Flat and Elongated Particles.
C 123-69/C 33-74.
1.
Lightweight Pieces.
Scratch Hardness. C 235-68.
Particles C 142-71.
m.
Clay Lumps and Friable Particles.
n.
=
.
.
L,
)91, m7-
'
iLI*
/ _,
,
.
e
.
.
WES did not review the training and qualification records for UST person-WES nel to determine their acceptability with respect to ANSI N45.2.6.
understands that the NRC plans further review of this item (546/79-16-14 ;
547/79-16-14).
(5) Allegation No. 5
"A point was made that US Testing was never made aware of where concrete cylinders had been taken from.
Traceability of concrete samples should be checked and it should be ascertained if all samples were tested according to the proper procedures."
Finding:
PQAM-1036, Revision 1, page 9.1, paragraph 9.1 states that:
" Test samples taken by United States Testing personnel shall be adequately identified at the time of sample selection to as-sure traceability to the material f rom whic'h they were taken.
This identification shall be maintained and transferred as re-quired during the handling, storage, and testing of the samples to assure that this traceability is retained. When samples are removed from their marked containers, o.r markings are destroyed during the testing cycle, the identification shall be transferred to records."
Also in QCP-3, Rev 1, page 2, Quality Control Procedures for Sampling /
Testing Concrete,Section III, Responsibilities, paragraph 4.0, Field Technician Level I, it states:
"4.1 Sample, log, test, and prepare concrete, bash (backfill material consisting of cement, fly ash, stone,.and water), and grouts specimens fr - the fresh concrete and grout as outlined in this procedure."
These technicians are furnished by UST.
The UST Site Project Supervisor stated that all concrete cylinders are made by UST personnel at. the point of placement as described in S&L Y-2722. The cylinders are consecutively numbered from the first day These numbers correspond to batch ticket numbers which of placement.
pinpoint the point of placement of the concrete.
An examination of forms completed by field inspectors in eight differ-ent months over the period of August 1978 to Iby 1979 indicate that ade-
The UST form quate identification and traceability is being maintained.
entitled Report of Concrete Cylinders includes the following specific information pertaining to the placement:
3 3 3 37-
!
i*
/ J u
.
.... -
.
,
a.
Placement location.
b.
Date placed.
c.
Which batch plant used.
d.
Mixture designation.
e.
Batch ticket number.
f.
Truck number.
Time of molding at number of cubic yards placed.
g.
h.
Name of inspector.
i.
Specimen identification number.
As UST personnel are responsibic for making and ?dentifying all con-crete cylinders, they are knowledgeable of the point of placement of the The UST Site Project Supervisor indicated that great care is concrete.
taken to prevent the loss of concrete cylinder identification markings.
.
During this inspection, WES observed no instances of lost concrete cylinder identification markings.
With regard to the use of proper procedures for the testing of con-crete cylinders, one instance of improper loading rate during compressive strength testing was noted.
See the section of this report on laboratory inspection (ASTM C 39) for further details. WES understands that the NRC plans further review of this item (545/79-16-04; 547/79-16-04).
(6) Allegation No. 6
" Reportedly PSI '. d been made aware of concreting prob-lems in writing and had ignored the notification."
Findings:
The UST Site Project Supervisor stated that when his organization became aware of a concreting problem either through testing or obse.rvation, PSI was informed.
There was no follow-up by UST on any of their notifi-cations as it is not their responsibility nor did they have the authority to take any action on matters of that sort. A PSI representative stated that PSI looks into all notifications of concrete problems and takes corrective action when warranted. UES addressed only the UST notification of PSI concerning concreting problems.
WES understands that the NRC
_ plans further review of this item (546/79-16-15; 547/79-16-15).
.
b
_
.
-
.
e
.
.
(7) Allegation No. 7
"Apparently PSI inspectors were supposed to witness all pours completely and they have not."
Findings:
The NRC representative instructed WES not to address this specific allegation as it does not apply to the UST program, but WES understands that the NRC plans further review of this item (546/79-16-16; 547/79-16-16).
(8) Allegation No. 8
" PSI and/or US Testing inspectors may not have been familiar with the PSI Q/A manual."
,
This is a subjective matter as the degree of familiarity depends on the need-to-know and this varies with the level of the inspector.
The UST Site Project Supervisor stated that all his inspectors are adequately familiar with the manual.
The PSI QA Manual is kept in both the UST control office and. laboratory where it is available to all in-spectors.
Specific questions involving the Q/A manual were asked of a PSI QC During this interview, he exhibited sufficient knowledge of inspector.
the QA manual and its requirements.
(9) Allegation No. 9
"Apparently 365 cu yd of concrete were improperly tested, This i.e., an insuf ficient number of test cylinders were taken.
may be the subject of a Deviation Report."
Finding:
Sargent and Lundy 2pecification Y-2722, Amd. 3, dated 29 March 1979, page 4-24, paragraph 413.6, Control Tests, states:
"a.
Control testing will be performed by an Independent Testing Laboratory in accordance with Specification Y-2850.
b.
Concrete testing and sampling frequencies will conform to Tables 4-1-5 and 4-1-6.
Allowable limits will conform to Tables 4-1-2, 4-1-3, and 4-1-4."
,-
PQAM-1036 Supplementing Procedure QCP-3, Rev.1, page 5, paragraph 2.1.1 states:
) 2 }.' [7)
.
.
..
.
" Compression test specimens shall be molded in accordance with ASTM C 31-69 from normal samples of each type concrete placed during a day's placement as per Sargent & Lundy Specification 7-2850, Table 4.2."
Table 4-1-5 of Y-2722 and Table 4.2 of Y-2850 contain the same informa-tion with regard to the amount and frequency of test cylinders to be made.
The exact placement alleged to be improperly sampled could not be established.
(10) Allegation No. 10
.
"Apparently tSere is some irregularity with the Fly Ash Log."
Finding:
.
Sargent & Lundy Specification Y-2722, Amd. 3, dated 29 March 1979, page 4-10, paragraph 404.1.b states:
" Control Testing:
Control testing will be performed by an independent testing laboratory in accordance with Specification Y-2850, to ascertain conformance with ASTM C 618 for the following ASTM test, based on a frequency of every 200 tons."
'
The Fly Ash Log is n continual record of fly ash received on the job.
The original is kept by the Batch Plant Inspector for UST.
The UST office has a copy. With each 200 tons of fly ash received, a sample is to be taken and sent to the UST laboratory in Hoboken, New Jersey.
Between 29 August 1978 and 29 September 1978, four control test frequencies were missed on incoming fly ash.
This is reported on ICAR No. 1036-25.0.
As a result of this ICAR, a new batch plant inspector was assigned.
A Fly Ash Log was also incorporated into PQAM-1036 Supplemental Procedure QCP-1, Batch Plant Inspection.
Included in UST files is a ccpy of a letter to the former batch plant plant inspector dated 17 November 1978 which terminates his employment.
The letter notes that the inspector was in possession of two controlled documents, the cement log and fly ash log, and that he would not return them. This refusal plus his neglect in sampling were cited as the reasons for his dismissal.
Also included in the files is a copy of a letter dated 28 November 1978
.
from AMAX Resource Recovery Systems, Inc., the fly ash supplier.
The 121'
^77
.
s
.
.
letter acknowledges shipment to UST (Hoboken, New Jersey) of a portion of the samples taken by AMAX at the mill.
These samples represented the four fly ash shipments made to N-MH but not sampled during the period noted above.
UST test reports for these belated samples indicate that all were satisfactory and the S&L letter of 25 July 1979 satisfactorily -dispositioned the fly ash material based on these test results.
Also included in the above mentioned ICAR were four control test fre-quencies that were missed on int.oming shipments o.f cement.
These missed frequencies occurred between 1 August 1978 and 22 September 1978.
The S&L Ictter dated 25 July 1979 satisfactorily dispositioned the use of the cement based on a review of the original Certified Material Test Reports (CMTR)
-
and associated concrete compressive strength test results.
(11) Allegation No. 11
"Apparently aggregate has been improperly stored:
sand was not kept damp and shape of aggregate piles indicated segregation of ag-gcegate."
Findings:
Sargent and Lundy Specification Y-2722, Amd. 1, 21 August 1978, page 4-38, paragraph 425.3, St'oring and Handling Material, states:
"a.
Adequate precautions shall be taken in storing and handling concrete material to prevent (1) segregation of aggregates, (2) intermixing of the separate' sizes of aggregate prior to batching, (3) contamination of material by dirt or other foreign substances, (4) damage to cemen*_ by dampness or weather, (5) reteation of free surf ace water in the aggre-gates, and (6) excessive chipping and breaking of coarse aggregate which might produce undersize cccumulations. At the time of batching, all aggregate shall be dried or drainec' to obtain a stable moisture content that is not less than saturate 3 surface dry nor shall the moisture con-tent of fine aggregate exceed saturated surface-dry condi-tion by more than 8 percent. Ground storage of concrete aggregates will be allowed."
-
The responsibility for constructing and maintaining the aggregate storage piles belongs to N-MH.
7.t is difficult to ascertain at this point in time whether previous stockpiles were improperly constructed,
-
thus producing segregation. The daily grading tests may be able to pick up problems in segregation if separate samples taken from various 121J 20]
_.
.
,
.
locations in the stockpile each had a grading determined for it.
Present methods of sampling, while acceptable, do not pick up variations through-out the pile because only one test is run. A review of grading test re-sults revealed no recurring grading failures.
Regarding the moisture content of the sand stockpiles, WES experience has shown that in general it is very difficult for any part of a sand stockpile other than the exposed surface to dry out if the pile is sub-jected to occasional rains such as occur in areas such as F arble Hill.
(12) Allegation No. 12
"There may have been a problem with the correction factor for
aggregate size in arriving at the proper air entrainment value."
Findings:
Sargent and Lundy Specification Y-2722, Amd. 1, 21 August 1978, page 4-5, paragraph c2.2, sectes:
" Air content shall be measured by ' Test for Air Content of Freshly Mixed Concrete by the Pressure Method' (ASTM C 231)."
ASTM C 231-73,. paragraph 4, Determination of Aggregate Correction Factor, contains a co= ment which states:
" Note 5 - The aggregate correction factor will vary with different aggregates.
It can be determined only by test, since apparently it is not directly related to the absorption of the particles. The test can be easily made and rust not be ignored.
Ordinarily the factor will remain reasonably constant for given aggregates, but an occasional check test is recommended."
For the work done to date, UST personnel stated that the aggregate
.
correction factor has not varied.
If the aggregate size, type, and source has remained constant, the correction factor, according to ASTM C 231, should not be changing.
If a problem did exist for the correction f actor, WES was unable to define it with the information given in the allegation.
-
_
(13) Allegation No. 13
"There may have been a problem with rebar tensile strength."
.
S 121.' '8:
-
.
...
.
.
..
.
.
Finding:
Sargent and Lundy Specification Y-2722, Amd. 3, 29 March 1979, page 4.15, paragraph 409.lal, states:
" Reinforcing bars for all Category I structures shall be Grade 60 deformed bars meeting the requirements of ASTM A 6.15.72 with the following modification.
Paragraphs 4.2, 7.3, 8.3, and all of Sections 9 and 10 as indicated below shall be used in lieu of the same parts as specified in A 615-72; (Annual Book of ASTM Standards, Part 4, April 1974)."
PQAM-1036, QCP-11, Rev. 1, Div. II, page 17-18, paragraphs 3.0 and 4.0,
~
further details the requirements.
As of 25' June 1979, a total of 1357 bars were tested. A random sampling of ten (10) test reports over the period of 4 August 1978 to 25 July 1979 was made. These reports included the results of 93 bar tests of which 21 failed. UST personnel stated that 309 of the 1357 total rebar tests were failures.
In the reports examined, the principal failures were in yield strength and bending, being divided about equally.
When failures occur, PSI is notified to assure proper follow-up in ac-cordance with Specification Y-2722.
(14) Allegation No. 14
"Apparently there have been a large number of nonconformances reported in connection with Category 1 columns."
Findings Only one nonconforming report could be located that specifically addressed a Category I concrete placement. This was documented as ICAR No. 1036-32, dated 19 December 1978, subject: Omission of unit weight test for a category one pour #2TW-356-2. According to the ICAR on 15 December 1975, pour number 2TW-356-2 was placed as a Category I pour, however, no unit weight was run.
That was the only pour of the day that was using 3504 " mix design." The written placement notification information received by UST from N-MH listed 2TW-356-2 as a Category II
-
pour.
UST treated the placement as a Category II placement and did not
-
make the unit weight check normally associated with Category I placements.
~
Actions were taken to prevent this type of communication problem from occurring again.
121? ^0:
1,
.
-
.
.
WES addressed only UST nonconformances (ICAR). WES understands that the NRC plans further review of thin item (546/79-16-17; 546/79-16-17).
(15) Allegation No. 15
"Apparently there has been some problem with cement / water ratio in Class I concrete."
Findings:
Sargent and Lundy Specification Y-2722, Amd. 1, 21 August 1978, page 4.7, paragraph 402.2, Mix Design, statar:
"e4.
Field control shall be based on adju'
ent of the water-cement ratio to maintain the required compressive strength average, maintenance of slump and air content, and adjustment to
temperature of plastic concrete."
Futhermore in paragraph 413.1, page 4-20b:
"...If additioral slump is required, cement and water may be added provided the taximum allowsble water / cement ratio is not exceeded..."
And finally, on page 4-25, in paragraph 413.7, it is noted that:
" Addition of Water to Mixture: Water may be added to bring slump within specified limits only if all the following require-ments are met:
Maximum amount of water to be added, as determined by a.
the water-cenent ratio of the design mixture, is established by operating personnel of the central mixing plant.
b.
...
d...
.
e.
...
f.... "
The allegation is not well defined and it is difficult to pinpoint the exact problem. The above specifications are stated to show that a lot of flexibility is allowed in the specification for the adjustment of water in the mixture. These adjustments change the water-cement ratio.
ll 1 2 1.'
^ 3 3 l.3
-
.
--
.
.
The water adjustments may appear to be a problem area to the casual ob-I server, but can be within limits in the specifications.
Respect u ly submitted,-
/
I GEORGE C. HOFF, Chief Materials Properties Branch Structures Laboratory
)2}'
..., ',
~O
.
e
.
.
SU>t1ARY OF INSPECTIO5 Ap pa r a t_u_s Inspection Iten Stat;us A.
Concrete Inspection Equipment 1.
Concrete Mixing Machine (s)
sn e i n f n c t ory 2.
Tamping Rod (s)
Satisfactory 3.
Slump Cone (s)
Satisfactory
.
4.
Unit Weight Apparatus a.
Scale or Balance SatisfacInry_
b.
Unit Weight Measure Satisfactory c.
Accassory Apparatus Sa11siggIorv
.
5.
Air Content Apparatus (Volumetric)
a.
Air Meter
__
b.
Accessory Apparatus
__
6.
Air Content Apparatus (Pressure)
a.
Air Meter satisfactory b.
Accessory Apparatus Satisfactory 7.
Compression Test Apparatus Cylinder Molds a.
(1) Reuseable Molds
--
(2)
Single-use Molds Satis, factory b.
Cube Molds Satisfactory c.
Vibrator (s)
--
d.
Capping Eculpment Satisfactory-e.
Compression Testing Machine:
(1) Maker:
Forney (2)
Serial No.:
77094 (3)
Capacity:
400.000-1bf (4) Accuracy of Indication:
(a) Range 400.000 From: 25.000 lbf to 200.000 lbf See_Enotnote 1 (b) Range 30.000 From:
5.000 lb(_ to 20.000 lbf See rootnote.1 (c) Range 30.000 From:
to 30,000 lbf See F_pornote 1 (5) Mechanical Condition Satisfactory (6) Bearing Blocks Satisfactory (7) Accessory Equipment Satisfactory f.
Steel Testing Machine:
(1) Maker:
Forney (2) Serial No.
68213
.
(3) Capacity:
600.000 lbf _
(4) Accuracy of Indication:
See Footnote 1 (a) Range 60C,000 lbf From:
50,000 lbf to 200.000 lbf_ See Footnote 1
'
(b) Range 200,000 lbf_ From:
25,000 lbf to 200.000 lbf (c) Range
_ From:
to
--
.
.
.
.
(5) Mechanical Condition Salinfactqry,_
(6) Accessory Equipment Eatisfactorg_
8.
Curing Facilities Satisfacterg_
a.
Moist Storage Facilities b.
k'atar Storage Facilities
--
9.
Miscellaneous I
Satisfactory a.
Laboratory Temperature b.
Qualifications of Supervisory Personnel Satisfactory Qualifications of Laboratory Personnel Satisfactory _
c.
B.
Aggregate Inspection Equipment 1.
D'ying Apparatus t
Oven's):
(1) Maker:
Serial No.
Satisfactory (2) Maker:
Serial No.
'
b.
Hot Plate (s):
Inspected:
2.
Sample Reduction Apparatus:
See Footnote 2 Splitter (s)
a.
Satisfactory b.
Quartering Accessory 3.
Sieves:
See Footnote 3 Fine Aggregate Sieves a.
See Footnote 3 b.
Coarse Aggregate Sieves 4.
Mechanical Sieving Devices:
a.
Maker: Gilson Serial No. 7837 Satisfactory b.
Maker: Forney Serial No.
--
Satisfactory c.
Maker:
_
__ Serial No.
--
5.
Scales a.
Maker: Triner Serial 52.
232 Satisfactory Capacity: 200 1h b.
Maker: p'Haus Serial No. 2230 Satisfactory.
Capacity: 20 kn c.
Maker:
Serial No.
--
Capacity:
6.
Balances:
a.
Maker:
O'Haus Serial No.
--
Satisfactory Capacity: 2610 g b.
Maker:
Serial No.
Satisfactory Capacity:
c.
Maker:
Serial No.
--
_
Capacity:
1m< i.,
s,.
P00R ORGEL
-
.
.
.
7.
Weights a.
Balanced Used:
O'Haus No. Checked:
Satisfactory b.
Balanced Used:
No. Checked:
--
Satisfactory 8.
Unit Ucight Apparatus Satisfactory 9.
Organic Impurities Apparatus 10.
Specific Gravity and Absorption Apparatus:
. Satisfactory a.
Fine Aggregate Items Satisfactory b.
Coarse Aggregate Items
.
11. Moisture Determination Apparatus:
a.
Surface Moisture Itens
--
See Footnote 4 b.
Total Moisture Items 12.
Lightweight Pieces Apparatus
-
See Footnote 5 a.
Apparatus See Footnote 5 b.
Heavy Liquids 13.
Scratch Hardness Apparatus satisfactory 14.
Clay Lumps and Friable Particle Apparatus satisfactorv 15.
Finer than No. 200 Sieve Test Apparatus See Footnote 6 16.
Compressive Strength Machine See Footnote 1 ROR3Att 121.'
^37
.
l
,. i l
.
.
G e
.
.
SlDDIARY OF INSPECTION Procedures
'
Agreement with ASTM CRD Method Standard Inspection Item Reference Reference Practice A.
Concrete Inspection Procedures 1.
Sampling Fresh Concrete C 172-71 C 4-71 See Footnote 7 2.
Slump test c 143-74 C 5-76 see Footnote 7 3.
Unit Weight C 138-77 C 7-79 Egg Footnote 7 4.
Air Content - Volumetric C 173-78 C 8-79
__
5.
Making Concrete Test C 31-69 C 11-75 See Footnote 7 Specimens 6.
Compressive Strength C 39-72 C 14-73 See Footnote 8
7.
Flexural Strength a.
Third-Point Loading C 78-75 C 16-79
--
b.
Center Point Loading C 293-68 C 17-69
--
8.
Capping Concrete C 617-76 C 29-78 Satisfactory Cylinders 9.
Air Content - Pressure C 231-78 C 41-79 See Footnote 7 B.
Aggregate Inspection Procedures
,
1.
Sampling D 75-71 C 100-75 See Footnote 7_
2.
Sieving C 136-76 C 103-60 See Footnote 9 3.
Material Finer than C 117-76 C 105-79 See Footnote 7 No. 200 Sieve 4.
Unit Weight C 29-78 C 105 '9 Satisfactory 3.
Specific Gravity and Absorption a.
Coarse Aggregate C 127-77 C 107-69 Sae Footnote 7 b.
Fine Aggregate C 128-73 C 108-75 See Footnote 7 C 112-69
--
6.
Surface Moisture
--
7.
Total Moisture C 556-67 C 113-68 See Footnote 4 8.
Effects <
Organic In-C 87-69 C 116-70 See Footnote 7
'
'
purities n Strength 9.
Reduction of Samples C 702-75 C 118-76 See Footnote 7 C 119-53 See Footnote 7 10.
Flat and Elongated
--
Particles 11.
Organic Impurities C 40-73 C 121-74 Satisfactory 12.
Lightweight Pieces C 123-69 C 122-70 See Footnote 7 13.
Scratch Hardness C 235-68 C 130-77 See Footnote 7 14.
Clay Lumps and Friable C 142-78 C 142-79 See Footnotes 7 and 10 Particles 15.
Compressive Strength on C 109-77 C 227-78 See Footnote 11 Cement Mortars
2'
j
,
.
-
- - - - - -
,-
. _ _ _ _
.
.
Footnote Section (1) Compression and Tension Testing Machines (a) The Forney Compression Machine, serial No. 77094, capacity of 400,000 lb, was verified using proving rings that have been calibrated by the US Army Standards Laboratory, Huntsville, Alabama, and the results were as follows and are detailed graphically in inc1 1:
Capacity of Proving Ring, Range, Ibf Within One Percent Ibf From To Accuracy (ASTM E 4-72)
200,000 25,000 200,000 No
.
20,000 5.000 20,000 No 200,000 30,000 No (546/79-16-18; 547/79-16-18)
(b) The Forney Steel Testing Machine, serial No. 68212, capacity of 600.000 lb, was verified using proving rings calibrated by the US Army Standards Laboratory, and the results were as follows and are detailed graphically in Incl 1:
Capacity of Proving Ring, Range, Ibf Within One Percent lb From
])t Accuracy (ASTM E 4-72)
-
200,000 50,000 200,000 No 200,000 25,000 200,000 No (546/79-16-18; 547/79-16-18)
(2) Sample Redrction Apparatus:
Hopper or /an used with the sample splitter was too large for a
.
controlled rate of flow, ASTM C 702-71 T, para 5.1.
(546/79-16-09; 547/79-16-09).
(3) Steves, Fine and Coarse.
A No. 8 and 3/4-in. sieve had exceeded the maximum allowable opening allowed fo* any one individual opening (ASTM E 11-70).
(546/79-16-05; 547/79-16-05).
.
(4) Total Moisture Content:
WES is not familiar with' microwave ovens for drying.
ASD1 C 566-67.
(546/79-16-08; 547/79-16-08).
(5) Lightweight Pieces Apparatus:
A Hydrometer was not.being used for checking the specific gravity of the heavy liquid.
e heavy liquid zine chloride was 1.70 specific gravity when checked. Specific gravity should be 2.00 and 2.40 for
fine and coarse aggregate, respectively.
ASTM C 123-69 and ASTM C 33-74.
(546/79-16-10; 547/79-16-10).
l2l 3)
-
.
---
- - -....
.
.
(6) Finer th.n No. 200 Sieve Test Apparatus:
The container should be of sufficient size to permit vigorous agita-tion without loss of any part of the sample or water.
ASTM C 117-69.
(546/70-16-07; 547/79-16-07).
(7) The following procedures were not run during the inspection, but were discussed with all laboratory personnel involved with these procedures and the personnel appeared to be knowledgeable on all aspects of test-ings.
a.
S:mpling Fresh Concrete. ASTM C 172-71.
b.
Slump Test. C 143-71.
c.
Unit Weight. C 138-74.
d.
Making Concrete Test Specimens.
C 31-69.
e.
Air Content Pressure. C 231-73.
f.
Sampling.
D 75-71.
g.
Material Finer than No. 200 Sieve.
C 117-69.
-
h.
Coarse Aggregate.
C 127-73.
Fine Aggregate.
C 128-73, i.
Effect of Organic Impurities on Strength.
C 87-69.
j.
Reduction of Samples.
C 702-71 T.
k.
Flat and Elongated Particles.
CRD-C 119-53.
1.
Lightweight Pieces. C 123-69C 33-74.
m.
Scratch Hardness.
C 235-68.
n.
Clay Lumps and Friable Particles.
Particles C 142-71.
(8) Compressive Strength.
Testing machines shall apply a load at a constant rate within 20-50 psi /sec.
The compression machine in the main lab was loaded at a higher rate throughout the test.
At 71 psi /see when checked.
ASIll C 39-72.
(546/79-16-04; 547/79-16-04).
(9)
Sieving.
The amount of material retained on any sieve after completion of sieving operation shall not weigh more than 4 grams per sq in.
(200 g per 8-in. diameter sieve).
ASTM C 136-71.
(546/79-16-06; 547/79-16-06).
(10) Clay Lumps and Friable Particles.
Materials tested should be percent retained for each individual sieve size rather than cumulative percent passing.
ASTM C 142-71.
(546/79-16-19; 547/79-16-19).
(11) Compressive Strength on Cement Mortars.
a.
The specimen molds shall be watertight between mold and base plate and they were not.
(546/79-16-11; 547/79-16-11).
b.
Specimens should be placed in moist closet or room immediately
upon molding and they were not.
ASTM C 227-73.
(546/79-16-12;
.
547/79-16-12).
WES understands that the NRC plans further review of the above items 1, 2, 3, 4, 5, 6, 8, 9, 10, 11.
121/
~90
.,
.
.
.
.
APPENDIX n
og3 b
'
L, e
.
O e
.= -
.
.
CRD-C 5 (ASTM C 143)
.
SLIMP CONE CllECK SHEET SATISFACTORY SPECIFIED YES 231 EQUIPMENT REQUIREMESTS X
Netal thickness No less than No. 16 gage
__,
(no measurement less than 0.045 in. at any point if formed by the spinning process)
X Lateral surface of frustrum
_
___
Shape of cone X
8 + 1/8 in in diameter and Base perpendicular to axis of cone 4 + 1/3 in. in diaceter and X
Top perpendicular to axis of cone
X 12 + 1/8 in.
Height X
Inner surface cmooth
___
Condition X
Inner surface free from
___
projections X
Foot pieces Required
___
X Lifting handles Required
__,
Inner surface Not attacked by cement X
___
Tamping rod:
X Straightness Required
___
X Metal Steel
___
X 5/8 in.
___
Diameter X
Length Approximately 24 in.
___
X Tamping End Hemispherical
___
X Diameter 5/8 in.
___
'
-.~M [s Inspector'
WILLARD B. LEE f 2 },'
' O '.
.
_
ge a
4
.
CRD-C 7 (ASTM C 138)
UNIT WEIGHT EQUIPMENT CHECK LIST SATISFACTORY EQUIPMENT REQUIREMENTS SPECIFIED
. TES
If airmeter measuring bowl is used, see pres-sere method air content equipment (ASTM C 231)
check list for require-ments.
-
Measures Cylindrical.
XX
___
Must be made of a metal that is not readily attacked by cement XX paste.
___
.
Must be watertight and suffici;Ttly
.
rigid to tetain its form and cali-brated volume under rough usage.
jg(,
__
Inside surfaces are preferred to be nachined.
_Xg_
__
Handles are preferred.
jgg_
___
The top rim must be smooth and plane within 0.01 in. and must be parallel to ' ae bottom within 0._, degrees.
XX
___
Capacity of measure as specified in Table 1 of CRD-C 7 (ASTM C 138).,13,
_
Accessories A round, straight steel rud, 5/8 in. in diameter and appror.imately 24 in. in length, having the tamp-ing end rounded to a hemispherical tip the diameter of which is 5/8 in. is required.
,33,
___
An internal vibrator, if used, operating at a frequency of 7000 rpm or greater while in use, having a diameter of vibrating element of 0.75 to 1.50 in., and being at least 24 in. long is required.
A
_
A flat rectangular metal plate of at least 1/4 in. thick or a glass or acrylic plate at least 1/2 in.
,
thick with a length and width at least 2 in. greater than the diam-hter of the measure on which it is (. to be used is required as a strike-off plate.
XX
_
121?
~9}
-
.
. _.
..
s
.
-
CRD-C 7 (ASTM C 138)
.
UNIT WEICHT EQUIPMENT CH"CK LIST SATISFACTORY EQUIPMENT REQUIRDfENTS SPECIFIED YES N,00 A piece of plate glass, prefer-ably at least 1/4 in. thick and at least 1 in. larger than the diameter of the measure on whfch it is to be used is required 'or measure calibration.
XX
_
A rubber or rawhide head malf.et weighing approximately 1.25 ;
0.50 lb for measures 0.5 cu ft or less and weighing approximately 2.25 1 0.50 lb for measures larger
.
than 0.5 cu ft is required.
A
_
h Inspector
,
-
,
WILLARD B. LEE 121.'
^:9 4
,
.
t
- **
e
,
,
.
.
4
-
e e
.
4 -
.
.
.
CRD-C 10 and 29 (ASTM C 37 and 6)
CAPPING CONCRETE CYLINDERS CHECK SHEET
.
SATISFACTORY YES 131 SPECIFIED PROCEDURE REQUIREMENTS Must be kept moist during capping.
xx__
___
Specimens prior to C"PP "U Must be inspected and defects I
KK__
_
recorded.
Must be placed in capper, then XX compound added.
Must not be stored under water but Capped specimens must be covered with wet burlap XX until tested.
_
Must not be capped more than 72 hr XX before testing.
_
Sulfur caps should be allowed to cool
.
for about 30 sec prior to removing XX cylinder from capper.
___
Minimum time bef ore testing sulfur or plastic capped specimens 2 hr.
Eg__
___
Must be free from chips and cracks.
gx__
___
Caps XX Must adhere to specimens.
___
Must not be too thick (approx.
XX'
1/8 in. is acceptable).
___
Must be checked for planeness and perpendicularity at least every 10th specimen (see equipment check sheet XX for details).
_
XX Cap surfaces must be free from oil,
___
water, grease, and foreign matter XX at time of testing.
___
Broken caps must not show evidence of XX flowing or fracturing.
___
r Inspector WILLARD B. LEE
.
O f.,-
!
.
.
.
.
CRD-C 14 (ASTM C 39)
COMPRESSIVE STRESGTil TESTING C11ECK SilEET SATISFACTORY SPECIFIED YES NO EQUIPMENT REQJIREMENTS Testing machine Vertical and horizontal Sufficient for insertion of ring and bearing blocks clearance so ring face approximately parallels machine front NX Machine bearing Both hardened steel, Rockwell hardness C55 blocks XX or more
_
Faces are plaae to.001 in. across any'6 in.
XX
__,
,
Inscribed with concentric
'
circles if diameter of spherically seated block exceeds the diameter of the XX
_g specimen by 1/2 in. or more The center of the fixed bearing block must be directly belou the center of the spherical head n
_
Diameter of the fixed bearing plate must be at least 6.18 in.
for testing of 6-x12-in.
cylinders n
_
Diameter of the spherically suspended block shall not exceed 10 in. for testing of 6-x12-in. cylinders XX
___
Spherically suepended plate capable of being rotated and XX tilted 40 in any direction
__
When radius of the sphere is smaller than the radius of the specimen, the portion of the suspended bearing block extending
-
beyond the two spheres must have a thickness at least equal to the
-
difference between the two radii XX
_
.
.
q 121/
29S -
.
.
.
,
CRD-C 14 (ASTM C 39)
COMPRESSIVE STRENGTH TESTING CHECK SHEET
"
SATISFACTORY SPECIFIED YES KC)
EQUIPMENT REQUIREMENTS Readable to 250 lb or less jg(_
Graduated scale
___
P.ovided with a zero graduation so numbered XX
___
Loading range satisf actory (No loads recorded below value 100 times smallest readable change in loading range)
XX
___
Must be long enough to reach '
Dial pointer XX graduation marks
__,
Width of leading end shall not D
exceed clear distance between XX smallest divisions
___
Must have zero adjustment Zero adjustment operated outside the dial XX case
_
'
Maximum load indicator Must have one which does not cause load indication to be XX out of tolerance
_
XX Loading mechanism Must be power operated
___
Must apply load continuously at specified constant rate
,
(20 - 50 psi /sec)
20!
P (Inspector)
A OLEN K. LOYU' '
_
See Section I(5s of this report, (546/79-16-04; 547/79-16-04).
- 121?
^97
.
-.
.
.
.
CRD-C 14 b
(ASTM C 39)
TESTING OF COMPRESSIVE STRENGTH CYLINDERS CHECK SHE SATISFACTORY YES NO SPECIFIED PROCEDURE REQUIREMENTS Test specimen must be kept moist Specimen condition between removal from mold and
_yx, testing and tested moist.
___
Lower and upper baaring surf aces XX
___
must be clean.
Diameter measured to 0.01 XX Specimen measurement (avg of 2).
_
XX Height measured to 0.1 in.
___
XX Must be centered in testing machine.
,__
Specimen placement Spherically seated block must be ro-Load application tated while being brought to bear XX
_
on specimen.
Load must be applied continuously XX without shock.
_
Loading rate shall be 20 to 50 psi
,
E per sec.
Apply load until failure and record XX maximum load and type of failure.
___
XX Must be to nearest 10. psi.
__,
Strength calculation
'
[I c),
d,<
Inspector WILLaRD E. LEE See Section 1(3) of this report, (546/79-16-04; 547/79-16-04).
.
h
.
O e
.
.
CRD-C 29 (ASTM C 617)
CONCRETE CYLINDERS CAPPING EQUIPMENT CHECK SilEET
SATISFACTORY EQUIPMENT REQUIREMENTS SPECIFIED YES
}gl Capper Must be designed to produce smooth, P anc, parallel caps with thickness l
Make Forney approx 1/8 in.
XX Serial No.
_
Cap bearing surface must be plane within 0.002 in.
XX
__
Base thickness, if metal must be at least 1/2 in. thick, if glass 1/4 in. XX Minimum diameter of base must be at least 1 in. greater than specimen diameter.
XX
_,,_
Must be equipped with aligning device.XX
___
.
Bottom capped surface shall not depart from perpendicularity with long axis more than 0.5 (approx 1/8 in. in 12 in.).
XX
_
Two capped surfaces shall not depart from perpendicularity more than a combined 3.0 (approx. 5/8 in. iH 12 in.).
XX
__
Melting pot Shall be capable of maintairdng temper-ature of approximately 2900F (material free flowing).
XX
_
Capping caterial Must be capable of developing compres-sive strength and modulus of elasticity greater than test specimen (test in 2-in. cubes).
X2L_
___
Portland cement cap mix must be mixed 2 to 4 hr prior to capping.
2DL_
---
Gypsum must be useo only on specimens with strength below 5000 psi.
Igt_
___
ed.
M Inspector WILLARD B. LEE
121/
^97
.
.
.
_
CRD-C 41 (ASTM C 231)
.
AIR CONTENT EQUIPMENT CHECl; SHEET SATIS FACTORY EOUIPMENT REQUIREMENTS SPECIFIED YES NJ)
Air Pot Type A or B (Circle One)
-
Serial No.
Measuring bowl Must be rigid enough to make a pressure-tight container of constant volume, accurately determined.
y
_
Must be made of material not attacked by cement.
XX
___
Diameter must be 0.75 to 1.25 times the height.
XX
___
.
Mixing bowl volume shall be a minimum of.20 cu ft.
XX
__
Eowl cover Must combine with bowl into a rigid pressure-tight assembly.
XX
___
Must have a means of direct reading of the air content.
XX
___
Must have petcock for bleeding off water.
XX
_
Must have hand pump provided.
XX
___
Pressure system Must have facilities for applying a known pressure to the system and observing its effect on the volume of the sample.
XX
___
The hand pump must be in go~d working order.
XX
___
The minimum range of the recording gage must be 8 percent.
XX
___
The maximum smallest division on the recording gage shall be 0.1%.
_ jot
___
Accessory Tools Appropriate tools must be provided for placing and consolidating the sample (5/8-in, rod, scoop).
_jac
___
A trowel of the brick mason's type is required.
_XX
__
A mallet with a rubber or rauhide
head is required (1/2 lb for con-tainers less than.5 cu ft)..
_jgt
___
There shall be a flat, straight, steel strike-off bar.
XX
___
121?
?0 I
A.$
Inspector WILLARD B. LEE
.
.
.
CRD-C 96 (ASTM C 470)
CYLINDER MOLDS CHECK SHEET REUSABLE MOLDS SATISFACTORY EQUIPMENT REQUIREMENTS SPECIFIED YES g
Material Heavy gage metal er other rigid
-
non-absorbent material.
_
Nominal Size (Describe)
Base Plates firmly Required
_
held to mold Molds oiled for preser-Good practice.
_
vation.
Inside surface Smooth and free of blemishes.
.
_
Perpendicularity of Planes of top rim and bottom opening and base perpendicular to the axis of mold within 0.5 degrees (approxi-mately 1/8 in, in 12 in.)
_
Diameter variation Not to exceed 1 percent from nominal
_
Height variation Not to exceed 2 percent from nominal
_
Watertightness Required
_
SINGLE-USE MOLDS SATISFACTORY EQUIPMENT REQUIREMENTS SPECIFIED YES g
Material Sheet metal
_
Plastic XX Paper Other (describe)
_
_
Nominal Size (Describe)
6 x 12 XX
_
Watertightness Required NA
_
Kosorptivity Not to exceed specified values (not required for metal molds)
XX
_
Elongation Not to exceed specified values (not required for metal molds)
XX Side wall thickness For metal molds, not less than
_
-
0.0118 in. (30-1/2 gage)
NA _
_
.
(
121J 70:
o
.
,
e
.
.
CRD-C-102 (ASTM E 11)
SIEVES AND MECHANICAL SIEVING DEVICES Type of Cearse Aggregate Siever Gilscn Serial No.
7837 Type of Fine Aggregate Siever Forney Serial No. N/A General Condition of Sieving Devices Good
- .<
General Condition of Sieves Good MIDTH OF SIEVE OPENING. IN.
AVERAGE MAX. FOR MAX. FOR SATIS-SIEVE NOMINAL LOW HIGH 5% OF ANY OPEN-FACTORY SIZE LIMIT LIMIT OPENINGS ING YES NO
.
4 IN.
4.0000 3.8189 4.0551 4.0945 4.1260 3 IN.
3.0000 2.8661 3.0394 3.0748 3.0984 2-1/2 IN.
2.5000 2.4055 2.5551 2.5827 2.6063 2 IN.
2.0000 1.9094 2.0275 2.0512 2.0709 1-1/2 IN.
1.5000 1.4567 1.5433 1.5394 1.5551 XX 1 IN.
1.0000 0.9528 1.0157 1.0276 1.0394 XX-
3/4 IN.
0.7500 0.7244 0.7717 0.7835 0.7913 XX 1/2 IN.
0.5000 0.4768 0.5075 0.5157 0.5240 XX 3/8 IN.
0.3750 0.3622 0.3858 0.3925 0.4000 XX No. 4 0.1870 0.1811 0.1929 0.1976 0.2024 XX No. 4 0.1870 0.1811 0.1929 0.1976 0.2024 XX
,,
0.0937 0.0898 0.0961 0.0990 0.1024 XX XX
0.0469 0.0447 0.0482 0.0500 0.0524 XX
0.0234 0.0226 0.0246 0.0260 0.0274 XX
0.0117 0.0113 0.0124 0.0133 0.0143 XX 100 0.0059 0.0056 0.0062 0.0069 0.0076 XX 200 0.0029 0.0028 0.0031 0.0036 0.0041 OTHER
PERCENTAGES FROM CRD-C 102 WERE USED TO CALCULATE SIEVE OPE:iING LIMITS
WES understands that the NRC plans further review of these items (546/79-16-05; 547/79-16-05).
121?
,
.
/
L i
-
.
.
.
.
SIEVE ANALYSIS CHECE SHEET CRD-C 103-60 AST!! C 136 SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES NO Balance or Scale Sensitive to 0.1 percent XX
_
of the weight of sample
Sieves Must conform to CRD-C 102-78 XX (ASTM E 11) (See Test Check)
Must be moanted in frames XX
_
that will prevent loss of material during sieving
,
PROCEDURES TO BE CHECKED Sample Size Amount of coarse aggregate Amount,
,
Max. Size, in.
kg _,
3/8
-
1/2
3/4
[
-
12 XX 1-1/2
-
._.
20 2-1/2
[
45
_
Amount of fine aggregate Material Size Amount, g With 95 percent finer than No. 10 100 With 85 percent
-
passing a No. 4 sieve and more than 5% retained on a No. 8 500 XX
_
Preparation Size reduced by splitter XX or quartering
_
Must not be weighed to exact XX predetermined weight
_
.
Dried to constant weight XX
_
Sample finer than No. 200 XX
_
determined by CRD-C 105-77 (ASD1 C 117)
- WES understands that the NRC plans further review of this item (546/79-16-05; 547/79-16-05).
-
,-
) } ],'
? fl '
~
.
.
.,
_
.
.
CRD-C103-60 SIEVE ANALYSIS CHECK SHEET ASIN C 136 SATISFACTORY YES NO SPECIFIED JROCEDURES TO BE CHECKED Conducted by means of lateral gx__
__,
Sieving and vertical motion with a jarring action.
XX Particles shall not be turned
___
or manipulated by hand
^
Sieving shall be continued 33__
___
until not more than 1 percent by weight passes during an additional 1 minute.
,
Amount left on one 18-in by L'
___
35-in Gilson sieve shall not exceen 251bs.
gg$
Amount left on one 8-in sieve shall not exceed 200g Results of percents passing each sieve shall be reported to the nearest percent gg__
___
Material finer than the No.200 XX
___
sieve shall be determined by
,
CRD-C 105(k' ashing) (ASTM C 117).
[
At Inspector
.
-
OLEN K. LOYD '
WES understands that the NRC plans further review of this item
(546/79-16-06; 547/79-16-06).
121J 300
.. _..
,
.
.
MATERIAL FINER THAN NO. 200 SIEVE BY WASHING CRD-C105-77 ASTM C 117 SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES NO Balance / Scale Shall be accurate within all XX
_
percent of load Sieves No. 200 and No. 16 shall conform to CRD-C 102 (ASTM E 11)
XX
_
Container Watertight and sufficient size X_X_
_
Oven Capable of maintaining temperature of 230190F XX (11015 C)
-
_
PROCEDURES TO BE CHECKED Samples Mixed, reduced by splitter or quartering
_
Moistened to prevent loss of dust and segregation
_
Weight shall be Maximum Size Minimum Weight,g 1 I-in.
5000 s
_
3/4-in.
2500
_
3/8-in.
2000
_
No. 4 500
_
No. 8 100
_
Reduction to and exact pre-determined weight shall not be permitted
_
Test Sample shall be dried to constant weight at 230 1 90F(110 i 5 C)
_
Weigh sample to 0.1 percent of weight
_
Wash sample, agitate, decant finec, repeat
_
Wk
<
e JP9/
Insp=ctor r
'
.
,
OLEN K. LOYD
- WES underscana that the NRC plans further' review of this item (546/79-16-07; 547/79-16-07).
121?
.
.
CRD-C 106-79 ASTM C 29 UNIT WEIGHT OF AGGREGATE SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES NO Balance / Scale Shall be accurate to 0.1 percent gjt_
___
of load.
Tamping Rod Round, straight steel rod, S/8-gg_
__
in. (16 mm) diameter and 24 in.
,
(600 mm) in length.
One tip shall be hemispherical.
}gt_
___
Measure Cylindrical metal measure.
}gt_
__
.
Shall be watertight.
gg_
__
Top rim shall be smooth and XX
___
plane to within 0.01 in. (0.25 mm) and parallel to bottom within
0.5 deg.
.
The capacity and dimensions shall be Minimum Inside Inside Thickness, in.
Diameter, in.
Height, in.
Bottom Wall Capacity, ft 1/10 6.0 + 0.1 6.1 + 0.1 0.20 0.10 1/3 8.0 + 0.1 11.5 + 0.1 0.20 0.10 1/2 10.0 + 0.1 11.0 + 0.1 0.20 0.12 XX Oven / Hot Plate Must be capable of maintaining XX
~
ASTM C 29
. temperature of 220 to 230 F (105 to 110 r)
Plate Glass Large enough to cover the measure.XX PROCEDURES TO BE CHECKED Calibrator Fill measure with water, cover XX
___
with glass plate to remove bubbles and excess water.
Determine net weight of water XX
__
to 0.1 percent.
121:
' 0 :,
.
.
s
.
.
Rodding Maximum size aggregate shall be XX
_
1-1/2 in. (40 mm).
Fill measure to one-third full, XX rod 25 times.
Fill measure to two-thirds full, XX
_
rod 25 times.
Overfill measure and rod 25 times.XX
_
Level measure by hand or straight-XX
_
edge.
Weight shall be recorded to 0.1 XX
_
percent.
.
l-
. T-sk inspector
/i WILLARD B. LEE
,
U 121?
X
-
.
I
,
.
=
.
SPECIFIC GRAVITY, ABSORPTION, AND UNIT WEIGHT CRD-C107-69 COARSE AGGREGATE ASTM C 127 SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES NO Balance / Scale Must have capzeity of Skg, XX
_
Serial No.
232 sensitive to 0.5g, accurate to 0.1 percent of load Sample Container Wire basket of No.6 mesh, 3
---
XX capacity of 4000 to 7000cm with equal height and breadth.
Suspending apparatus Must suspend the sample container XX
__
in water from the center of
'
the scale or balance Oven Capable of maintaining a tempera-XX
___
ture of 212 to 2300F(100t.ol100C)
PROCEDURES TO BE CHECKED Sample Sample Size shall be at least
___
5 kg coarser than No. 4-Sample shall be obtained by
___
splitter or by quartering Sample shall.be washed free of
__
_
dust or surface coatings Dry to constant weight at tem-perature of 212 to 230 F Immersed in water for 24+ 4 hrs
__
Sample shall be surface dried with large abosrbent cloth by
___
s rolling action ef i
Inspector
-
OLE 5 K. LOYD**
-
E c
r
.
ee
&
.
.
SPECIFIC CRAVITY AND ABSORPTION CRD-C108-75 FINE AGGREGATE ASTM C 128 SATISFACTORY EQUIP > LENT TO BE CHECKED SPECIFIED YES Jj0 Balance / Scale Must have capacity of 1 kg n
_
sensitive to 0.lg, accurate to 0.1 porcent of load
Flask Capacity of 500cm calibrated to 0.15cm3 at 20 C A
_
Mold Conical metal mold, top inside diameter of 401 3mm, bottom inside diameter of 901 3mm,
,
height of 751 3mm and minimum thickness of 0.8mm A
_
Tamper Metal tamper weighing 121 1/2 oz (3401 15g) and a face lil/b in
,
(251 3mm) om diameter y
_
PROCEDURES TO BE CHECKED Sample Shall weigh approximately 1000g
_
Ohall be obtainea Jy means of sample splitter or quartering
_
Immersed in water for 241 4 hrs
_
Uniformly dried to SSD Condition
_
~__ :r ;.. - I..
. _
>
Introduce 500.0g sample into flask, fill with water, remove air bubbles, adjust temperature to 73.4130F'.
(231 1.70C)
_
Dry to Constant weight at temper-ature of 212 to 230 F(100to110 C)
_
/l
/ Inspector
,
OLEN K. LOYD
) 2 ),'
) fl ')
.
.
.
TOTAL MOISTURE CONTENT BY DRYING CRD-C113-68 ASTM C 566 SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES g
Balance / Scale Sensitive to 0.1 percent of weight tested XX
_
Heat Source Capabic of maintaining temperature of 212 to
,
230 F(100 to 1100C)
X_X Sample Container Metal container not affected by heat, and suf ficient volume XX
_
Stirrer Metal spoon or spatula XX
_
,
PROCEDURES TO BE CHECKED Sample Representative of moisture content being tested
_
Shall weigh Max. size, in.
Min. weight,kg 1/4(sand)
0.5 XX
_
3/8 1.5
~
1/2
~
3/4
_
4 XX
_
1-1/2
_
Thoroughly dry when less than 0.1 percent loss occurs with further heating XX
_
Surface moisture is determined as the difference between total moisture and absorption.
XX
_
.
OLEN K. LOYD ( ~
Inspector
_
aWES understande that the NRC plans further review of this item (546/79-16-08; $47/79-16-08).
.
] } 1,1 7n l
.,s
.
.
'
..... _,, _
CRD-C 118-76 ASTM C 702 REDUCING FIELD SAMPLES OF AGGREGATE TO TE4fING SIZE SATISFACTORY YES NO SPECIFIED EQUIPMENT TO BE CHECKED Shall have even number of equal
_Xyu
,__
Sample Splitter width chutes.
Fine Aggregate Splitter shall XX not have less than 12 chutes.
Coarse aggregate splitters shall XX not have less than eight chutes.
Minimum width of chutes shall be XX
___
50 percent larger than the maxi-
-
num size aggregate.
XX Shall have two receptacles.
,_,
Shall have hopper or pan equal 22(
or slightly less than the overall widths of chutes.
Shall allow sample to flow XX
___
smoothly without testriction or loss of material.
Straightened scoop, shovel or
__
Quartering trowel, broom or brush and a canvas blanket 6 ft by 8 ft.
PROCEDURES TO BE CHECKED Fine aggregate shall be reduced
__
Samples by mechanical splitter when drier than SSD.
Fine aggregate with free moisture
___
may be reduced by quartering.
Coarse aggregate shall be reduced
___
by mechanical splitter or quarter-ing.
Reintroduced into the splitter as
__
Fine Aggregate
-
many times as needed to reduce for the intended test.
WES understands thrt the NRC plans further review of this item
(546/79-16-09; 547/79-16-09).
121/
21:
.
.
Turn entire sample over three
_
Coarse Aggregate
.
times.
Form a conical pile, flatten and
_
divide into four quarters.
Remove diags $al quarters in-
_
cluding dust.
Remix and quarter until sample
_
is of the desired size.
'
Inspector OLEN K. LOYD
.
121 '
~ ! ^
=
.
.
CRD-C 119-53 FLAT AND ELONGATED PARTICLES COARSE AGGREGATE SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES NO Proportional Caliper Consists of base with two fixed
__,
Device posts and a swing arm.
Arm positioned so that the open-
ings between the post and arms
___
are a constant ratio.
Balance / Scale Must be sensitive to 0.5 percent xx
__
of the sample.
.
PROCEDURES TO BE CHECKED Sample Representative sample
__
Size Reduction by quartering
__ s and/or splitting.
100 particles must be obtained of each sieve size larger than
___
3/8 in, and represented by 10 percent or more of the sample.
Flat particle One having a ratio of vidth to
__
thickness greater than 3.
Elongated particle One having a ratio of length to
__
width greater than 3.
Reporting Results shall be reported to
__
the nearest 1.0 percent.
Inspector
'
OLEN K. LOYD
'
- The apparatus was broken at the time of this inspection and was being repaired.
121?
j'
,
b,
.
e CRD-C 121-74 ASTM C 40 ORGANIC IMPURITIES IN SAtm SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES NO Class Bottles Must be approximately 12 fl oz XX
__,
(350 ml), colorless, graduated with cap or top, neagent Sodium Hydrox-3 percent solution by weight.
XX
___
ide Solution Reference Standard Color Potassium dichromate dissolved
~~~
Solution in sulfuric acid at 0.250 g/
100 ml of acid.
.
Freshly made (2 hr).
___
Cardner Color Scale May contain the five color XX
___
solutions.
PROCEDURES TO BE CHECKED Sample Representative sample.
XX
___
Shall weigh 1 lb (450 g).
XX
___
Fill glass bottle to 4-1/2-oz XX
___
(130 ml) mark.
Add 3 percent NaOH solution.
XX
___
to 7 oz (200 ml) mark.
Shake vigorously.
XX
___
Allow to stand 24 hr.
XX
__.
Compare supernatant liq'!id to XX
___
standards.
Inspector u
OLEN'K. LOY6'
121.'
.
I l.,
I
.
a we e
a
.
.
CRD-C 122-70 ASTM C 123 LIGHTWEIGHT PIECES _
SATISFACTORY N0,0 SPECIFIED_
YES_
EQUIPMENT TO BE CHECKED Must have a capacity of at Icast XX_
_
Balance 500 g, sensitve to 0.1 g for fine aggregate, i
XX Must have a capacity of at least
_
5000 g, sensitive to 1 g for coarse aggregate.
Suitable for drying sample.
XX_
_
Containers XX Suitable for holding heavy
_
liquids.
.
XX No. 50 sieve cloth.
_
Skimmer XX Hot Plate / Oven Capable of mainteining a tempera-
_,
ture of 221 to 230 F (105 to 130 C).
No. 4 and No. 50 sieves conform-XX
_
Sieves ing to CRD-C 101.
- Capable of measuring the specific X_X Hydrometer gravity to within +0.T.
Zine chloride in water.
XX_
_
Heavy l'. quids Mixture of carbon tetrachloride
_
or kerosine with 1, 1, 2, 2 tetrabromeethane.
Mixture of bromoform with mono-
_
bromobenzene.
Mixture of bromoform with ben-
_
zene.
PROCEDURES TO BE CHECKED _
A XX Must be mintained within 40.01 Specific. Jravity during the test.
(546/79-16-10; WES understands that the NRC plans further review of this ite
547/79-16-10).
1 2 1.'
- ? :,
.
.
.
.
Samples Shall Weigh Maximum Minimum Size, in.
Weight, g 1/4 200
~~
3/4 3,000 1-1/2 5,000
[
10,000
_
Shall be dried to constant
~
weight at temperature of 221 to 230 F (105 to 110 C).
Fine Aggregate Sample brought to a SSD condi-
_
tion.
Weight recorded to nearest 0.1 g.
_
.
Conrse Aggregate Sample brought to a SSD condition.
_
Weight recorded to nearest 1 g.
_
<
A.
Inspector OLEN'K. AY C l '/ 1.'
'1. o-
.
,
e
.
.
.
CRD-C 130-77 ASTM C 235 SCRATCH HARDNESS COARSE AGGREGATE SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES E
Brass Rod 1/16 in. (1.6 en) diameter.
XX
_
Rounded point.
XX
_
Capable of applying a force XX
_
of 21 0.1 lbf (8.910.4 N).
PROCEDURES TO BE CHECKED Sample Must not contain material finer
_
.
than the 3/8-in. sieve.
Shall weigh Sieve Size, in.
Sample Weight, g
_
3/8 to 1/2 200
~
1/2 to 3/4 60')
-
3/4 to 1 1,500
~
1 to 1-1/2 4,500
-
1-1/2 to 2 12,000
_
Test A scratching mortion shall be
_
applied to each particle.
Inspector t
n OLEN K. LOYD l2}'
.
.
O
.
.
.
CRD-C 142-79 ASTM C 142
.
CLAY LUMPS AND FRIABLE PARTICLES SATISFACTORY EQUIPMENT TO BE CHECKED SPECIFIED YES NO, Balance / Scale Must be accurate to within 0.1 XX
_
percent of load.
Containers Must be rust-resistant.
XX
_
Must be so shaped and sized XX
_
to spread sample in a thin layer.
- Sieves Conforming to CRD-C 102 (ASTM g
E 11)
Oven Capable of maintaining a tempera-XX
_
ture of 110 1 5 C (230 1 90F).
PROCEDURES TO BE CHECKED
Sample Shall weigh Minimum Particle Sizes, in.
Weight, g Coarser than No. 16
_
No. 4 to 3/8 1000
_
3/8 to 3/4 2000
_
3/4 to 1-1/2 3000
_
-
Over 1-1/2 5000
_
Shall be dried to constant weight at 11015 C (23019 F).
~
Test Sample shall soak in distilled
_
water for 24 1 4 hr.
Manually attempt to break indi-
_
vidual particles.
Wet sieve broken particles out.
_
Inspector
~ OLEN'K. LOYD "
_
WES understands that the NRC plans further review of this item (546/79-16-05; 547/79-16-05).
-
121.'
210
.
,
T
'
.
-
CRD-C 227-78 ASTM C 109 COMPRESSIVE STRENGTH OF HYDRAULIC CEMENT MORTARS SATISFACTORY YES M
EQUIPMENT TO BE CHECKED SPECIFIED
-
Scales Permissible variation shall be XX
_
i 2.0 g at 2000-g load.
-
Weights Permissible variation shall be Permissible Weights, g Variation, g
0.01
_
0.02
_
0.03
_
0.04
__
,_
0.05
___
-
0.10 100 0.15
_
200 0.20
_
__.
250 C.25
___
300 0.30
,_,
500 0.35
___
750 0.40
_
900 0.45
___
1000 0.50
_
_ _ _
Specimen Molds Shall not have more than three XX
_,
cubes compartments and separable into no more than two parts.
Shall be rigid to prevent spread-XX
_
ing or warping.
Interior faces shall be plane to XX 0.002 in. (0.005 mm) for old
_
molds.
Distance between opposite faces XX
_
shall be 210.02 in. (50 1 0.50 mm).
Height shall be 2 + 0.01 - 0.015 XX
_
in.
Angles between adjacent faces XX
_
shall be 9010.5 deg.
Tamper Nonabsorptive, nonabrasive, non-XX
_
brittle material either rubber or l oak.
i
,jn
w J I /
,
_.
,
.
Shall have cross section of 1/2 XX
,_,
by 1 in. (13 by 25 mm) and a length of 5 to 6 in. (120 to 150 mm)
Tamping face shall be flat and XX
,_,
at right angles to the length.
Trowel Shall have steel blade 4 to 6 XX
~~~
in. (100 to 150 mm).
'
Testing Machine Load shall be accurate to + 1.0 XX percent of load and shall conform to CRD-C 14 (ASTM E 4).
PROCEDP
,Ji BE CHECKED
.
Moist Temperature shall be 73.4 + 3 F XX
.
(23 + 1.7 C).
Humidity shall be not less than XX
__,
95 percent.
- Specimens Minimum of two specimens per XX
__
. period of test.
Holds Mineral oil or light cup grease XX
-
__,
shall cover the interior faces of the molds.
sk Shall be watertight by wax com-JO!
pound (3 parafin to 5 rosin by weight heated 230 to 2400F (110 ta 120 C).
Holding Fill mold in two layers each XX
__,
followed by 32 strokes of a tamper in 4 rounds.
First layer of each mold shall XX
,_,
be tamped before going to the second layer.
Level with use of a trowel using XX
'
__,
a sawing motion.
Storage Immediately place the specimens 20!
in a moist closet or room for 20
.
to 24 hr.
,
l
-
iRC plans further review of this item (546/79-16-11; WESunderstandsthatthe{1
,,547/79-16-11).
WES understands that the NRC plans further review of this item (546/79-16-12; 3,,547/79-16-12).
WES understands that the NRC plans further review of this item (546/79-16-13; 547/79-16-13).
,9n
-
,
,J
.
.
.
Shall be protected from dripping
_
water.
Following initial 24-hr store in E
_
saturated line water.
Strength Specimens shall be broken at age Permissible Test Age, days Tolerance, hr 24 hr
+1/2
~
+1'
13 m
_
112 g
_
Report results to nearest g
_
10 psi.
.
/-
Inspector OLEN K. LOYD 121 '
~' 2 :
.
,
.
.
SCALES AND BALANCES (NBS HA"DBOOK 44, Fourth Edition)
Pound Scales- }!anuf acturer_ _
Satisfactory-Yes( )
Serial No.
Capacity Sensitivity No ( )
(0.25 lb max.)
Description (Dial, Platform, Beams, Weights,etc.)
.
Gra= Balances-}1anufacturer Ohaus Satisfactory-Yes(X)
Serial No.
NA Capacity 2610 g Sensiti.-ity No ( )
(.1% capacity max.)
Description (Direct readings, pans, weights, beams, etc.)
Triole beam balance (0 to 10g with 0.1 SUB)
(0 to 100g-Idg SUB)
(0 to 500-100g SUB)
.
-
WEIGliTS SCALES
_
UNIT, SATIS-NOT UNIT, WEIGHT SATIS-NOT LB,OR GRA31l TEST
'
LOAb FACTORY SATIS-LB. OR TESTED FACTORY SATIS-FACTORY GRA31 jFACTORY
I l
X
'
500 I l
X i
X
!
l X
i 1000 l
i X
l 1000 l X
l X
'
t l-X i
l l
1 X
l
{ '"~~
l X
j
,
l X
I
l X
l
.
100
X l
I 100 X
300 X
59d X
,
1500 X
2000 X
2610 X
.
.
A 121J
_2^
-
..
.
..
.
.
SCALES AND BALANCES (NBS HANDBOOK 44, Fourth Edition)
Pound Scales- }bnuf acturer _ _ Triner Satisfactory-Yes(X)
Serial No.
232 Capacity 200 Sensitivity No ( )
(0.25 lb cax.)
Description (Dial, Platform, Beams, Weights,etc.) Dual Beam - O to 5 lbs and 0 to 200 lbs Gram Balancec-Manufceturer Satisfactory-Yes( )
Serial No.
Capacity Sensiti.-ity No ( )
(.1% capacity max.)
Description (Direct readings, pans, weights, beams, etc.)
.
WEICHTS SCALES
?
LB,0RCRAMl TEST TESTED { SATIS-UNIT, SATIS-NOT UNIT, WEIGHT NOT
'
LOAD FACTORY SATIS-LB. OR FACTORY SATIS-FACTOPY GRAM
- FACTOR'
l
l X
!
l l
~
!
L X
l l
i
X l
l
10 X
{
For un$t weight
- est l
25 l
X l
1
X l
i 100 t 100 X
l l
l l
_
150 l 150 X
l i 200 x
2nn
!
i
,
.
-
_
a 121.'
'2;
...
.
e
SCALES AND BALANCES (NBS HANDBOOK 44, Fourth Edition)
Pound Scales,- Manufacturer Satisf actory-Yes( )
Serial No.
Capacity Sensitivity No ( )
(0.25 lb max.)
Description (Dial, Platform, Beams, Weights,etc.)
Gram Balances-Manufacturer 0haus Satis f actory-Yes (K )
Serial No.
2230 Capacity 20 kg Sensiti.-ity No ( )
(.1% capacity =sx.)
Description (Direct readings, pans, weights, beams, etc.)
Dual Beam (0 to 100 g with Ig subgradation) (0 to 1000 g with 100 g Sub.)
.
WEIGHTS SCALES I SATIS-NOT UNIT, TEST SATIS-NOT UNIT, WEIGHT
'
LB,0R GRAM LOAD FACTORY SATIS-LB. OR TESTED FACTORY SATIS-FACTORY GRAM FACTOR 1
i l
X l
30 X
I
t X
l
X
!
l
100
X i
l l
l l
100 I
l X
l l
_
300 l
X 500 l
X
_
700 i
X 1000 I
X 1000 X
2000 X
5000 X
- 81Cllll =
,
10,000 X
15,000 X
,
20,000 X
,
'
_ _
] s"). J,'
J L.
'1'
-
(
...-.-
.
.
'
.
&
-
.
Y
%
?
C"3
__JIlj H
I! !y i!!'
i I
I i
l l l' li!
h
"
~
'
II cs*
i
,
% ~.J
+
.
d '
+
- a=
i D
i j.
- -
z :=1 i
,
Error,
,
Percent 0
Y El 1:t l:
-1
__
-
,
(k0
,
d
.
.2
,
.
-3 m
.,
__.
- _
-
t.
e t'J o o e
o o
o Forney C.xupression Machine
8
8
Serial No. 77094 L i
'
d J
o'
o'
30,000-1b Dial S
S O First Calibration Run
""
"
Load, Pounds Figure 1.
Error in Percent n:. elecorded Load D Second Calibration Run WES FORM NO.
1780 Jut.y issa
b i
-!
!!
I-;:
.
!
W ii!.e
!"
al;!v"!!'!
-
L.
- I-
- < <..
!
!
d
%CCD om 23"
= ""
= "
_
en i
hc n
_
a l nu l
M auR iR n4D n
o9 no i0h oi s7l it s7 - t a 0 ar e
0 rb r
p o 0, b i e. N il 0l a C10 aC s4 C yt d
e r t n ne so
rs rc e
i e F
FS OO
.
N I
d o8J8a
,
oL
~
de droce R
l f
,,"
o8J" o tnecre
-
P n
i
-
ro
.
I e8JC,. rr
E
.
e
.
r
'I ug i
t F
l o8J" l.
-
y
'
s l.
s, d
nu t
- ('l o
P i
i l
.
s o8J"
,
.
]
d
.
':
o8y" a
.
o
1 L
1
-
2 t
1
3
.o
-
-
-
-
n r
.tn u86 re n9 oc o1 r
rr Y.
re sL EP cU wJ a. j -
xV'C
'
.
.
.
Ii!
.!
I
~
~]I:
,-
il O m M Q M:d_u
%
a-
.*
en i
i n
n
.*
I
!
h i nu c
DuR a
R I
M3b n
1l no g2 - oi n80it i
i60t a l
t 0,a r s.
rb eo0bi TN0il 2l a ll aC ea C
et d
tr t n Se so
'
S rc y
i e e
FS nro OO F
.
d u
o8dSa
-
oL de droceR f
l o8'o* o
tn
e I
cre P
n i
l
,
ro U
o8dSrr
~
E
.
eru j
g l
i
,
F
o8d"
.
jg l{
l
- s'
'
s d
',
n
$*
uo 2 $'
P
'
o8*o'"
,
l d
i.
o8d" a
i o
!
L
1
.
2
0
2
o
-
-
-
N
,t Me n
s n e re ot oc r
rr t
su re au
- EP wJ
-
N._
, J 4
.
-
_-
.wr-
i t
!
!i Pf i illa
- i
!
i!h'l= !!
4 ?. F l
P i
.s i! '
E ?
!!
!
- 0 i!rli!
aOODcD_CWI"
-"J
"
"
"
I
"
en i
i n
n h
inu c
DuR a
R M3b n
1l no g2 - oi n80it i60t a ar 0, r b ts.
eo0bi TN0il 6l a il aC ca C
ei d
t r t n S e so S
rc y
ie e
FS n
-
ro OD F
.
d g
o88S a
,
oL de droce
,
R f
u o88O o tn l
e
.
croF n
i
<
ro e88. r.r u,
E
.
- erug i
F
{
W o
o88" s
dn l
u
}
o l
P
'
o88"
,
d I
o8d# o
a
'
'l~
L
~
j
.
2
0
2
O
-
-
-
N
,t Me n
Rss re oi oc r y rr sL re au
}EP wJ
.' ) >
,
,!
!
m N
'%
.
rt (