IR 05000528/2019004
| ML20031F817 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/29/2020 |
| From: | John Dixon NRC/RGN-IV/DRP |
| To: | Lacal M Arizona Public Service Co |
| References | |
| IR 2019004 | |
| Download: ML20031F817 (18) | |
Text
January 29, 2020
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
INTEGRATED INSPECTION REPORT 05000528/2019004, AND 05000529/2019004 AND 05000530/2019004
Dear Ms. Lacal:
On December 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Units 1, 2, and 3 and discussed the results of this inspection with Ms. M. Lacal, Executive Vice President / Chief Nuclear Officer, and other members of your staff.
The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects
Docket Nos. 05000528, 05000529 and 05000530 License Nos. NPF-41, NPF-51, and NPF-74
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000528, 05000529, and 05000530
License Numbers:
Report Numbers:
05000528/2019004, 05000529/2019004, and 05000530/2019004
Enterprise Identifier: I-2019-004-0013
Licensee:
Arizona Public Service Company
Facility:
Palo Verde Nuclear Generating Station, Units 1, 2, and 3
Location:
Phoenix, AZ 85072-2034
Inspection Dates:
October 1, 2019, to December 31, 2019
Inspectors:
R. Bywater, Senior Project Engineer
J. Drake, Senior Reactor Inspector
S. Hedger, Emergency Preparedness Inspector
J. Kirkland, Senior Operations Engineer
C. Peabody, Senior Resident Inspector
D. You, Resident Inspector
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000530/2018-001-01 LER 2018-001-01 for Palo Verde, Unit 3, Reactor Trip on Low Steam Generator Level.
71153 Closed LER 05000528/2019-001-00 LER 2019-001-00 for Palo Verde Nuclear Generating Station (PVNGS) Unit 1,
Emergency Core Cooling System Valve Leakage Resulting in an Unanalyzed Condition.
71153 Closed
PLANT STATUS
Unit 1 operated at or near full power for the duration of the inspection period.
Unit 2 entered the inspection period at full power. Unit 2 reduced power to 40 percent to address elevated sodium levels in the main condenser from October 18-20, 2019. Unit 2 reduced power to 80 percent to address an issue with a malfunctioning heater drain loop on October 21-22, 2019. Unit 2 continued operating at or near full power for the remainder of the inspection period.
Unit 3 entered the inspection period at full power. Unit 3 was shut down for a planned refueling outage on October 4, 2019. Unit 3 restarted on November 19, 2019, and remained at or near full power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04Q - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 3 spent fuel pool cooling system augmented with containment spray pump A on October 16, 2019
- (2) Unit 1 diesel generator A on October 30, 2019
- (3) Unit 2 diesel generator B on October 30, 2019
71111.04S - Equipment Alignment
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 containment spray system B on October 24, 2019
71111.05A - Fire Protection (Annual)
Annual Inspection (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated fire brigade performance on December 2, 2019
71111.05Q - Fire Protection
Quarterly Inspection (IP Section 03.01) (4 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Unit 3 high pressure safety injection pump room B on October 17, 2019
- (2) Unit 3 containment hotwork on fire protection valve FP-141 on October 17, 2019
- (3) Unit 1 and Unit 2 condensate storage tank areas on October 23, 2019
- (4) Unit 2 diesel generator room A on October 30, 2019
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Unit 3 essential cooling water pump room A on December 16, 2019
71111.07A - Heat Sink Performance
Annual Review (IP Section 02.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) Unit 3 essential cooling water heat exchanger B performance on October 17, 2019
===71111.08P - Inservice Inspection Activities (PWR)
PWR Inservice Inspection Activities Sample (IP Section 03.01)===
- (1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation, and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from October 14-18, 2019:
03.01.a - Nondestructive Examination and Welding Activities
- Ultrasonic examination, High Pressure Safety Injection B, FW 40-13 elbow to pipe
- Ultrasonic examination, High Pressure Safety Injection B, FW 40-14 pipe to elbow
- Ultrasonic examination, charging, FW 37-41 elbow to pipe
- Dye penetrant examination, High Pressure Safety Injection B, SI-199-H01
- Visual examination, High Pressure Safety Injection B, SI-199-H-017
- Visual examination, High Pressure Safety Injection B, SI-199-H-018
- Weld repair package for 3PSIAV836**VALVEX
- No Section XI welding occurred while the inspectors were onsite. The inspectors observed tungsten inert gas welding associated with the low pressure feedwater heater replacement.
03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities
- The inspectors reviewed the following reactor head penetration visual examinations: Penetrations 01 to 61
03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities
- The inspectors reviewed the following documents associated with boric acid leaks and evaluations: 2PSIBV852, 3JCHNLE0295, 3JLRNHV0271, 3JSIAHV0306, 3JSIBUV0646, 3MPCAP01, 3MPCNY03, 3PCHEVX12, 3PCHNV813, 3PCHNVM74, 3PCHNVX39, 3PPCNV036, 3PSIBV090, 3PSIBV091, 3PSIBV418, 3PSIEL257, 3PSIEV947, 3PSSNV106
03.01.e - Problem Identification and Resolution
- The inspectors reviewed 26 condition reports associated with inservice and operating experience issues and concluded that NDE/ISI related issues and operating experience are put into the corrective action program at low levels to ensure conditions and problems are identified.
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exams completed on September 27, 2019
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated Unit 3 operators conducting a controlled shutdown and cooldown for a refueling outage on October 4-5, 2019
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated operators conducting a reactor startup and main feed pump startup in the simulator on November 6, 2019
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Reliability of the station blackout generators on October 22, 2019
- (2) Condenser sodium intrusion events cumulative impact on unplanned power changes plant level monitoring criteria on November 5, 2019
Quality Control (IP Section 02.02) (1 Sample)
The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:
- (1) Commercial grade dedication testing of electrical lugs on November 14, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 3 shutdown risk during emergent condition involving pinhole leak at safety injection vent valve V836 weld on October 11, 2019
- (2) Unit 3 shutdown risk assessment during refueling outage on October 24, 2019
- (3) Unit 3 shutdown risk during reduced RCS inventory for safety injection tank check valve seal replacement on November 15, 2019
- (4) Unit 2 weekly risk assessment for the week of December 12, 2019, including emergent maintenance to replace a core element assembly calculator and a turbine control oil pump on December 19, 2019
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 02.02) (6 Samples)
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Environmental qualification requirements of radiation monitors RU-31, RU-145, and RU-146 in the Unit 1, 2, and 3 fuel buildings on October 22, 2019
- (2) Evaluation of unused motor driven auxiliary feedwater pump motor support footing dowel pins on November 4, 2019
- (3) Commercial grade dedication for terminal blocks does not meet harsh environment applications on November 6, 2019
- (4) Unit 1 and 3 diesel generator starting air solenoid valves on November 20, 2019
- (5) Evaluation of Unit 3 spray pond pump A flow instrumentation on November 20, 2019
- (6) Evaluation of failed megger of Unit 3 heated junction thermocouples on November 22, 2019
71111.18 - Plant Modifications
Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)
- (1) Revision to severe accident mitigation guidelines on November 13, 2019
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the following post maintenance tests:
(1)73ST-9SI15, containment spray pumps comprehensive pump test after replacement of the Unit 3 containment spray pump B impeller on October 23, 2019 (2)73ST-9AF05, auxiliary feedwater pump B post maintenance test following motor replacement on October 30, 2019 (3)40ST-9GT04, station blackout generator 1 post maintenance test following cleaning, inspections, and air filter changeout on November 1, 2019 (4)73ST-9AF01, auxiliary feedwater pump N post maintenance test following motor replacement on November 4, 2019 (5)77ST-9SB22, control element assembly drop time testing after coil stack replacements on November 19, 2019
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated refueling outage 3R21 activities from October 4 to November 19, 2019
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) Unit 1 essential cooling water pump A comprehensive test on October 31, 2019
- (2) Unit 3 trisodium phosphate basket surveillance test on October 31, 2019
FLEX Testing (IP Section 03.02) (1 Sample)
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The licensee submitted PVNGS Emergency Plan, Revision 64, to the NRC on September 3, 2019. The inspectors conducted an in-office review of the changes from December 13-19, 2019. This evaluation does not constitute NRC approval.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===
- (1) Unit 1 (July 1, 2018, to September 30, 2019)
- (2) Unit 2 (July 1, 2018, to September 30, 2019)
- (3) Unit 3 (July 1, 2018, to September 30, 2019)
BI02: RCS Leak Rate Sample (IP Section 02.11) (3 Samples)
- (1) Unit 1 (July 1, 2018, to September 30, 2019)
- (2) Unit 2 (July 1, 2018, to September 30, 2019)
- (3) Unit 3 (July 1, 2018, to September 30, 2019)
71152 - Problem Identification and Resolution
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the reliability of station blackout generator 1 that might be indicative of a more significant safety issue.
71153 - Follow-up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)
The inspectors evaluated the following licensee event reports (LERs):
- (1) Licensee Event Report 05000530/2018-001-01, Unit 3 reactor trip on low steam generator level on October 3, 2019, (ADAMS Accession No. ML18355A809). The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency nor violation of NRC requirements was identified.
- (2) Licensee Event Report 05000528/2019-001-00, Unit 1 emergency core cooling system valve leakage resulting in an unanalyzed condition on November 27, 2019, (ADAMS Accession No. ML19150A323). The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency nor violation of NRC requirements was identified.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 18, 2019, the inspectors presented the Inservice Inspection for Unit 3 inspection results to Mr. J. Cadogan, Senior Vice President, and other members of the licensee staff.
- On December 18, 2019, the inspectors presented the Emergency Plan In-Office Review Results inspection results to Ms. C. Shields, Manager, Emergency Preparedness, and other members of the licensee staff.
- On January 9, 2020, the inspectors presented the integrated inspection results to Ms. M. Lacal, Executive Vice President / Chief Nuclear Officer, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.04Q Corrective Action
Documents
Condition Reports 19-16243, 19-16362
Drawings
1-M-DGP-001
Diesel Generator System, Sheet 1
1-M-DGP-001
Sheet 3
Lube Oil Diesel Generator System
1-M-DGP-001,
Sheet 5
Cooling Water Diesel Generator System
1-M-DGP-001,
Sheet 6
Starting Air Diesel Generator System
2-M-SIP-001
Safety Injection and Shutdown Cooling System
2-M-SIP-002
Safety Injection and Shutdown Cooling System
3-M-PCP-001
Fuel Pool Cooling and Cleanup System
3-M-SIP-001
Safety Injection and Shutdown Cooling System
Procedures
Fuel Pool Cooling
Train B LPSI and CS System Alignment Verification
71111.05Q Miscellaneous
Pre-Fire Strategies Manual
NPL39-01.003B
Unit 2 Fire Drill Package
2/02/2019
Procedures
Firewatch Requirements
Hot Work Permit
Work Orders
5181785, 5178219, 5177917, 5103632
Miscellaneous
13-MC-ZA-0809
As Built Auxiliary Building Flooding Calculation
13-NS-C096
Internal Flooding PRA - Characterization of Flood Scenarios
C2
Design Basis Manual: Hazards Topical
Procedures
Heat Exchanger Program
Heat Exchanger Visual Inspection
Work Orders
27401, 5027758
Corrective Action
Documents
Condition Reports 19-11555, 19-06633, 19-12727, 19-10498, 19-05434, 17-
16139, 19-10558, 19-07804, 19-05326, 19-05815, 19-
06472, 19-06401, 19-06089, 19-04391, 19-12475, 18-
15929, 19-05981, 19-06434, 19-14837, 19-05900, 19-
05322, 19-05606, 19-05706, 19-06468, 19-04837, 19-
08623, 19-08777, 19-06671, 19-09387, 19-09766, 19-
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
00881, 19-00882
Corrective Action
Documents
Resulting from
Inspection
Condition Reports 19-15195, 19-15291, 19-15585
Miscellaneous
Requirements for the Reactor Pressure Vessel Head
Nozzles to Perform a Bare Metal Examination per ASME
2/16/2018
Inservice Inspection Program Basis Manual, Palo Verde
Nuclear Generating Station Units 1, 2 and 3
Inservice Inspection Program Basis Manual, Palo Verde
Nuclear Generating Station Units 1, 2 and 3
Inservice Inspection Program Basis Manual, Palo Verde
Nuclear Generating Station Units 1, 2 and 3
Procedures
Control of Transient Combustibles
Boric Acid Walkdown Leak Detection
21, 22
Welding and Brazing Control
Weld Filler Material Control
10, 11
ASME Section XI Inservice Inspection
Boric Acid Corrosion Control Program
Bare Metal Visual Examinations of Bottom Mounted
Instrument Nozzles
Liquid Penetrant Examination
Ultrasonic Examination of Welds in Ferritic Components
Visual Examination of Welds, Bolting, and Components
Visual Examination of Welds, Bolting, and Components
Visual Examination of Component Supports
Visual Examination for Leakage
MN756-A00001
(PDI-UT-
1_Rev_G)
PDI Generic Procedure for the Ultrasonic Examination of
Ferritic Pipe Welds
MN756-A00002
(PDI-UT-
2_Rev_H)
PDI Generic Procedure for the Ultrasonic Examination of
Austenitic Pipe Welds
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
MN756-A00004
(PDI-UT-8_Rev
H)
PDI Generic Procedure for the Ultrasonic Examination of
Weld Overlaid Similar and Dissimilar Metal Welds
Materials Reliability Program: Boric Acid Corrosion
Guidebook: Managing Boric Acid Corrosion Issues at PWR
Power Stations
71111.11Q Procedures
Feedwater Pump Turbine B
Initial Reactor Startup Following Refuelings
Plant Startup Mode 2 to Mode 1
Outage GOP
Corrective Action
Documents
Condition Reports 19-03648, 19-04352, 19-17054, 19-16600, 19-15694, 19-
16301, 19-16280, 19-15696, 19-13049, 19-12995, 19-
2761, 19-12694, 19-10375, 19-08371, 19-03934, 19-
03190, 19-02822, 19-02173, 19-01044, 19-00736, 19-
00690, 19-00558, 18-20227, 18-18161, 18-13224, 18-
10665, 18-10142, 18-0982, 18-03789, 18-03405, 18-01090,
18-00913, 18-00470, 17-18016, 17-17783, 17-17725, 17-
17690, 17-17540, 17-17538, 17-16824, 17-16077, 17-
15433, 17-13557, 17-11815, 17-10023, 17-09081, 17-
08542, 17-02933, 17-01713, 17-00670, 17-00543, 17-
00311, 17-00242
Miscellaneous
00149227
Inspection Plan
05/15/2019
ENG WO 19-
04352-002
Engineering Evaluation
05/15/2019
PCP 5123338
Commercial Grade Item Dedication Technical Evaluation
04/21/2019
PCP 5134650
Commercial Grade Item Dedication Technical Evaluation
05/21/2019
QRC 1751-19
Commercial Grade Dedication Test/Inspection Results C02:
Conductivity
11/14/2019
TD1820991
Material Logistic Information System Quality Receiving
Checklist
11/14/2019
Procedures
Receipt Inspection
Station Blackout Generator Test Record
Commercial Grade Dedication (CGD) Process
Corrective Action
Condition Reports 19-14837, 19-14917
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Miscellaneous
Shutdown Safety Function Assessment Reactor Vessel
10/11/2019
Shutdown Safety Function Assessment RSC At/Below RV
11/15/2019
Equipment Protection Scheme
10/23/2019
Shutdown Safety Function Assessment Core Off-loaded,
Refuel Pool Isolated from Spent Fuel Pool
10/23/2019
Unit 2 Operations Weekly Schedule December 9-15, 2019
2/08/2019
EOOS 4.1
Weekly Risk
Profile
Shutdown Safety Function Assessment Core Off-loaded,
Refuel Pool Isolated from Spent Fuel Pool
Schedulers Evaluation for Palo Verde Unit 2 December 9-
15, 2019
2/06/2019
Procedures
Online Integrated Risk
Operations Department Online Nuclear Risk Management
Modes 1 and 2
Shutdown Risk Assessments
Assessment and Management of Risk when Performing
Maintenance in Modes 1 and 2
Corrective Action
Documents
Condition Reports 19-09926, 19-10645, 19-10970, 19-15257, 19-16155, 19-
16362, 19-16479, 19-15987, 17-17285, 17-14436, 19-16854
Drawings
01-M-DGP-001,
Sheet 6
Starting Air Diesel Generator System
03-M-SPP-001
Essential Spray Pond System
Miscellaneous
Updated Final Safety Analysis Report
PVNGS Units 1, 2 & 3 EQ Program Manual
13-J-ZZS-092
Instrument and Controls General Installation Notes
13-MC-HF-901
Fuel Building Transient Analysis
13-MC-HF-901
Fuel Building Transient Analysis
2016-00852
Engineering Document Change
2/12/2016
2019-0480
Engineering Document Change
07/24/2019
EEQ-1TBL-002
Instrument and Control Terminal Blocks
S-19-0004
10CFR50.59 Screening/Evaluation
05/17/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Installation and Removal of Heated Junction Thermocouple
Assemblies
Procedures
Severe Accident Mitigation Guidelines - withheld per 10 CFR 2.390
Corrective Action
Documents
Condition Reports 19-16301, 19-16280, 19-16051, 19-16173, 19-16252, 19-
16049
Miscellaneous
Printout of Unit 3 Auxiliary Feedwater N Vibration Data
10/30/2019
19-16051-002
Engineering Evaluation
10/30/2019
Procedures
Station Blackout Generator 1 Quarterly Test
Auxiliary Feedwater N - Inservice Test
Containment Spray Pumps - Comprehensive Pump Test
CEA Drop Time Test
Work Orders
5033500, 5046834, 5027794
Corrective Action
Documents
Condition Reports 19-16938
Miscellaneous
Palo Verde: Pre-Outage Status Meeting Package
09/19/2019
Unit 3 21st Refueling Outage Shutdown Risk Assessment
Team Review Report
19-011
PRB Meeting Agenda - U3R21 Refueling Outage Restart
11/12/2019
Procedures
Reactivity Management Program
Pressurizer Manway Removal and Installation
Conduct of Operations
Initial Reactor Startup Following Refuelings
Plant Startup Mode 2 to Mode 1
RCS Drain Operations
Outage GOP
Containment Cleanliness Inspection
Drawings
1-M-ECP-001
Essential Chilled Water System
1-M-EWP-001
Essential Cooling Water System
Procedures
FLEX SG/RCS Pump Inspection and Testing
Essential Cooling Water Pumps - Comprehensive Pump
Test
ECCS Trisodium Phosphate Surveillance Test
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Evaluation 19-
11093-01
Inadvertent Administrative Errors introduced into EPlan
Basis
61-62,
07/31/2019
Miscellaneous
2-07135-
MLL/TNW/DCE
Palo Verde Nuclear Generating Station (PVNGS); Units 1, 2,
and 3 and Independent Spent Fuel Storage Installation;
Docket Nos. 50-528, 50-529, 50-530 and 72-44; License
Nos. NPF-41, NPF-51, NPF-52 and NPF-74; Request for
NRC Approval of Proposed Changes to PVNGS Emergency
Action Levels
10/9/2015
2-07255-
MLL/JF/DCE
Palo Verde Nuclear Generating Station; Units 1, 2, and 3
and Independent Spent Fuel Storage Installation; Docket
Nos. STN 50-528, 50-529, 50-530, and 72-44; Renewed
Operating License Nos. NPF-41, NPF-51, NPF-74;
Response to Request for Additional Information Regarding
Proposed Changes to PVNGS Emergency Action Levels
05/12/2016
2-07975-
CS/MA
Palo Verde Nuclear Generating Station (PVNGS); Units 1, 2,
and 3 and Independent Spent Fuel Storage Installation;
Docket Nos. 50-528, 50-529, 50-530 and 72-44; License
Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency
Plan
64,
08/30/2019
Evaluation
Tracking Number
2019-001e
64,
06/21/2019
Screening
Tracking Number
2019-007s
64,
06/20/2019
Procedures
EPP-0901
Classifications
10, 12
71151
Miscellaneous
Palo Verde PI Data Excel Files
Procedures
Dose Equivalent Xe-133 and Dose Equivalent I-131
Determination
Reactor Coolant System Specific Activity Surveillance Test
Corrective Action
Documents
Condition Reports 16-16924, 16-18661, 17-00543, 17-08542, 17-17725, 18-
00913, 18-18161, 19-00690, 19-08371, 19-126924, 19-
13049, 19-15694, 19-15696, 19-16600, 19-00736, 19-
2761, 19-12694, 19-08371, 18-01090, 18-00913, 17-
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
17725, 17-16824, 17-16077, 17-00543
Miscellaneous
19-08371-009
MRFF Evaluation
2/05/2019
Procedures
Station Blackout Generator Test Record
Maintenance Rule
Corrective Action
Documents
Condition Reports 19-04626
Miscellaneous
19-04626-006
Level 2 Cause Analysis Report: Leakage from Unit 1 HPSI
Drain Valve SIA-V811
0