IR 05000528/2019004

From kanterella
(Redirected from IR 05000529/2019004)
Jump to navigation Jump to search
Integrated Inspection Report 05000528/2019004, and 05000529/2019004 and 05000530/2019004
ML20031F817
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/29/2020
From: John Dixon
NRC/RGN-IV/DRP
To: Lacal M
Arizona Public Service Co
References
IR 2019004
Download: ML20031F817 (18)


Text

January 29, 2020

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

INTEGRATED INSPECTION REPORT 05000528/2019004, AND 05000529/2019004 AND 05000530/2019004

Dear Ms. Lacal:

On December 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Units 1, 2, and 3 and discussed the results of this inspection with Ms. M. Lacal, Executive Vice President / Chief Nuclear Officer, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects

Docket Nos. 05000528, 05000529 and 05000530 License Nos. NPF-41, NPF-51, and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529, and 05000530

License Numbers:

NPF-41, NPF-51, and NPF-74

Report Numbers:

05000528/2019004, 05000529/2019004, and 05000530/2019004

Enterprise Identifier: I-2019-004-0013

Licensee:

Arizona Public Service Company

Facility:

Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Location:

Phoenix, AZ 85072-2034

Inspection Dates:

October 1, 2019, to December 31, 2019

Inspectors:

R. Bywater, Senior Project Engineer

J. Drake, Senior Reactor Inspector

S. Hedger, Emergency Preparedness Inspector

J. Kirkland, Senior Operations Engineer

C. Peabody, Senior Resident Inspector

D. You, Resident Inspector

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000530/2018-001-01 LER 2018-001-01 for Palo Verde, Unit 3, Reactor Trip on Low Steam Generator Level.

71153 Closed LER 05000528/2019-001-00 LER 2019-001-00 for Palo Verde Nuclear Generating Station (PVNGS) Unit 1,

Emergency Core Cooling System Valve Leakage Resulting in an Unanalyzed Condition.

71153 Closed

PLANT STATUS

Unit 1 operated at or near full power for the duration of the inspection period.

Unit 2 entered the inspection period at full power. Unit 2 reduced power to 40 percent to address elevated sodium levels in the main condenser from October 18-20, 2019. Unit 2 reduced power to 80 percent to address an issue with a malfunctioning heater drain loop on October 21-22, 2019. Unit 2 continued operating at or near full power for the remainder of the inspection period.

Unit 3 entered the inspection period at full power. Unit 3 was shut down for a planned refueling outage on October 4, 2019. Unit 3 restarted on November 19, 2019, and remained at or near full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 3 spent fuel pool cooling system augmented with containment spray pump A on October 16, 2019
(2) Unit 1 diesel generator A on October 30, 2019
(3) Unit 2 diesel generator B on October 30, 2019

71111.04S - Equipment Alignment

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 containment spray system B on October 24, 2019

71111.05A - Fire Protection (Annual)

Annual Inspection (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated fire brigade performance on December 2, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 3 high pressure safety injection pump room B on October 17, 2019
(2) Unit 3 containment hotwork on fire protection valve FP-141 on October 17, 2019
(3) Unit 1 and Unit 2 condensate storage tank areas on October 23, 2019
(4) Unit 2 diesel generator room A on October 30, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Unit 3 essential cooling water pump room A on December 16, 2019

71111.07A - Heat Sink Performance

Annual Review (IP Section 02.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Unit 3 essential cooling water heat exchanger B performance on October 17, 2019

===71111.08P - Inservice Inspection Activities (PWR)

PWR Inservice Inspection Activities Sample (IP Section 03.01)===

(1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation, and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from October 14-18, 2019:

03.01.a - Nondestructive Examination and Welding Activities

  • Ultrasonic examination, High Pressure Safety Injection B, FW 40-13 elbow to pipe
  • Ultrasonic examination, High Pressure Safety Injection B, FW 40-14 pipe to elbow
  • Ultrasonic examination, charging, FW 37-41 elbow to pipe
  • Dye penetrant examination, High Pressure Safety Injection B, SI-199-H01
  • Visual examination, High Pressure Safety Injection B, SI-199-H-017
  • Visual examination, High Pressure Safety Injection B, SI-199-H-018
  • Weld repair package for 3PSIAV836**VALVEX
  • No Section XI welding occurred while the inspectors were onsite. The inspectors observed tungsten inert gas welding associated with the low pressure feedwater heater replacement.

03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities

03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities

  • The inspectors reviewed the following documents associated with boric acid leaks and evaluations: 2PSIBV852, 3JCHNLE0295, 3JLRNHV0271, 3JSIAHV0306, 3JSIBUV0646, 3MPCAP01, 3MPCNY03, 3PCHEVX12, 3PCHNV813, 3PCHNVM74, 3PCHNVX39, 3PPCNV036, 3PSIBV090, 3PSIBV091, 3PSIBV418, 3PSIEL257, 3PSIEV947, 3PSSNV106

03.01.e - Problem Identification and Resolution

  • The inspectors reviewed 26 condition reports associated with inservice and operating experience issues and concluded that NDE/ISI related issues and operating experience are put into the corrective action program at low levels to ensure conditions and problems are identified.

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exams completed on September 27, 2019

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated Unit 3 operators conducting a controlled shutdown and cooldown for a refueling outage on October 4-5, 2019

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operators conducting a reactor startup and main feed pump startup in the simulator on November 6, 2019

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Reliability of the station blackout generators on October 22, 2019
(2) Condenser sodium intrusion events cumulative impact on unplanned power changes plant level monitoring criteria on November 5, 2019

Quality Control (IP Section 02.02) (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:

(1) Commercial grade dedication testing of electrical lugs on November 14, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 3 shutdown risk during emergent condition involving pinhole leak at safety injection vent valve V836 weld on October 11, 2019
(2) Unit 3 shutdown risk assessment during refueling outage on October 24, 2019
(3) Unit 3 shutdown risk during reduced RCS inventory for safety injection tank check valve seal replacement on November 15, 2019
(4) Unit 2 weekly risk assessment for the week of December 12, 2019, including emergent maintenance to replace a core element assembly calculator and a turbine control oil pump on December 19, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (6 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Environmental qualification requirements of radiation monitors RU-31, RU-145, and RU-146 in the Unit 1, 2, and 3 fuel buildings on October 22, 2019
(2) Evaluation of unused motor driven auxiliary feedwater pump motor support footing dowel pins on November 4, 2019
(3) Commercial grade dedication for terminal blocks does not meet harsh environment applications on November 6, 2019
(4) Unit 1 and 3 diesel generator starting air solenoid valves on November 20, 2019
(5) Evaluation of Unit 3 spray pond pump A flow instrumentation on November 20, 2019
(6) Evaluation of failed megger of Unit 3 heated junction thermocouples on November 22, 2019

71111.18 - Plant Modifications

Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)

(1) Revision to severe accident mitigation guidelines on November 13, 2019

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post maintenance tests:

(1)73ST-9SI15, containment spray pumps comprehensive pump test after replacement of the Unit 3 containment spray pump B impeller on October 23, 2019 (2)73ST-9AF05, auxiliary feedwater pump B post maintenance test following motor replacement on October 30, 2019 (3)40ST-9GT04, station blackout generator 1 post maintenance test following cleaning, inspections, and air filter changeout on November 1, 2019 (4)73ST-9AF01, auxiliary feedwater pump N post maintenance test following motor replacement on November 4, 2019 (5)77ST-9SB22, control element assembly drop time testing after coil stack replacements on November 19, 2019

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated refueling outage 3R21 activities from October 4 to November 19, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Unit 1 essential cooling water pump A comprehensive test on October 31, 2019
(2) Unit 3 trisodium phosphate basket surveillance test on October 31, 2019

FLEX Testing (IP Section 03.02) (1 Sample)

(1) FLEX RCS makeup pump functional test on November 19, 2019

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The licensee submitted PVNGS Emergency Plan, Revision 64, to the NRC on September 3, 2019. The inspectors conducted an in-office review of the changes from December 13-19, 2019. This evaluation does not constitute NRC approval.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===

(1) Unit 1 (July 1, 2018, to September 30, 2019)
(2) Unit 2 (July 1, 2018, to September 30, 2019)
(3) Unit 3 (July 1, 2018, to September 30, 2019)

BI02: RCS Leak Rate Sample (IP Section 02.11) (3 Samples)

(1) Unit 1 (July 1, 2018, to September 30, 2019)
(2) Unit 2 (July 1, 2018, to September 30, 2019)
(3) Unit 3 (July 1, 2018, to September 30, 2019)

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the reliability of station blackout generator 1 that might be indicative of a more significant safety issue.

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensee event reports (LERs):

(1) Licensee Event Report 05000530/2018-001-01, Unit 3 reactor trip on low steam generator level on October 3, 2019, (ADAMS Accession No. ML18355A809). The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency nor violation of NRC requirements was identified.
(2) Licensee Event Report 05000528/2019-001-00, Unit 1 emergency core cooling system valve leakage resulting in an unanalyzed condition on November 27, 2019, (ADAMS Accession No. ML19150A323). The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency nor violation of NRC requirements was identified.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 18, 2019, the inspectors presented the Inservice Inspection for Unit 3 inspection results to Mr. J. Cadogan, Senior Vice President, and other members of the licensee staff.
  • On December 18, 2019, the inspectors presented the Emergency Plan In-Office Review Results inspection results to Ms. C. Shields, Manager, Emergency Preparedness, and other members of the licensee staff.
  • On January 9, 2020, the inspectors presented the integrated inspection results to Ms. M. Lacal, Executive Vice President / Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04Q Corrective Action

Documents

Condition Reports 19-16243, 19-16362

Drawings

1-M-DGP-001

Diesel Generator System, Sheet 1

1-M-DGP-001

Sheet 3

Lube Oil Diesel Generator System

1-M-DGP-001,

Sheet 5

Cooling Water Diesel Generator System

1-M-DGP-001,

Sheet 6

Starting Air Diesel Generator System

2-M-SIP-001

Safety Injection and Shutdown Cooling System

2-M-SIP-002

Safety Injection and Shutdown Cooling System

3-M-PCP-001

Fuel Pool Cooling and Cleanup System

3-M-SIP-001

Safety Injection and Shutdown Cooling System

Procedures

40OP-9PC01

Fuel Pool Cooling

40ST-9SI14

Train B LPSI and CS System Alignment Verification

71111.05Q Miscellaneous

Pre-Fire Strategies Manual

NPL39-01.003B

Unit 2 Fire Drill Package

2/02/2019

Procedures

14DP-0FP01

Firewatch Requirements

14DP-0FP36

Hot Work Permit

Work Orders

5181785, 5178219, 5177917, 5103632

71111.06

Miscellaneous

13-MC-ZA-0809

As Built Auxiliary Building Flooding Calculation

13-NS-C096

Internal Flooding PRA - Characterization of Flood Scenarios

C2

Design Basis Manual: Hazards Topical

71111.07A

Procedures

73DP-9ZZ11

Heat Exchanger Program

73DP-9ZZ21

Heat Exchanger Visual Inspection

Work Orders

27401, 5027758

71111.08P

Corrective Action

Documents

Condition Reports 19-11555, 19-06633, 19-12727, 19-10498, 19-05434, 17-

16139, 19-10558, 19-07804, 19-05326, 19-05815, 19-

06472, 19-06401, 19-06089, 19-04391, 19-12475, 18-

15929, 19-05981, 19-06434, 19-14837, 19-05900, 19-

05322, 19-05606, 19-05706, 19-06468, 19-04837, 19-

08623, 19-08777, 19-06671, 19-09387, 19-09766, 19-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

00881, 19-00882

Corrective Action

Documents

Resulting from

Inspection

Condition Reports 19-15195, 19-15291, 19-15585

Miscellaneous

Requirements for the Reactor Pressure Vessel Head

Nozzles to Perform a Bare Metal Examination per ASME

Code Case N-729-4

2/16/2018

2INT-ISI-13

Inservice Inspection Program Basis Manual, Palo Verde

Nuclear Generating Station Units 1, 2 and 3

3INT-ISI-13

Inservice Inspection Program Basis Manual, Palo Verde

Nuclear Generating Station Units 1, 2 and 3

4INT-ISI-13

Inservice Inspection Program Basis Manual, Palo Verde

Nuclear Generating Station Units 1, 2 and 3

Procedures

14DP-0FP33

Control of Transient Combustibles

70TI-9ZC01

Boric Acid Walkdown Leak Detection

21, 22

73DP-9WP04

Welding and Brazing Control

73DP-9WP05

Weld Filler Material Control

10, 11

73DP-9XI03

ASME Section XI Inservice Inspection

73DP-9ZC01

Boric Acid Corrosion Control Program

73TI-9RC10

Bare Metal Visual Examinations of Bottom Mounted

Instrument Nozzles

73TI-9ZZ07

Liquid Penetrant Examination

73TI-9ZZ10

Ultrasonic Examination of Welds in Ferritic Components

73TI-9ZZ17

Visual Examination of Welds, Bolting, and Components

73TI-9ZZ17

Visual Examination of Welds, Bolting, and Components

73TI-9ZZ18

Visual Examination of Component Supports

73TI-9ZZ22

Visual Examination for Leakage

MN756-A00001

(PDI-UT-

1_Rev_G)

PDI Generic Procedure for the Ultrasonic Examination of

Ferritic Pipe Welds

MN756-A00002

(PDI-UT-

2_Rev_H)

PDI Generic Procedure for the Ultrasonic Examination of

Austenitic Pipe Welds

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MN756-A00004

(PDI-UT-8_Rev

H)

PDI Generic Procedure for the Ultrasonic Examination of

Weld Overlaid Similar and Dissimilar Metal Welds

MRP-058

Materials Reliability Program: Boric Acid Corrosion

Guidebook: Managing Boric Acid Corrosion Issues at PWR

Power Stations

71111.11Q Procedures

40OP-9FT02

Feedwater Pump Turbine B

40OP-9ZZ02

Initial Reactor Startup Following Refuelings

40OP-9ZZ04

Plant Startup Mode 2 to Mode 1

40OP-9ZZ23

Outage GOP

71111.12

Corrective Action

Documents

Condition Reports 19-03648, 19-04352, 19-17054, 19-16600, 19-15694, 19-

16301, 19-16280, 19-15696, 19-13049, 19-12995, 19-

2761, 19-12694, 19-10375, 19-08371, 19-03934, 19-

03190, 19-02822, 19-02173, 19-01044, 19-00736, 19-

00690, 19-00558, 18-20227, 18-18161, 18-13224, 18-

10665, 18-10142, 18-0982, 18-03789, 18-03405, 18-01090,

18-00913, 18-00470, 17-18016, 17-17783, 17-17725, 17-

17690, 17-17540, 17-17538, 17-16824, 17-16077, 17-

15433, 17-13557, 17-11815, 17-10023, 17-09081, 17-

08542, 17-02933, 17-01713, 17-00670, 17-00543, 17-

00311, 17-00242

Miscellaneous

00149227

Inspection Plan

05/15/2019

ENG WO 19-

04352-002

Engineering Evaluation

05/15/2019

PCP 5123338

Commercial Grade Item Dedication Technical Evaluation

04/21/2019

PCP 5134650

Commercial Grade Item Dedication Technical Evaluation

05/21/2019

QRC 1751-19

Commercial Grade Dedication Test/Inspection Results C02:

Conductivity

11/14/2019

TD1820991

Material Logistic Information System Quality Receiving

Checklist

11/14/2019

Procedures

2DP-0MC46

Receipt Inspection

40DP-9GT01

Station Blackout Generator Test Record

87DP-0MC39

Commercial Grade Dedication (CGD) Process

71111.13

Corrective Action

Condition Reports 19-14837, 19-14917

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Miscellaneous

Shutdown Safety Function Assessment Reactor Vessel

Head Off, RCS Above RV Flange

10/11/2019

Shutdown Safety Function Assessment RSC At/Below RV

Flange

11/15/2019

Equipment Protection Scheme

10/23/2019

Shutdown Safety Function Assessment Core Off-loaded,

Refuel Pool Isolated from Spent Fuel Pool

10/23/2019

Unit 2 Operations Weekly Schedule December 9-15, 2019

2/08/2019

EOOS 4.1

Weekly Risk

Profile

Shutdown Safety Function Assessment Core Off-loaded,

Refuel Pool Isolated from Spent Fuel Pool

Schedulers Evaluation for Palo Verde Unit 2 December 9-

15, 2019

2/06/2019

Procedures

2DP-0RS01

Online Integrated Risk

40DP-9RS01

Operations Department Online Nuclear Risk Management

Modes 1 and 2

70DP-0RA01

Shutdown Risk Assessments

70DP-0RA05

Assessment and Management of Risk when Performing

Maintenance in Modes 1 and 2

71111.15

Corrective Action

Documents

Condition Reports 19-09926, 19-10645, 19-10970, 19-15257, 19-16155, 19-

16362, 19-16479, 19-15987, 17-17285, 17-14436, 19-16854

Drawings

01-M-DGP-001,

Sheet 6

Starting Air Diesel Generator System

03-M-SPP-001

Essential Spray Pond System

Miscellaneous

Updated Final Safety Analysis Report

PVNGS Units 1, 2 & 3 EQ Program Manual

13-J-ZZS-092

Instrument and Controls General Installation Notes

13-MC-HF-901

Fuel Building Transient Analysis

13-MC-HF-901

Fuel Building Transient Analysis

2016-00852

Engineering Document Change

2/12/2016

2019-0480

Engineering Document Change

07/24/2019

EEQ-1TBL-002

Instrument and Control Terminal Blocks

S-19-0004

10CFR50.59 Screening/Evaluation

05/17/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

36MT-9RI10

Installation and Removal of Heated Junction Thermocouple

Assemblies

71111.18

Procedures

Severe Accident Mitigation Guidelines - withheld per 10 CFR 2.390

71111.19

Corrective Action

Documents

Condition Reports 19-16301, 19-16280, 19-16051, 19-16173, 19-16252, 19-

16049

Miscellaneous

Printout of Unit 3 Auxiliary Feedwater N Vibration Data

10/30/2019

19-16051-002

Engineering Evaluation

10/30/2019

Procedures

40ST-9GT04

Station Blackout Generator 1 Quarterly Test

73ST-9AF01

Auxiliary Feedwater N - Inservice Test

73ST-9SI15

Containment Spray Pumps - Comprehensive Pump Test

77ST-9SB22

CEA Drop Time Test

Work Orders

5033500, 5046834, 5027794

71111.20

Corrective Action

Documents

Condition Reports 19-16938

Miscellaneous

Palo Verde: Pre-Outage Status Meeting Package

09/19/2019

Unit 3 21st Refueling Outage Shutdown Risk Assessment

Team Review Report

19-011

PRB Meeting Agenda - U3R21 Refueling Outage Restart

11/12/2019

Procedures

01DP-9ZZ02

Reactivity Management Program

31MT-9RC25

Pressurizer Manway Removal and Installation

40DP-9OP02

Conduct of Operations

40OP-9ZZ02

Initial Reactor Startup Following Refuelings

40OP-9ZZ04

Plant Startup Mode 2 to Mode 1

40OP-9ZZ16

RCS Drain Operations

40OP-9ZZ23

Outage GOP

40ST-9ZZ09

Containment Cleanliness Inspection

71111.22

Drawings

1-M-ECP-001

Essential Chilled Water System

1-M-EWP-001

Essential Cooling Water System

Procedures

14MT-9BD41

FLEX SG/RCS Pump Inspection and Testing

73ST-9EW02

Essential Cooling Water Pumps - Comprehensive Pump

Test

74ST-9SI03

ECCS Trisodium Phosphate Surveillance Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.04

Corrective Action

Documents

Evaluation 19-

11093-01

Inadvertent Administrative Errors introduced into EPlan

Basis

61-62,

07/31/2019

Miscellaneous

2-07135-

MLL/TNW/DCE

Palo Verde Nuclear Generating Station (PVNGS); Units 1, 2,

and 3 and Independent Spent Fuel Storage Installation;

Docket Nos. 50-528, 50-529, 50-530 and 72-44; License

Nos. NPF-41, NPF-51, NPF-52 and NPF-74; Request for

NRC Approval of Proposed Changes to PVNGS Emergency

Action Levels

10/9/2015

2-07255-

MLL/JF/DCE

Palo Verde Nuclear Generating Station; Units 1, 2, and 3

and Independent Spent Fuel Storage Installation; Docket

Nos. STN 50-528, 50-529, 50-530, and 72-44; Renewed

Operating License Nos. NPF-41, NPF-51, NPF-74;

Response to Request for Additional Information Regarding

Proposed Changes to PVNGS Emergency Action Levels

05/12/2016

2-07975-

CS/MA

Palo Verde Nuclear Generating Station (PVNGS); Units 1, 2,

and 3 and Independent Spent Fuel Storage Installation;

Docket Nos. 50-528, 50-529, 50-530 and 72-44; License

Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency

Plan

64,

08/30/2019

Evaluation

Tracking Number

2019-001e

PVNGS Emergency Plan

64,

06/21/2019

Screening

Tracking Number

2019-007s

PVNGS Emergency Plan

64,

06/20/2019

Procedures

EPP-0901

Classifications

10, 12

71151

Miscellaneous

Palo Verde PI Data Excel Files

Procedures

74CH-9ZZ15

Dose Equivalent Xe-133 and Dose Equivalent I-131

Determination

74ST-9RC02

Reactor Coolant System Specific Activity Surveillance Test

71152

Corrective Action

Documents

Condition Reports 16-16924, 16-18661, 17-00543, 17-08542, 17-17725, 18-

00913, 18-18161, 19-00690, 19-08371, 19-126924, 19-

13049, 19-15694, 19-15696, 19-16600, 19-00736, 19-

2761, 19-12694, 19-08371, 18-01090, 18-00913, 17-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

17725, 17-16824, 17-16077, 17-00543

Miscellaneous

19-08371-009

MRFF Evaluation

2/05/2019

Procedures

40DP-9GT01

Station Blackout Generator Test Record

70DP-0MR01

Maintenance Rule

71153

Corrective Action

Documents

Condition Reports 19-04626

Miscellaneous

19-04626-006

Level 2 Cause Analysis Report: Leakage from Unit 1 HPSI

Drain Valve SIA-V811

0