Summary of 931019 Meeting W/Util Re Licensee Method of Calibr for Containment high-range Radiation Monitors,Per Deviation in Insp Rept 50-528/93-03.List of Attendees Encl. W/O Viewgraphs
ML17310A847
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/30/1993
From: Brian Holian
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM NUDOCS 9312090251
Download: ML17310A847 (5)


Text

ghee REGS O~

O $

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 1993 Docket Nos.

50-528, 50-529, and 50-530 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station SUBJECT:

SUHHARY OF HEETING HELD ON OCTOBER 19, 1993, TO DISCUSS RADIATION HONITOR CALIBRATION HETHODS On October 19, 1993, the NRC staff met with representatives of Arizona Public Service Company (APS) to discuss the licensee's method of calibration for the containment high range radiation monitors.

The licensee was issued a Notice of Deviation in Inspection Report 50-528/93-03 regarding its use of a "keep-alive" source that does not meet the calibration requirement specified in NUREG-0737; Table II.F.1-3.

The licensee requested to meet with the NRC staff to understand the NRC staff's concerns, and to present background information regarding its current calibration methodology.

Persons attending the meeting are listed in Enclosure (1).

Viewgraphs presented at the meeting are contained in Enclosure (2).

APS representatives responded to staff concerns regarding the NUREG-0737 wording that states that "in-situ" calibration for the low range of the monitor be conducted with an "external" radiation source to determine that the monitor adequately meets the stated range and energy response requirements.

APS personnel described their understanding of generic industry calibration practices, emphasizing that "transfer sources" are routinely utilized in place of a "calibrated radiation field".

The licensee continued the discussion by describing its calibration method, where the internal source becomes, in effect, a calibrated transfer source that is traceable to the primary calibration.

The staff agreed in principle with the licensee's approach, but stated that additional review of the calibration methodology would be necessary prior to accepting the licensee's approach for long term equivalent surveillance.

A conference call was held with the licensee on November 10, 1993, to state that although the licensee's methodology would be reviewed for continued acceptance as an equivalent surveillance, the alternate method was still considered a

deviation to the NUREG-0737 described calibration.

The staff also requested additional information regarding the correlation between the primary calibration and what the detector was seeing with'the "keep-alive" source.

93i209025i 93ii30 PDR

,ADOCK 05000528;

PDR

'

'a

V If I

"

f~ q-"f'

Octobe

993 Enclosure

Rad'ation o

to Cal br t o et odolo Meet n arne Brian Holian Richard A. Bernier Duane L. Kanitz Randall 0. Sorensen Thomas W. Murphy Harvey C. Lesan William J. Wattson Tom Essig Stephen Klementowicz Or anizat o

NRC/NRR APS APS APS APS APS APS NRC/NRR/RPB NRC/NRR/RPB

Multiple Addressees The licensee committed to respond to the notice of deviation, and submit the additional information in support of the staff's review of their ongoing surveillance practice.

Staff review of this methodology can be tracked under TAC No.

M88217.

Original signed by:

Enclosures:

l. Attendance List 2. Viewgraphs cc/w enclosures:

See next page DISTRIBUTION:

I Docke Fi'ie)

NRC 8 Local PDRs PDV Reading K. Perkins, RV Brian E. Holian, Project Manager Project Directorate V

Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation T. Hurley/F. Hiraglia L. J. Callan, Acting J,

Roe E.

Adensam T,

Quay B. Holian L. Tran E. Barnhill OGC, 15B18 E. Jordan, 3701 NRC Participants ACRS (10))

P315 J. Mitchell, EDO, 17G21 OFC PDV/LA PDV PH PDV/PH PDV/D NAME EBarnhill LTran +

BHolian QR+

TQua ll 3P/93 DATE OFFICIAL RECORD DOCUMENT ll ~ 93 ll ~93 llew

DOCUMENT NAME:

PVHTGSUH.019

q </

~