IR 05000529/1993022

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 93-119 W/Util on 930603 in Walnut Creek,Ca to Discuss Apparent Violations of Licensee EPIPs Identified in Insp Rept 50-529/93-22
ML17310A289
Person / Time
Site: Palo Verde 
Issue date: 05/21/1993
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
EA-93-119, NUDOCS 9305260056
Download: ML17310A289 (3)


Text

NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Name of Facility:

Docket Nos.:

Enforcement Action No.:

Arizona Public Service Company (APS)

Palo Verde Nuclear Generating Station 50-528, 50-529.and 50-530 EA-93-119 Date

& Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Other Attend'ees:

Thursday, June 3, 1993 at ll:00 a.m.

NRC Region V Office Walnut Creek, California Enforcement conference to discuss apparent violations of licensee's Emergency Plan Implementing Procedures (EPIP's), identified in Inspection Report 50-529/93-22.

Bobby H. Faulkenberry, Acting Regional Administrator Ross A. Scarano, Director, Division of Radiation Safety and Safeguards Frank Wenslawski, Deputy Director, Division of Radiation Safety and Safeguards Robert Pate, Chief, Safeguards, Emergency Preparedness and Non-Power Reactor Branch Michael Blume, Regional Attorney Randall Huey, Enforcement Officer Howard Wong, Chief, Reactor Projects,Section II Jim Sloan, Senior Resident Inspector Lynn Tran, NRR,. Project Manager Phillip gualls, Reactor Inspector W. Conway, Executive Vice President, APS J. Levine, Vice President, Nuclear Productions, APS P. Caudill, Director, Site Services, APS R. Stevens, Director, Licensing and Compliance, APS R. Adney, Plant Manager, APS, Unit I R. Flood, Plant Manager, APS, Unit 2 T. Bradish, Manager, Nuclear Regulatory Affairs, APS H. Bieling, Manager, Emergency Planning, APS F. Kroll, Security Manager, APS Other designated licensee personnel (as appropriate)

PRAAgg 9305260056 930521 PDR ADOCK 05000528 PDR

Significant Heeting, APS-2-NOTE:

Attendance at this meeting by NRC personnel other than those listed above should be made known by COB, Hay 27, 1993, via a

telephone call to Phil Quails, 510-975-0245.

Approved By:

oss

.

carano, grec or Division of Radiation Safety and Safeguards DISTRIBUTION:

J. Sniezek, Deputy Executive Director, NRR T. Hurley, Director, NRR J. Partlow, Associate Director for Projects, NRR M. Russell, Associate Director for Inspection and Technical Assistance, NRR J.

Liebermann, Director, Office of Enforcement J.

Goldberg, OGC B. Boger, Director, Reactor Projects, NRR T. Quay, Project Director, NRR C. Trammel, Project Hanager, NRR

'.

Hitchell, EDO Regional Coordinator H. Blume, Regional Counsel D. Kunihiro, Regional State Liaison Officer, RV G. Cook, Public Affairs Officer, RV F. Congel, Director, Division of Radiation Safety and Safeguards, NRR R. Erickson, Chief, Emergency Preparedness Branch, DRSS, NRR NRC Attendees as Listed bcc:

H. Smith J. Zollicoffer Central Files RV gmd Q EST COPY ES NO alls 5/rP93 REQUEST COPY YES/NO) ~jgg RPate 5/Z~/93 VEST COPY

/NO carano 5/g//93 0 TO PDR SEND TO DCS ES NO YES/NO

pe