IE Insp Repts 50-518/81-15,50-519/81-15,50-520/81-15 & 50-521/81-15 on 810811-14.Noncompliance Noted:Failure to Follow Procedures for Stud Welding
ML20032B655
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 08/27/1981
From: Crowley B, Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20032B626 List:
References
50-518-81-15, 50-519-81-15, 50-520-81-15, 50-521-81-15, NUDOCS 8111050767
Download: ML20032B655 (9)


Text

,.

_

,

..

..

00"4 UNITED STATES :

4

$

NUCLEAR REC ULATORY COMMISSION

{

g REGION 11

.E 101 MARIETTA ST,. N.W., SUITE 3100 g

-

e,,

ATLANTA GEORGIA 30303

%,..... p

,

Report Nos. 50-518/81-15, 50-519/81-15, 50-520/81-15 and 5J 521/81-15 Licensee:

Tennessee Valley Authority 500A Chestnut Street Chattnooga, TN 37401 Facility Name: Hartsville Docket Nos. 50-518, 50-519, 50-520 and 50-521 License Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 Inspection at rtsville site near Hartsville, Tennessee-Inspect

[ 07

[

B. R. crowl y ate Signed Approved by:

!4/6

/

A. R. He'rdt,- Section Chief

'Date Signed Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on August 11-14, 1981 Areas Inspected This routine, unannounced inspection involved 30 inspector-hours onsite in the areas of previous inspection findings (Units A1, B1 A2 and 82), safety related pipe (Units Al and A2), and safety related structures (Units Al and A2).

Results Of the three a;eas inspected, no violations or deviations were 'dentified in two areas; one violation was found in one area (Violation - Failure to Follow Proce-dures for Stud Welding, Paragraph 8.b.(1)).

O!hdO!f8 PDR I

.

.

.

.

..

..

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • R..T. Hathcote, Project Manager
  • W. T. Quinn, Construction Engineer
  • G. A. Gonsalves, Site QA Supervisor S. R. Stout, EN DES, NEB - NLS W. K. Anders, OEDC - QA
  • S. P. Stagnolia, Welding QC Unit Sul -"isor
  • B. F. Painter, General Construction Superintendent
  • J. W. Davenport, Civl QC Unit Supervisor R. E. McClure, Mechanical QC Unit Supervisor F. E. Laurent, Mechanical P > ject Engineering Unit Supervisor
  • T. L. Carden, Assistant Supervisor - Welding QC Unit G. R. Hudson, Civil Project Engineering - Shift Engineer T. H. Carrell, Civil Project Engineering - Shift Engineer J. E. Brown, Civil Project Engineering - Engineer J. R. Lewis, Civil QC Engineering - Engineer
  • R. B. Stamps, Site QA Lead Mechanical Auditor D. J. Ward, Site QA Lead Electrical Auditor J. T. McGhee, Engineering Management Assistant

'Other licensee employees contacted included construction craftsmen, QC inspectors, security force members, and office personnel.

NRC Resident Inspector

  • W. B. Swan
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on August 14, 1981 with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection findings listed below. No dissenting comments were received from the licensee.

(0 pen) Violation 520/81-15-01, Failure to follow procedures for stud welding, paragraph 8.b(1).

(0 pen) Inspector Followup Item 520/81-15-02, Clarification of stud welding inspection requirements, paragraph 8.b.(2). p

..

.

i

3.

-Licensee Action on Previous Inspection Findir.gr (Closed) Violation 518/81-04-04, Failure to follow bead width procedure requirements. TVA letter of response dated April 17, 1981 has been reviewed and deternined to be acceptable by Region II.

The inspector held discus-sions with responsible licensee personne~l and examined corrective actions as stated in the letter of response.

The inspector concluded that TVA had determined the full extent of the subject vio'ation, performed the necessary followup actions to correct the present conditions and developed the neces-sary corrective actions to preclude recurrence of similar circumstances.

The corrective actions identified in the letter of response have been implemented.

(Closed) Violation 518, 519, 520, 521/81-04-03, Inadequate measures to control welders qualifi'.ation and repair welding.

TVA letter of response dated April 17. b" nas been reviewed and determined to be accentable by Region II.

~

spector held discussions with responsible licensee personnel and >xamined corrective actions as stated in the letter of response. The.nspector concluded that TVA had determined the full extent of the subject iiolation, performed the necessary followup actions to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstances. The corrective actions identified in the letter of response have been implemented.

(Closed) Violation 518, 519, 520, 521/81-04-02, QCIR report mishandling.

TVA letter of response dated May 15, 1981 has been reviewed and determined to S acceptable by Region II. The inspector held discussions with respon-sible licensee personnel and examined corrective actions as stated in the letter of response.

This examination included review of licensee revised procedures (QAI-4, revision 2 and CEP 15.01, revision 14) and a site QA audit which had been completed but not yet issued. The inspector concluded that TVA had determined the full extent of tns subject violation, performed the necessary followup actions to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstances. The corrective actions identified in the letter of response have been implemented.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Independent Inspection Effort (Units Al and A2)

The inspector conducted a general inspection of the reactor buildings, auxiliary buildings, fuel buildings, and control buildings to observe construction progress and construction activities such as welding, material control, housekeeping, and storage.

Within the areas inspected, no violations or deviations were identifie f..

..

6.

Safety Related Piping (Units Al and A2)

The inspector examined the work activities described below for safety related piping to determine whether applicable code and procedure require-ments were being met. The aoplicable code for this welding is the ASME Boiler and Pressure Vessel Code,- Section III, Subsections NC and ND,1974 Edition with addenda through Summer 1974.

a.

Observation of welding Activities The inspector observed the following in process welds at the stages indicated:

Weld Size Class Unit Status A1ARH0362R01 4"X.237" IIIC2 Al Welding Fill Passes A1ARh0350004 4"X.237" IIIC2 Al Welding Fill Passes A1ARH034003 4"X.237 IIIC2 Al Root Pass Welded A2AHP0061004 10"X.719" IIIC2 A2 Final Weld A2ARH0211010 4"X.237" IIIC2 A2 Fitup, Welding Root Pass A2FFC0313R02 3"X.148" IIIC3 A2 Fitup, Welding Root Pass The welding was examined to determine whether:

(1) Work is conducted in accordance with a document which coordinates and sequences operations, references procedures, establishes hold points, and provides for production and inspection approval.

(2) Weld identification and location are as specified.

(3) Procedures, drawings, and other instructions are at the work station and readily available.

(d) WPS assignment is in accordance with applicable code requirements.

(5) Welding technique and sequence are specified and adhered to.

(6) Welding filler materials are the specified type and traceable to certification (7) Alignment of parts is as specified.

(8) Preheat and interpass temperatures are in accordance with proce-dure T.:.

..

.

4-

-(9) Electrodes are used in positions and with electrical character-istics specified.

(10) Shieldiig gas is in accordance with the welding proced res.

(11) Welding equipment is in good condition.

(12) Interpass cleaning is in accordance with applicable procedures.

(13) Temporary attachments are removed -in accordance with applicable procedures.

(14) Welding personnel are qualified.

(15) Weld History records are adequate b.

Welder Qualification The inspector reviewed the welder qualification records for the welds listed in a. above.

c.

Observation of Non-Welding Activities The inspector observed the following activities:

,

Unit Weld Status Fitup, Handling A2 Spool Pc. 18AB-RHR-36.1 Fitup Inspection, A2 Spool Pc.18FB-FPCC-13-2 Alignment weld A2FFC0313R02 Receiving Inspection A1, A2 4" Random Length Stainless Steel Pipe -

A312, type 304L, Ht.

08515 The work was examined in the areas of:

(1) Conformance with QC and work procedures (2) Conformance with record keeping requirements (3) Conformance with construction specifications (4) Parformance of prescribed inspections (5) Use of qualified inspectic, personnel Within the areas inspected, no violations or deviations were identified.

_ _ -.. _

. _ -.

.

,_.. _ - _ _

_

_

, _. _ _ _. -

~-

r

-,,

..

7.

Steel Structures and Supports - Observation of Welding nctivities Within Containment (Units Al and A2)

The inspector examined welding activities for the containment structure as described below to determine whether applicable code and procedure require-ments are being met. 'The applicable code for containment welding is the ASME Boiler and Pressure Vessel Code,Section III, Subsection NE,1974 Edition including Addenda through Summer 1974.

a.

Observation of Welding Activities (Free-Standing Steel Containment)

The inspector observed the below listed in process welds at various stages of completion:

Unit Weld Status Al A1CS00910 Capping Weld Al A1CS00922 Finished Weld Al A1CS00923 Capping Weld A2 A2CS00313 Welding Fill Passes A2 A2CS00435 Welding Fill Passes A2 A2CS00436 Fitup A2 A2CS00434 Capping Weld A2 A2CS00433 Welding Fill Passes The inspector examined this work to determine whether:

(1) Work is conducted in accordance with a document which coordinates and sequences operations, references procedures, establishes hold points, and provides for production and inspection approval.

(2) Procedures, drawint., and other instructions are at the work station and readily available.

(3) Welding technique and sequence are specified and adhered to.

(4) Weld joint geometry is in accordance with applicable procedure and inspected.

(5) Electrodes are used in positions and with electrical character-istics specified.

(6) 'delding equipment is in good working condition.

b.

Welder Qualification The inspector reviewed the welder qualification records for the welds listed in a. abov.

-.

l.

.

.

.

-

,~

Within the areas inspectsd, no violations or deviations were dentified.

8.

Steel Structures and Su'pports - Observation of Welding Activities Outside Containment (Units Al and A2)

a.

The inspector observed field welding of steel structures at various stages-of weld completion. The applicable code for this welding is the AWS Structural Welding Code DI.1, Revision 2-74.

The following welds were observed:

Unit Structure Weld Dwg.

A2 Control Bldg.

.

Stud Welding S-826 Structural Steel to Beam 8A at Elevation + 11'

Al Auxiliary Bldg.

Conneccion Angle RCIC Pump 2518CA to Beam Room Structural 2518A2 and Plate Steel 7487023 at Elevation

- 32'

The inspector observed the work to determine whether:

(1) Work is conducted in accordance with a document which coordinates and sequences operations, references procedures, establishes hold points, and provides for producation and inspection approval.

(2) Weld identification and location are as spect'ied.

(3) Procedures, drawings, and other instructions are at the work stations and readily available.

(4) WPS assignment is in accordance with applicable code requirements.

(5) Welding technique and sequence are specified and adhered to.

(5) Welding fiiier materials were specified type and traceable to certification.

(7) Weld joint geometry is in accordance with apr'icable procedure and inspected.

(8) Alignment of parts is as specified.

(9) Dreheat and interpass temperatures are in accordance with proce-dures.

.

.,-

,--

T e.

  • .

(10) Electrodes are used in positions and with electrical character-istics specified.

(11) Welding equipment is ic good condition.

(12) Interpass cleaning is in accordance with applicable procedures.

(13) Temporary attachments are removed in accordance with applicable procedures.

(14) Process control system has provisison for weld repairs.

(15) Welding and inspecti n personnel are qualified.

(16) Weld history records are adequate b.

During observation of the stud welding in the Unit A2 control building identified above, the inspector noted the following problems:

(1) The inspector requested the stud welding procedure covering the work in progress. The personnel performing the work did not have a copy of the procedure and could not locate a copy.

After searching for some time, a copy of the work package was found. In review of the work package, B262-C2, the inspector noted that no reference was made to the stud welding procedure or the QCI for inspecting the stud welds. Project Engineering later determined that this lack of i eference to stud welding procedures in the work package also applied to other work packages (C-022-C2, C-268-C2, and B-020-C1) for str uctural steel. Paragraph 2 of revision 5 to CEP 5.04, " Work Packages", requires that documents, quality control instructions, and other special instructions and/or procedures nacessary to perform the work be identified in the work package. Additionally, discussiors with the QC inspector and stud welding personnel revealed that tne two pre production test stud welds for the work observed by tte inspector had not been made as required by paragraph 3.0 of QCI N-504, Revision 0, " Stud Welding, AWS, Examination and Testing".

Failure to reference procedures for stud welding in the work package and failure to comply with tesr.ing requirements of QCI N-504 is considered to be in violation of 10 CFR 50, Appendix B, Criterion V and is identified as item number 520/81-15-01, Failure to follow procedures for stud welding.

(2) During rev;ew of QCI N-504, the inspector noted that the procedure is not clear as to when the inspection requirrtents for shear connectors apply and when the inspection requirements fer concrete anchors apply.

Paragraph 2.0 of the QCI indicates that differ-entiation between shear connectors and concrete anchors cannot be

..

..

8.

made at the construction level and unless design drawings speci-fically ideritify welded studs as one or the other, studs are to be tested-as " unidentified".

However, the field considers that the parts are identifiable as sheer connectors o concrete anchors based on the vendor's catalog number.

The licensee agreed to clari fy this matter, which will be identified as inspector follewup ' item 520/81-15-02, C1arification of stud welding inspection requiren.en ts.

Within the areas inspecte.', no violations, except as identified in para-graph 8.b.(1), or deviations were identified.

9.

Inspector Followup Item;,

(0 pen) Inspector Followup Item 519/80-01-01, MT Indications on Anchor /

Darling Globe Valve.

The licensee has obtained the radiographic film for the valve body and is attempting to correlate the MT indications with weld repair areas. This item will be reviewed further during future inspections.