IR 05000518/1981012

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-518/81-12,50-519/81-12,50-520/81-12 & 50-521/81-12 on 810701-31.Noncompliance Noted:Failure to Perform & Interpret Nondestructive Exam as Acceptable
ML20032B460
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 09/02/1981
From: Cantrell F, Schapker J, Swan W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20032B440 List:
References
50-518-81-12, 50-519-81-12, 50-520-81-12, 50-521-81-12, NUDOCS 8111050567
Download: ML20032B460 (10)


Text

b!

-

,

T

..

C SEP 2 1981 Tennessee Valley Authority ATTN: Mr. H. G. Parris

,

Manager of Power 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:

Subject: Report Nos. M8/81-D50-519/81-12, 50-520/81-12, and 50-521/81-12 This refers to the routine safety inspection conducted by fir. W. B. Swan of this office on July 1-31, 1981, of activities authorized by NRC Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for the Hartsville facility. Our preliminary findings were discussed with Mr. R. T. Hathcote, Site Project fianager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license appear to violate NRC requirements.

This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously identified enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item is identified in the enclosed inspection report. This item will be examined during subsequent inspections.

In ?cordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office by telephone within ten days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five days from the _date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days are available for your review, please notify this office promptly)so that a new due date may be established.section 2.790(b (1), such appl Consistent with executed by the owner of the information which identifies the document or part thereof sought to be withheld, and a full statement of the reasons on the basis of which it is claimed that the information should be withheld from public 8111050567 811014 gDRADOCK 05000518 PDR

__ _.

_. _..

f'

.

,

,

>

.

,SEP-g y Tennessee Valley. Authority --

disclosure. This 'section further. requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall.be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Sheuld you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

/7de R. C. Lewis, Director Division'of Resident and Reactor Project Inspection Enclosures:

1.

Appendix A, Notice of Violation 2.

Inspection Report Nos. 50-518/81-12 50-519/81-12, 50-520/81-21, and 50-521/81-12 cc w/ encl:

H. J. Green, Director of Nuclear Power R. T. Hathcote, Project Manager J. F. Cox, Supervisor, Nuclear Licensing Section J. E. Wills, Project Engineer H. N. Culver, Chief Nuclear Safety Review Staff bec w/ encl:

NRC Resident Inspector Document !!anagement Branch State of Tennessee f

af f

Ob WSwan:dr PTaylor FSCantrell RCL wis (<~g/L/81

/~A/z/81 E/ 2-/81 8 &,/81

9

9