AUG 2 81981
,
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN' 37401
Gentlemen:
Subject: Report Nos.M18/8h3, 50-519/81-15, 50-520/81-15 and 50-521/81-15
This refers to the routine safety inspection conducted by Mr. B. Crowley of this
office on August 11-14, 1981, of activities authorized by NRC Construction Permit
i
Nos. CPPR-150, CPPR-151, CPPR-152.and CPPR-153 for the Hartsville facility. Our
preliminary findings were discussed with Mr. R. T. Hathcote, Project Manager, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in'the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in- the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have. taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five_ days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
-
so that a new due date may be established. Consistent with section 2.790(b)(1),
i
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
i
I:
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
L
requires the statenent to address with specificity the considerations listed in
l
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
i:
81110507538gO23Og
'
gDRADOCK05
-
.o
, ,
Tennessee Valley Authority
2
ggg 3 g jggj
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/s/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-518/81-1U,
50-519/81-15, 50-520/81-15 and
50-521/81-15
cc w/ encl:
H. J. Green, Director of Nuclear Power
R. T. Hathcote, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief
Nuclear Safety Review Staff
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Tennessee
rih
RII
RII
RII
R
I
P
\\]i)$
(,W
h
GV
t
BCrowley:aw
AHerdt
CEMurphy
AFGibson
P~aylor
(CLewis
08/ 3/81
08/g81
08/M/81
08p/81
08/M'81
08g/81
3