Text
'o UNITED STATES g
NUCLEAR REGULATORY COMMISSION o
$
E
~ REGION 11
o 101 MA L ETTA ST., N.W., SUITE 3100 Ai ANTA,GEORGtA30303
Report Nos. 50-518/81-22, 50-519/81-22, 50-520/81-22, and 50-521/81-22 Licensee:
Tennessee Valley Authority 500A Chestnut Street Chattanooga, TN 37401 Facility Name: Hartsville Nuclear Plant Docket Nos. 50-518, 50-519, 50-520, and 50-521 License Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 Inspection at Hartsville site near Hartsville, Tennessee N -*S '9/
Inspectors:
6?f Is..
w W. B. Swan Date Signed
/QW7[ ffh
/Af9lfl
J. F. Schapker
~ ' f/
Date $1gned Approved by:
+/
/2 9 F. S. Cantrell,'Sectibn'Chigf, Division of Date Signed Resident and Reactor Idspection SUf! MARY Inspection on November 2-30, 1981 Areas Inspected This routine, unannounced inspection involved 144 inspector-hours on site in the areas of structural concrete, A-1 and A-2 steel containment welding, earthwork, open items, independent inspection effort, review of NDE implementing procedures, and piping (supports, hangers and restraints).
i Results Of the areas inspected, no violations or deviations were identified.
,
,
e
"
8112310318 81121 PDR ADOCK 05000518 G
--
-
-
-
. -
- - -
- - - -
.
_ _ _ _..
.
DETAILS s
1.
Persons Contacted
Licensee Employees
.
- R. T. Hathcote, Site Project fianager
-
W. T. Quinn, Construction Engineer
-
R. E. Young, Assistant Construction Engineer, PE R. E. ficClure, Unit Supervisor, flechanical QC, STRIDE T. O. Wilkenson, Unit Supervisor, !!aterial Services J. W. Henry, Unit Supervisor, QC Welding K. H. Stewart, Assistant Construction Engineer, Engineering Services H. S. Sheppard, Assistant Construction Engineer, Quality Control T
i B. F. Huffaker, Supervisor, flaterials QC Unit i
P. F. Gillespie, Document Control Unit
-
F. E. Laurent, Unit Supervisor, STRIDE Mechanical Project Engineering
.
i G. A. Gonsalves, QA Unit Supervisor M. U. Rudolphi, Unit Supervisor, Project Engineering, Hangers and Supports J. T. McGehee, Engineering Management Assistant
__
V. L. Ledbetter, Construction Engineering Associate
Other licensee employees contacted included document control personnel, craftsmen, QC technicians, and project engineers.
- Attended exit interview 2.
Exit Interview
-
The inspection scope and findings were summarized with the Site Project i
!!anager on November 6,16, 20 and 30,1981.
-
3.
Licensee Action on Previous Inspection Findings These items were not reviewed.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort The senior resident inspector made 6 surveillance tours during which the status of project work was noted, and construction activities were inspected on nuclear safety-related structures, systems and facilities. The inspection was concentrated on Plant A power block structures, but included w
outlying structures such as the Plant A essential service water pump
=
stations, earthfill for the A-1 and A-2 spray ponds, nd valve stations and
+
electrical conduit vaults between the spray ponds and north of the condenser cooling water pump house.
-
---
. _ __ _ _ _ _ _ - - _ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
_ _ _ _ _ _
__
. _ _ _ _ _ _
.
Open Items Control: Newly issued Nonconformance Reports (NCRs), significant Quality Control Inspection Reports (QCIRs) and QA Unit audit findings were reviewed for pertinence to the inspection program and for adequacy of corrective actions.
Review of QCIRs and NCRs did not disclcse any violations or unresolved items.
The inspector toured the welder training and welder qualification areas to observe welder training and qualifications in progress. Observations of equisnent, facilities, and training aids were made in the welder training shop, and qualification area. The welder qualificatioa program was inspected for canpliance to procedural and ASME Boiler and Pressure Vessel Code Section IX requirements.
The following performance qualification tests were observed in progress:
Performance Qualification Test Welder's Identity SM-4-BH (Vertical)
4317 SM-4-BH (Vertical)
4315 SM-5-B-3H (6G)
1179 91-5-B-3H 1055 SM-4-B-H (Horizontal)
1180 S!1-4-B-H (Horizontal)
4319 Observations made by the inspector of the above tests included:
Base material, electrode type and size, weld position, electrical characte-ristics, polarity, preheat and interpass temperature.
In addition, guided bend test for performance qualification test SM-4-B-H, welder 4319, was observed in progress and was performed in accordance with the requirements of ASME,Section IX, paragraph QW-302.1.
In the areas inspected, no violations or deviations were identified.
6.
Licensee Identified 50.55(e) Items Previously Identified (Closed) 518, 519, 520, 521/81-02-02 Pressure Drop in Essential Service Water Piping (HTRD 81-02)
This matter has been renumbered and will now be tracked by 518, 519, 520, 521 CDR 81-02.
(Closed) 518, 519, 520, 521/81-02-03 SGTS Design Deficiency (HTRD 81-03)
This matter has been renumbered and will now be tracked under 518, 519, 520, 521 CDR 81-03 Standby Gas Treatment System Design Deficiency - Supplemental.
(Closed) 518, 519, 520, 521/81-07-01 Failure By ITT Grinnel to Use Proper Testing Methods (HTRD 50-518,519,520,521/81-07)
- -
_ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _
_ - _ _ _ _ - _ _ _ _ _ _ _ _ _,
.
This matter "ill now be tracked as 518, 519, 520, 521/81-G7! Failure By Grinnel to Use Proper Testing fiethods, NCR 7, Supplemental 04-03-81; 05-19-81.
(Closed) 518, 520/81-10-03 Review of Purchase Request Foms Initiated by Construction (HTRD 518/81-14; 520/81-12)
This matter will be tracked under numbers 518 CDR 81-14 and 520 CDR 31-12.
(Closed) 518, 520/81-10-04 QA Documentation For Drywell Framed Embedments (HTRD 50-518/81-13; 520/81-11)
This matter will now be tracked under 518 CDR 81-13 and 520 CDR 81-11.
(Closed) 518, 519, 520, 521/81-02-01 Fillet Weld 111sspecification For Skewed Tee Joints HTRD 50-518, 519, 520, 521/81-01 This matter will be tracked under new numbers 518, 519, 520, 521 CDR 81-01.
(0 pen) 518, 519, 520, 521/81-04-01 Inspection Requirements for AWS Welds.
By next to last paragraphs of the enclosure to TVA letter dated June 22, 1981, on this matter, the licensee committed to issue a memorandum by June 30, 1981, detailing corrective provisions to be incorporated into TVA's Engineering procedures to clarify design engineering responsibilities in implementing ANSI N45.2.5 and where required, to impose verification of joint fit up on construction drawings, in construction specifications, or in procurement specifications.
Licensee has not completed all procedural changes required.
7.
Lakes, Dams, and Canals--Review of Work and Work Activities--Earth Fill For Plant A Spray Ponds The inspector made random inspections of eerth placement, compaction and compaction testing on the earth work between A-1 and A-2 essential service water spray ponds. Compaction testing in the field was inspected. Whenever the result was unacceptable, the sampled area was reworked and retested until adequate compaction was obtained.
Placement and compaction of earth fill for the peripheral dikes around the spray ponds is controlled by Specification N6C-875 Earth and Rock Foundations and Fills. By observation of placement and testing operations, the inspector verified compliance with Specification N6C-875 and with quality control procedure QCI-102, Foundation and Fill, Earthfill Control Testing.
In the areas inspected, no violations or deviations were identified.
8.
Seismic Category I Concrete Foming, installation of rebar, positioning of embedments, placements and post placement curing were inspected as work progressed in the Plant A fuel l
_ _...
_
__
.
.
buildings, auxiliary buildings, control buildings, essential service water pump houses, valve stations and electrical conduit vaults.
Specific placements inspected included:
A2A-51, 53, 65 188 Cubic Yards AIR-11A 28 Cubic Yards
-
AIA-10H 55 Cubic Yards AIKESWPS-104, 105 230 Cubic Yards AIKESW/V-18 116 Cubic Yards A2C-9, 9 40 Cubic Yards A0W-148, 149, 150 284 Cubic Yards Forms and rebar placement in preparation for placements in other areas were also inspected.
During inspection of activities for structural concrete in these areas, conformance with the requirements of C. F. Braun Specification 300-0,
,
Revision 8, " Concrete", TVA Construction Specification G-2, QCI C-201, Revision 4, and CEP 9.02, Revision 5, was verified by the inspector.
In the areas inspected, no violations or deviations were identified.
9.
Safety-Related Piping (Welding) Observations of Work and Work Activities The inspector observed welding of safety-related piping in A-1 plant, Fuel Pool Clean Up System (FPCU) and Residual Heat Removal System (RHR) outside of containment.
Verification of welding process to detailed weld procedure specification (WPS), detailed drawings and applicable code and requirements was made. The applicable code for piping inspected is the ASME Boiler and Pressure Vessel Code,Section III, Subsection NC and ND.1974 Edition, including addenda J
through S74.
The inspector verified: base material, welding filler material, and shielding gases were of the specified type and grade; fit-up weld joint geometry, including pipe wall thickness was as specified and met the gap and alignment limits required by the ASME code.
The welders perforning the welds were identified on applicable process control sheets and possessed current qualifications for process, position and thickness of weld.
The following welding characteristics were verified in progress.
For welds identified AIARH009005, AIFFC2210R05, and AIFFC2050R06; in compliance with weld procedure specification GTMS11-0-3B, Revision 8, anperage polarity, travel speed, interpass cleaning, electrode size and type, shielding gas flow rate, preheat and interpass temperature, and welding position.
In addition, the inspector performed visual inspection of in process and completed welds, observed magnetic particle (MT) examination of weld number AIFFC2050R06 and reviewed radiographs (RT) for weld numbers AIARH001, AIARH0004, AI ARH0009A, and AIARH003R1. Nondestructive examination
_
- _ - __ -
_-___
____
- _ -. _ -.
i
.
,
<
L L
[
inspectors' qualifications to SNT-TC-IA Level II MT and-RT were verified,
-
and examinations were accomplished' to applicable; procedure requirements.
Within the areas inspected no violations or deviations were identified.
10. Unit-A-2 Reactor Vessel Installation--0bservation of ' Work and Work
' Activities The reactor vessel was installed on its pedestal'in 1980.
In the interim,
' the: resident inspector has verified by periodic inspections that the integrity of the vessel closures has been maintained and that warmed air has been circulared to protect the internals, which ~were installed at the
. vendor's shop. Protection of _ the vessel and the nozzles from construction damage has been provided.
No violation or deviations were identified.
11. Status of Inspection and Enforcement Bulletins (Closed. for Hartsville) 80-08 Examination of ' Containment Liner Penetration Welds.
12. Status of IE Circulars
.(Closed) 81-44 Hain Steam Valve Failure 'to Close.
Site. project engineers have received and reviewed this circular.
'