IR 05000518/1981020
| ML20040E844 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 12/07/1981 |
| From: | Conlon T, Harris J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20040E833 | List: |
| References | |
| 50-518-81-20, 50-519-81-20, 50-520-81-20, 50-521-81-20, NUDOCS 8202050431 | |
| Download: ML20040E844 (3) | |
Text
_.
.
.
_
.
__
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l
.
>
p#
%#
UNITED STATES
1, NUCLEAR REGULATORY COMMISSION g
a REGION 11
o 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303
- sses Report Nos. 50-518/81-20, 50-519/81-20, 50-520/81-20, and 50-521/81-20 Licensee: Tennessee Valley Authority 500A Chestnust Street Chattanooga, TN 37401
~ Facility Name:
Hartsville Docket Nos. 50-518, 50-519, 50-520 and 50-521 License Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 Inspection at Hartsville site near Hartsville, TN Inspector:
dr1[h d 11f7/f(/
~ i J. R. Hapris D'atd Signed
/d - 7 - fr#/
Approved by T. E. Conlon, Section Chief Date Signed Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on November 17-20, 1981 Areas Inspected This routine, unannounced inspection involved 34 inspector-hours on site in the areas of structural concrete and backfill.
Results Of the two areas inspected, no violations or deviations were identified in one area; one violation was found in one area ( Failure to follow specifications regarding scarifying of smooth fill surfaces prior to placing additional fill -
paragraph 5.b.).
F202050431 820122 PDR ADOCK 05000518 G
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
---
.
..
.
.--
.
..
---
..
.
.
.
i REPORT DETAILS i
1.
Persons Contacted Licensee Employees
- R. T. Hathcote, Project Manager
- W. T. Quinn, Construction Engineer
- H. S. Sheppard, Assistant Construction Engineer
- G. A. Gonsalves, QA Supervisor
- J. W. Davenport, Civil QC Supervisor
- B. E. Huffaker, Materials Engineer QC
- S. D. Love, Regulatory Staff, Chattanooga
- L. E. Wallace, QA Engineer
- B. F. Painter, General Construction Superintendent i
W. Davis, QC Materials Engineer
Other licensee employees contacted included three construction craftsmen, five technicians and two office personnel.
'
NRC Resident Inspector
- J. F. Schapker
,
'
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on November 20, 1981 with those persons indicated in paragraph 1 above.
.
3.
Licensee Action on Previous Inspection Findings
!
Not inspected.
4.
Unresolved Items l
Unresolved items were not identified during this inspection.
5.
Independent Inspection
!
The inspector examined the following areas:
!
a.
Soils and concrete laboratory l
b.
Completed concrete work in the A-1 reactor building c.
Preparation for concrete pour numbers AIC-11E, A1F-29F, and A2D-20A and l
21A
,,
.
-.
,
-
__.,
_
.
. ~....
.
...
- -.
-
..
__
-.. _ _ _ =
-
.. _ _ - -
-
.
._.
..
.
.
.
d.
Backfill operations adjacent to the ERCW pipeline in the area of the A-1 spray pond.
Examination of backfill operations disclosed the following violation.
Specification N6C-875 and its referenced.,pecification G-9, specify that surfaces too smooth for proper bonding shall be scarified before placing-additional fill. Contrary to specification N6C-875 and G-9, on November 19, 1981, during backfill operations adjacent to the ERCW pipeline in the area of the A-1 spray pond, backfill was placed on the smooth surface of the previous lift without any prior scarifying.
The backfill surface had a smooth polished surface as a result of sealing the surface of the last lift of the previous day with tampers.
Failure to scarify earthfill surfaces which were too smooth for bonding was identified to the licensee as Viola-tion Item 50-518/81-20-01.
6.
Containment (Structural Concrete II) - Obeservation of Work, Unit A-2 The inspector observed partial placement of basemat pour number A2R-13 in
,
the Unit A-2 drywell. Acceptance criteria examined by the inspector appear
'
in the following documents.
.
a.
PSAR, Section 3.6 b.
TVA Specification G-2, Plain and Reinforced Concrete c.
C. F. Braun Specification TVA STRIDE
d.
Procedure QCI-C-201 to 218, CEP 9.02 D'rawing numbers Y063, YO65, YO66 and YO67 e.
Preplacement inspection was indicated by the properly signed pour card.
'
Placement of reinforcing steel conformed to drawing and procedure require-ments. Placement activities pertaining to delivery time, free fall, flow
,
distance, layer thickness and consolidation conformed to specifications.
j Activities were continuously monitored by QC personnel.
Samples for temperature, slump, air content, unit weight and test cylinders were made in accordance with procedure requirements.
Examination of the batch plant and stockpiles showed materails were being controlled and that accurate batch plant records were being generated. Post placement inspec-tion showed proper curing was in progress.