WW 3 i W In Reply' Refer To:
Docket:.L50-499/88-24
~
. Houston Lighting & Power Company
.
EATTN:
.J. H. Goldberg,. Group Vice
~
.
President, Nuclear
- P.0; Box'1700'
Houston, Texas 77001 fGentlemen:
,
'
.
1Thank you for your letter of July 12,1988, in response to our letter and lIlo151c'e of Violation dated June 7,1988. We have reviewed your reply and find
.it responsive to the concerns raised in our Notice of Violation. We have-l reviewed the implementation of your corrective actions _ during an inspection and determined that full compliance had been achieved.
Sincerely dignul by, Original
,
G. T h&$O L. J. Callan, Director
Division of Reactor Projects-l
cc:
>
' Houston Lighting & Power Company l
ATTN:
H. A. McBurnett, Manager
Operations Support Licensing
P.O. Box.289 l
. Wadsworth, Texas 77483 i
Houston Lighting & Power Company ATTN:
Gerald.E. Vaughn, Vice President Nuclear Operations
P.O. Box 289 Wadsworth, Texas 77483 l
.
'
Houston Lighting & Power Company
. ATTN:
J. T. Westermeier, General Manager South Texas Project i
,
l
~P.O.' Box 289
Wadsworth, Texas 77483 C:PS/D
/
DfDRP EHoller:ds LJCallan SFI 5/p'89 Sff//89 l
i
- 8906060376 890531 PDR ADOCK 05000499
.l m___
- _ _ _ _ _
_ Pl@C _
_ _ _. _
_J Q
__ _,
____ _-
___ ______-_ -_
__-__
.__.
_ _ _ -
_ _ _. _. - _ _
_ _.
[y
.
L,-
'
ye[ *,,,.
.'
e.
~.,
,
,
r. !
Houston Lighting & Power-2-Company Central Power &' Light Company ATTN:
R. L. Range /R. P. Verret P.O.. Box 2121 Corpus'Christi Texas-78403
'
City of Austin Electric Utility.
ATTN:
R. J. Miner, Chief 0perating
>
Officer 721 Barton Springs Road
-
Newman & Holtzinger,' P.C.
ATTN:
J. R. Newman,~ Esquire 1615 L Street, N.W.
Washington, D.C. '20036 R
Houston Lighting & Power Company ATTN: 'S. L. Rosen P.O.. Box 289-Wadsworth, Texas 77483-Houston Lighting & Power Company ATTN:
R. W. Chewning, Chainnan Nuclear Safety Review Board P.O. Box-289 Wadsworth, Texas. 77483 City Public Service Board-
-ATTN:
R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296 Houston Lighting & Power Company ATTN: Licensing Representative Suite'610 Three Metro Center Bethesda, Maryland 20814
- Texas Radiation Control Program Director bectoDMB(IE01)
bec distrib. by RIV:
.DRP RRI SectionChief(DRP/D)
- MIS System RPB-DRSS Lisa Shea, RM/ALF RIV File R. Bachmann, 0GC RSTS Operator G. Dick, NRR Project Manager (MS:
13-D-18)
Project Engineer (DRP/D)
R. D. Martin
,
_ _ _ _. _ _. _. _ _ _ _ _ _ _
.. _. _ _. _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _
N
_ _ _ _ _ _ _ _ _ _ _ - -
.
A,...
,
The Light
'
.,
company P.O. Box 1700 Houston. Texas 77001 (713) 228 9211 m
Houston Lighting & Power
_.,.
.!! -
.
"j\\\\
'
3.ises
,a I
,
~
July 12, 1988 ST-HL-AE-2710 File No.: G2.4 10CFR2.201 U. S. Nuclear Regulatory Commission Attention: Document Control Desk l
Washington, DC 20555 South Texas Project Electric Generating Station Unit 2 Docket No. STN 50-499 Response to Notice of Violation 8824-03
.
Houston Lighting & Power Company has reviewed Notice of Violation 50-499/8824-03 dated June 7,1988 and submits the attached response pursuant to 10CFR2.201. An extension of the submitted date of this report, to July 22, 1988, was granted by D. M. Hunnicutt on July 7,1988.
If you should have any questions on this matter, please contact Mr.
M. E. Polishak (512) 972-7071.
-
J. H. Goldbe Group Vice President, Nuclear SDP/hg Attachment:
Response to Notice of Violation 8824 03 k
g
-
i t
I L4/NRC/bf l
I A Subsidiary of Houston Industries incorporated
]
A 90
l
, __
__
__
.
- _
- - - - _ _
-
,
t; f
sb
'
'4,
,1,
~
.
S L
Houston Lighting & Power Company
-
- g
.
,
Page 2
- cc:
-,
Regional Administrator, Region IV Rufus S. Scott
,
Nuclear Regulatory Commission Associate General Counsel
!
l611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company'
Arlington.TX 76011 "'
~-
P. O. Box 1700'
Houston, TX 77001
- George F. Dick,' Project Manager U.S. Nuclear Regulatory Commission INPO
' Washington, DC 20555 Records Center
'
1100 circle 75 Parkway-
' Jack E. Bess
.
Atlanta, GA: 30339-3064 Resident Inspector / Operations c/o U.S. Nuclear Regulatory Dr. Joseph M. Hendrie CorJaission 50 Be11 port Lane P. O. Box 910 Be11 port, NY 11713 3ay City,'TX 77414 Don L. Garrison Resident Inspector / Construction c/o U.S. Nuclear Regulatory Commission P. O. Box 910
. Bay City.-TX 77414
J. R. Newman, Esquire
,
Newman & Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 R. L. Range /R. P. Verret
- Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)
Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M T. Hardt
,
City Public Service Board P. O. Box 1771-San Antonio, TX 78296 i
Revised 06/15/88 L4/NRC/bf
-
- _ _ __ _- _ _ _.
c
-
,-
F b+
.
.,av,
..
Attcchmsnt
ST-HL-AE-2710
-
y.
l 4 File No.: G2.4 Page 1 of 2 Response to Notice of Violation 8824-03
_,
'
1. Statement of Violation
!
10 CFR Part 50, Appendix B, Criterion II, Quality Assurance Program, requires that, " Controlled conditions include the use of appropriate equipment; suitable environmental conditions for accomplishing the activity, such as adequate cleanness.
." The licensee is committed'
..
to Regulatory Guide _1.39, and ANSI 45.2.3.
These documents require that activities be performed under suitable conditions of cleanliness.
f Construction Site Procedure (CSP) 12, " General Instruction for-Housekeeping During Construction," Revision 6, dated November 19, 1987, paragraph 8.05.03.01 states, "The work area shall be kept sufficiently clean and orderly that construction activity can proceed *
an efficient manner that will produce and maintain quality in conforma.: ; with specified requirements."
Contrary to the above, during an inspection of Unit 2 Isolation Valve i
Cubicles (IVC) on April 20 and 21, 1988, the "B" IVC was found to be below the minimum acceptable level for cleanliness and general
.
housekeeping cetivities.
Specifically, excessive amounts of construction debris, abandoned tools, and supplies were scattered throughout the "B" IVC.
Excessive quantities of dirt and dust were observed in the cable trays, under the grates, and on the beams and flanges throughout the general area.
II. Reason for the Violation The debris identified consisted of concrete dust, chips and insulation materials resulting from the high level of construction activity present in this area. The root cause for this deficiency was the crafts' failure to adequately protect cable trays and maintain area cleanliness during activities that generate debris, i
III. Corrective Action Taken and Results Achieved Immediately upon notification of the discrepant conditions in the IVC, cleanup was initiated.
Building Superintendents have been directed to pay strict attention to cable tray, components, equipment and area cleanliness, and to take necessary action as required.
Cleanup has been completed in the "B" IVC.
IV. Corrective Steps Taken to Prevent Recurrence i
1.
Building Superintendents have been reinstructed to the requirements of CSP-12, Paragraph 8.05.03: Cleanliness.
L4/NRC/bf
- - _ - - - _
. _ _ _ _ - _ _
_-.
3.
[g
'Ad,$,
L Attachm:nt ST-HL-AE-2710
"
-
>
File No.: G2.4-4-Page 2 of 2 v
2.
Personn41 have been inst'ructed to correct or notify the applicable superini}n$ent sho'uld any cleanliness and general-hensekeeping
~
problem be observed.
In addition, Project Management will provide continuing surveillance.to' ensure adequate levels of housekeeping are maintained.
3.
- Cement Finishers, Laborers and Cc:ntractors involved in activities that generate concrete dust and debris have been verbally instructed regarding the importance and requirements to protect cable trays and equipment during these operations and to maintain clean work areas.
4.
Personnel have been allocated to the building Superintendents to perform required cleanup and maintenance of cable trays during daily:
cleanup activities.
V. Date of Full Campitanco STP is in full compliance at this time.
.
.