Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Repts 50-498/88-82 & 50-499/88-82
ML20236A190
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/09/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8903160460
Download: ML20236A190 (3)


Text

{{#Wiki_filter:..

~-
.. ,
,
. ..
 * .      i
    "
,,I'n: Reply Refer'To:

Dockets:. 50-498/88-82 50-499/88-82 Houston-Lighting &. Power Company- i J. H. Goldberg, Group Vice

       '

ATTN:  ; President, Nuclear P.O. Box 1700 Houston, Texas. 77001 Gentlemen: Thank you for your. letter of February 10, 1989, in response to our letter and Notice of Violation' dated January 13, 1989. -We have reviewed your repl and find it responsive to.the concerns raised in our Notice of Violation. We

   -

will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be

 . maintaine 

Sincerely, ' Original Signed By A. D. Beacli L. J. Callan, Director Division of Reactor. Projects cc: Houston Lighting & Power Company ATTN: M. A. McBurnett, Manager

 < Operations Support Licensing P.O. Box 289
 .Wadsworth, Texas 77483     ,

Houston Lighting & Power Company

 ' ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P.O. Box 289-Wadsworth, Texas 77483
 .(ce's continued)

RIV:FRPS:R FRPS:RPB#A3 C:SEPS:R C:RPB C:RPS/D }d DChaney/ sir LRicketson RBaer BMurray Holler

 /89 s/ 7 /89 /89 /0 /89 '3 /$ /89 $ /g /89 f  8903160460 890309     I (

PDR ADOCK 05000498 L l ! Q PDC .,

      [$b .

E- .!

_ . .

. .
. .

Houston Lighting & Power Company -2-Houston Lighting & Power Company l ATTN: J. T. Westermeier, General Manager South Texas Project P.O. Box 289 Wadsworth, Texas 77483 Central Power & Light Company ATTN: R. L. Range /R. P. Verret P.O. Box 2121 Corpus Christi, Texas 78403 City of Austin Electric Utility ATTN: R. J. Miner, Chief Operating Officer 721 Barton Springs Road Austin, Texas 78704 Newman & Holtzinger, ATTN: J. R. Newman, Esquire 1615 L Street, Washington, D.C. 20036 Houston Lighting & Power Company ATTN: S. L. Rosen P.O. Box 289 Wadsworth, Texas 77483 Houston Lighting & Power Company ATTN: R. W. Chewning, Chairman Nuclear Safety Review Board P.O. Box 289 Wadsworth, Texas 77483 City Public Service Board ATTN: R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296 Houston Lighting & Power Company ATTN: Licensing Representative Suite 610 Three Metro Center Bethesda, Maryland 20814 Texas Radiation Control Program Director

___ _ _

  -  _  __ _ _ _ _ _ _ _
, .

6 4

 -
  .

Houston Lighting and Power Company -3- , i bec to DMB (IE06) bec distrib. by RIV w/ licensee's letter: R. D. Martin, RA DRP . Resident Inspector-OPS i G. L. Constable, Section Chief (DRP/D) RPB-DRSS MIS Syste ! RIV File Lisa Shea, RM/ALF RSTS Operator R. Bachmann, OGC DRS Inspector Section Chief- i B. Murray R. L. Bangart R. E. Hall D. M. Hunnicutt G. Dick, NRR Project Manager

     ,

i l l i l _____ _ _ _ _

.
. .

The Light

'
-
        ,
 .
;
*

COYC!.DRRty* P.O. Box 1700 Houston Texas 77001 (713) 228 9211 Houston Lighting & Power

 ,

Februa 10 1989 ST-HL b-2954 File No: G02.04 10CFR2.201

      . . _ . ;---.--
       ' . *, U. S. Nuclear Regulatory Commission   d Attention: Document Control Desk Washington, D.C. 20555 l {{Bc2lM
      '

I L '

       ,

South Texas Project Electric Generating Station Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Response to Notice of Violation 498/8882-01: 499/8882-01

        .

Houston Lighting and Power Company has reviewed Notice of Violation 498/8882-01; 499/8882-01 dated January 13, 1989, and submits the attached response pursuant to 10CFR2.20 If you should have any questions on this matter, please contact Mr. S. H. Head at (512) 972-839 /// L G.E.Vauqn g Vice President Nuclear Plant Operations

 ,

GEV/PLW/n1 Attachment: Response to Notice of Violation 498/8882-01; 499/8882-01 ' E.89.033.01 A Subsidiary of Houston Industries incorporated

- -b

_ g g.e v x tcty g g 3 ll2

._ _ _ _ _

_

*
.
.
' '

Houston Lighting & Power Company

. ST-HL-AE-2984
'

File No.: G02.04

]     Page 2 l

._ cc Regional Administrator, Region IV Rufus S. Scott i Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 2000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 ) Houston, TX 77001 George Dick, Project Manager

] U. S. Nuclear Regulatory Commission INPO Washington, DC 20555  Records Center 1100 Circle 75 Parkway Jack E. Bess  Atlanta, Ga. 30339-3064 Senior Resident Inspector-Unit I c/o U. S. Nuclear Regulatory Commission Dr. Joseph H. Hendrie P. O. Box 910  50 Bellport Lane Day City, TX 77414  Be11 port, NY 11713 J. I. Tapia Senior Resident Inspector-Unit 2 c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 J. R. Newman, Esquire Newman & Holtzinger, L Street, Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 212'1 Corpus Christi, TX 78403 R. John Miner (2 copies)

Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M. 7. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296

    .

_ Revised 12/21/88 NL.DIST

* -

. .

" '

llouston Lighting a: Power Company SI-HL-AE-2984 . Attachment I Page 1 of 2 j l

South Texas Project Electric Generating Station Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Response to Notice of Violation 498/8882-01; 499/8882-01 Statement of Violation 10 CFR Part 20.408 (b) requires that the licensee notify the NRC of the radiation exposure received by individuals who were employed by the licensee, or who were assigned to work at the licensee's facility and were not employed, and who have terminated employment or work assignmen Such a report shall be furnished within 30 days after the exposure of the individual has been determined by the licensee or 90

,

days after the date of termination of employment or work assignment, , whichever is earlie CFR Part 20.409(b) and 10 CFR Part 19.13 require that when a licennee is required pursuant to 20.408 to report to the NRC any radiation exposure of an individual, the licensee must also notify the individual at a time no later than the NRC is notifie Contrary to the above, the NRC inspectors determined on December 8, 1988, that the licensee had not reported radiation exposure results to the NRC or the affected individuals, for several individuals that had worked for the licensee or were assigned to work at the licensee's facility during the period of July 1987 through August 198 I Houston Lighting & Power Position EL&P concurs that the cited violation occurre II Reason for Violation The root cause of the failure to submit reports of radiation exposure in a timely manner was lack of a consistent method for determining when an individual would no longer be subject to radiological exposure while at the South Texas Project Electric Generating Station (STPEGS).

. NL.89.033 01 _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

r

! ..
( , d'.
\Hounon 1 ighting & Power Company    .

1 ST-HL-AE-2984

*-

Attachment Page 2 of'2-l South Texas Project Electric Generating Station ~ Units 1 and 2 Docket Nos. STN 50-498, STN 50-499-Response to Notice of Violation 498/8882-01: 499/8882-01 I Corrective Action Taken and Results Achieved l In order to ensure that all outstanding notifications of personnel exposure are issued, Reports of Terminating Individual's Occupational Exposure (exposure reports) will be distributed to the NRC and to STFEGS personnel previously issued TLD's if 1) The individual is not listed on the TLD roster as currently possessing a TLD, and 2) The individual's exposure history file indicates that an exposure report.has not been issue Distribution will be completed by March 1, 198 . Corrective Action Taken to Prevent Recurrence P order to prevent recurrence of failure to submit exposure reports in a timely manner,' dosimetry personnel will periodically monitor the activities of personnel assigned TLD's to identify those who no. longer need one. Security badge transactions will be the primary mechanism for determining'that dosimetry is no longer required. Additionally, termination whole body counts and entrance frequency on radiation work { permits will be reviewed. If monitoring results indicate that a TLD is I no longer required for the individual, the individual is removed from the TLD roster. An exposure report is to be processed following removal of an individual from the active TLD roster. Monitoring is to be performed at least monthly. Such monitoring will identify those  ! individuals for whom exposure reports are required whether their job assignment has changed, or their employment at STPEGS has been terminated. Note that an exposure report will be processed upon removal of an individual from the active TLD roster in the required time frame regardless of employment statu . I V Date of Full Compliance

      ,

j Overdue exposure reports will be iden'.ified and distributed by l March 1, 1989. Programmatic changes to prevent recurrence will be } implemented by March 1, 198 NL.89.033.01 }}