O U.S. NUCLEAR REGULATORY COMMISSION
- '
0FFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-483/81-02 License No. CPPR-139
- Docket No. 50-483 Licensee: Union Electric Company P. O. Box 149 St. Louis, MO 63166
. Facili ty:
Callaway, Unit 1
[InspectionAt:'
Callaway Sit', Callaway' County, M0 e
Inspection Conduc ed:
anuary 5-30, 1981'
,
,_
~
g[
' Inspec tor: 1
~
.
Approved By:
~R. C. Knop
-
- [
'1 " Y ~
?
-
Projects Section 1
. Inspection Summary
< Inspection on' January 5-30, 1981 (Report No. 50-483/81-02)
Areas Inspected: Routine inspection by the IE Regional Resident Inspector
~
(RI) of. safety-related construction activitics including protection of the
'
reactor vessel and other: components of.the' nuclear' steam system' supplier;.
(NSSS), work on the.ctrc internal bolting, locking devices;_ material lay down and storage-areas;l electrical work;~ welding of safety _ related ' piping systems;
- nondest'ructive' examination;' weld' rod control; drawing: control; and a' concrete-
. pour.~ This Linspection. involved 76_ inspector hours by one NRC. inspector.-
Results: _ Of' the areas. inspected one' item of noncompliance was -identified.
10 CFR_50,. Appendix B, Criteria'V was violated.in the electrical area, in-
-
that a procedure for. one aspect of work'was not provided and an' existi'ng -
procedural requirement was not-followed.
-
.;
a s
k
.
-
L8f0.40.8_0 M
_
-
ra;.
. -
>
-r
-
l
..
.
.
i
.
DETAILS
.
Persons Contacted Union Electric Company (UE)
.,
- W. H. Weber, Manager Nuclear Construction
- N; E. Doyne, General' Superintendent, Callaway Construction
- R. L. Powers' ' Superintendent of Site Quality Assurance
,
.
- J. Laux, Supervisory: Engineer Quality Assurance Construction C. J. Plows, Quality Assurance Consultant
- S. M; Hogan, Assistant Quality Assurance Engineer
.
. >:
- -
.-Daniel International' Corporation (Daniel).
- H.'J._S'irr, Project Manager n*G.-M.;Stevens,-Construction Manager J:
- A. D. Arnold, Project Quality Manager
- W.11L. Saylor, Assistant Project Electrical Engineer
The inspector;also contacted and interviewed other licensee and contractor
,,
,
]
^ personnel,' including l craftsmen, QA/AC, technical and' engineering staff-members.#
.
,.
,
- Denotes. those attending at least.one of;the exit meetings.
~ Licensee Action on Previous Inspection Findings.
(Closed)~ Noncompliance'(483/80-03-01)land Noncompliance ~(483/80-20-01).
' Welding rod control has Limproved with; the1 actions taken' as a result of J
^
cthe items-of_.nsncompliance. These actions.-includedE(1) training 7essions
--for welders'1(2): surveillance.by. superintendents,1(3) subcontractor welder
,
=
_
, control,-(4) increased surveillance by Inspectors and Engineering Organiza-tion's. Based;on the actions'taken and inspections performed-of the work-areas,:thisfitem_is'closedi
'
)(Closed)1 Noncompliance l(483/80-20-02) 1 Identified that the. control'of tools used on stainless ' steel pipe, plate. and shapes was not performed as re..-
quired by p'ocedures. : Action was taken-to inventory and correctly.markc
-
r q tools.~ Based-oni thelactions completed ~ and. follow-up. inspections performed
-
-
thisLitem is closed.
.
-
,
, [
L it
.{
?'
.
-
,
%
4, i
_
.
-
'
,
..
.-2--
. -
_
.
r
. r
.
(Closed) Unresolved Item (483/80-20-03)
Identified that cadwelding sleeves with vent holes for use in the horizontal position were installed in the vertical position. ERICO Products Company was contacted. The company verified that the sleeves used in either position are the same except for the vent holes. The company verified that the methods used to plug the vent holes when used in the vertical position were satisfactory.
Based on the information from the company, Daniel International Work Procedure WP-118 was changed to define how to use cadweld sleeves in altern-Le positions. Based on the information provided, the item is closed.
Functional or Program Areas Inspected 1.
Plant Tours One or more plant areas were toured several times during the reporting period to observe general construction practices; area cleanliness and storage condition of equipment. piping, and electrical cable.
2.
Drawing Control During the inspection period, six drawings were checked in the Auxiliary Building to determine if drawings of the latest revision were being used in the construction effort. Five drawings in the electrical area and one drawing in the heating ventilation and air conditioning area of work were checked.
It was found that all drawings were of the correct revision and change notices when issued were attached to the drawing.
No items of noncompliance or deviations were identified.
3.
Fabrications of Safety Related Piping Systems During the reporting period, the inspector observed work including a.
handling, protection, inspection, and welding of safety related piping systems.
(1) Feed Water System Welds 2AE-05-F037A (2) Fuel Pool Cooling and Clean-up System Welds
.2EC 02 FW0l6A 2EC 02 FWO18A
^
(3) Residual Heat Removal System Welds 2EJ 02 FW90-2EJ 04 F022A (4) Containment Cooling System Welds
,
2GN C1 FW4-3-
_
.
.
(6) Essential Service Water System Welds 2EF 05 Fo45B (7) High Pressure Coolant Injection System Welds 2EM 01 F011B (8)
Steam Generator Blowdown System Welds BM 03 FWO45A
.
For each of these welds one or more of the following fabrication activities was observed. Handling and protection of piping and partially completed welds was satisfactory. Purge gas was correctly used. The weld area was free of any grease or particles. The joint fit-up dimensions were within procedural requirements and the welders were certified as qualified for the procedure specified to be used-for welding the pipe joint.
No items of noncompliance or deviations were identified.
4.
Piping System Nondestructive Testing
'
During the reporting period the inspector observed nondestructive a.
testing (Liquid Penetrant) of weld 2GN 01 FW13 in the Containment Cooling System.
(1)' The surface of the weld was satisfactory for the performance of liquid penetrant examination.
(2) The nondestructive test assigned met the code requirements.
(3) The technique was satisfactory and was performed by a qualified inspector.
No items of noncompliance or deviations were identified.
5.
Nuclear Steam System Supplier (NSSS) Equipment The inspector observed the inplace storage and protection of a.
NSSS components and piping. The piping assemblies, reactor
. vessel internals, and reactor vessel head is properly stored and protected.
b. LThe inspector observed the welding of a fillet welded locking device for bolts in the upper core internals. The welder was certified qualified for the weld performed.
No items of noncompliance or deviations were identified.
-4-
.,
,
6.
Electrical Cable Installation During the reporting period, the inspector observed work including a.
installation, handling, and protection of electrical cable.
Speci-fica.
ssociated with this electrical cable pull was
"
obser (1) Cable Pull 2238 Cable 1GKI28AA For the pull the following activity was observed:
(1) a pull card was in use, (2) the cable was identified, (3) Quality control inspec-
'
tions were performed and Quality control pernonnel witnessed the pull.
b.
During the reporting period, the inspector obsecved work associated with the following cable terminations:
1NBB02AC 1NBB02AB INBB02AE 4NGB10AB 4 NEB 02AK 4 NEB 02AT 4NEK13AF-1GKH28CA
.The following conditions were observed:
(1) the cables were identified, (2) a work assignment sheet was in use, (3) crimping tools were calibrated,'(4) the person assigned was certified qual' ied to perform terminations, During a review of Deficiency Reports it was noticed that c.
Bachtel Drawing E-01013, Rev. 4 was being referenced as in-structions for repair of electrical cable jacket damage. Although the procedure provided by the drawing appears to be satisfactory, there is no technical evidence to indicate that a cable jacket repaired using the procedure will be returned to its original design characteristics or that qualification testing has been per-formed. Pending review of Bechtel data and/cr test results this will be an unresolved item.
(Item No. 483/81-02-01)
Regarding the cabic jacket repairs, there is also no control to ensure that the proper quality assurance is performed and documented during the repair. There is no procedure to define the craft and quality control personel responsibility, and to document the in-
'
- spections performed.
-5-
~,
-
,
l
.
d.
During tours of the Control and Auxiliary Buildings several areas were identified to the Licensee where safety related cable in cable trays had construction materials and debrie placed on them.
This condition, and areas where violations existed, have been discussed during previous exit meetings. This is in violation of Daniel International Work Procedure WP-303 " Install ation of Wire and Cable".
c.
Paragraphs e and d above are examples of inadequate procedure and failure to follow existing procedures as required by Criterion V of 10 CFR 50, Appendix B.
.
This is an item of Noncompliance (Item No. 483/81-02-02)
7.
Concrete Placement a.
During the reporting period, concrete placement UC510540 of the Ultimate Heat Sink Cooling Tower was observed.
For the placement the following conditions were noted.
(1).The forms were secure, leak tight, and had been wetted prior to the placement.
(2) The preplacement inspection had been completed and was ir order.
(3) Quality Control inspectors were' assigned to each crew in addition to those assigned to perform periodic concrete testing.
(4) Adequate numbers of crews and personnel were assigned to make the placement.
(5) The placement was satisfactory.
No items of noncompliance or' deviations were identified.
8.
Fluid System Penetration Installation The inspector observed welding of penetration weld 2HD03F005. The weld area was free of foreign material and the welders were certified as qualified for the procedure specified.
No items of noncompliance or deviations were identified.
9.
Weldind Rod Control During the reporting period, weld rod issue trailer, outside the Turbine Building, was toured.
It was determined that (1) the records are properly kept; (2) welding materials are properly identified and segre-gated; (3)1 the temperature of the rod ovens is maintained.
No items of. noncompliance or deviations i tre identified.
-6-
o
..
.
Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations.
One unresolved item disclosed during this inspection is discussed in paragraph 6c.
Other Activities The inspector was interviewed by St. Louis Television Channel 5, Environmental Reporter Jennifer Blome on January 30, 198?.
Exit Meetings The resident inspector attended a January 16, 1981 exit meeting conducted by RIII inspector C. Erb.
The inspector met with Licensee representatives (denoted under Persons Contacted) on January 16, 23, and 30, 1981. The inspector summarized the scope and findings of the inspections performed. The Licensee representatives acknowledged the findings reported in previous paragraphs.
-
Attachment:
Preliminary'
Inspection Findings
-
_
-7-