U.S. NUCLEAR REGULATORY C0Fl!ISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report.No. 50-483/81-05 1 Docket No. 50-483 License No. CPPR-139 Licensee: Union Electric Company P. 0. Box 149 St. Louis, MO 63166 Facility Name: Callawau
.at 1
. Inspection At: Callaway Site, Callaway County, M0
'
Inspection Conducted: -March 5
, 1981
_
i
.-(
i{ \\"
3/23/El Inspector:
F. C. Hawkins
~.
t
,-
..
.
DfNf&c:m Approved-By:
C.- C. WilliTms, Chief 3/23/8/
.
~ Plant Systems Section
-
.
Inspection Summary Inspection on !! arch 5-6, 1981 (Report No. 50-483/81-05)
. Areas-Inspected: Reviev of records, observation of completed work, and-
-
discussions with licensee personnel relative to the !.icensee's ongoing
n-activities /to address :the Unit I reactor' building dome concrete imper-fection' issue. The' inspection consisted of 12 onsite inspector-hours.
_
,
Results': : No items of noncompliance or deviations were identified.
,
1-O-a,
O'
@
-
+
^
~
.
,
K
_
s. *
-
/
'y,y-g g1-a--e4+
g p
y
---y--p r
y r--yy cy44y--
t,*-
y-w
-,m e
w-E
--
w -
t
<--
-ce-
-
L
,
DETAILS Persons Contacted Union Electric Company (UE)
- W. H. Weber, Manager - Nuclear Construction D. W. ^ Capone, Manager - Nuclear Engineering 14L I. Doyne, General Superintendent - Construction
- J. V. ~ Laux, Supervising Engineer - Quality Assurance
- W. H. Zvanut, Supervising Engineer - Nuclear Engineering
- K. W. Kuechenmeister, Construction Engineer - Nuclear Construction
- R. Veatch, Assistant Engineer - Quality Assurance Daniel International Corporation (DIC)
J. A. Holland, Engineering Manager
.
. *B. C. Tye, Project Civil Engiceer
- G. M.'Warblow~, Services Manager Other Personnel
- W. A. Hansen, RIII Resident Inspector
.
- Denotes those attending the exit interview.
Reactor Building (Unit 1) Dome' Concrete Imperfections A meeting was held at the'Callaway site on March 5, 1981 to discuss the status of the' licensee's ongoing activities relative to the Unit I reactor building dome -concrete imperfection issue.
(Reference Open Item No.~483/80-30-01.) Those in attendance included NRC RIII and UE represen-
-tatives. Topics discussed during the meeting included the nondestructive concrete test program methodology, program implementation, and the status of the final report.
Following the meeting, a review was conductedL of pertinent nonconformance
' reports and nondestructive concrete testing results.
In process' concrete
- repair activ'ities on the dome were also observed.
During the March 6, 1981 exit-meeting, the RIII inspector stated that final
- resolution of this matter is dependent on the issuance _and subsequent NRC
= review of the; final report. The report is_ presently being prepared by
- Bechtel; Corporation (Gaithersburg Power Division) and its completion is tentatively-scheduled for April 1,1981.
' Exit Interview The inspector, met with staff representatives during and at the conclusion of:the inspection. The inspector summarized the scope of the inspection.
.