IR 05000482/1988200

From kanterella
Jump to navigation Jump to search
Discusses Quality Verification Function Insp Rept 50-482/88-200 on 880916 & Forwards Notice of Violation. Preparation to Discuss Potential Enforcement Finding Noted in Rept & Item from Earlier Insp Rept at Meeting Requested
ML20205C233
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/19/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20205C239 List:
References
NUDOCS 8810260427
Preceding documents:
Download: ML20205C233 (2)


Text

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ -

-

,

a .

In Reply Refer To: OCT I 91988 Docket: STN 50-482/88-200 Wolf Creek Nuc7 ear Operating Corporation ATTN: Bart D. Withers President and Chief Executive Officer P.O. Box 411 Burlington, Xansas 66839 Gentlemen:

This refers to the Quality Verification Function Inspection (QVFI) team inspection conducted during the period June 6-17, 1988. The inspection team findings were documented in NRC Inspection Report 50-482/88-200, dated September 16, 198 Following further evaluation of the potential enforcement findings (PEFs)

ide.itified in the NRC inspection report, it was determined that certain of your -

activities were in violation of NRC requirements. Consequently, you are required to respond to these violations, in writing, in accordance with the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2 Title 10 Code of Federal Regulations. Your response should be based on the specifics contained in the Notice of Violation enclosed with this lette One of the potential enforcement findings of the QVFI report (Item No. 88-200-8) is not included in the appended Notice of Violatio .

Additionally, with respect to potential enforcement finding 88-200-1a, it is stated in the QVFI report that the issue is also addressed in NRC Region IV Inspection Report 50-482/88-19 and will be followed up by Region IV. You are requested to be prepared to discuss all aspects of these two items with Region IV staff at a fu'ure meeting. You will be contacted shortly to arrange a mutually acceptable tirre for the meetin The response directed by this letter and the accompanying Notice is not subject '

to the Paperwork Reduction Act of 1380, PL 96-51 Should you have any questions concerning this inspection, we will be pleased to discuss them with yo '

Sincerely, Odginal Signed By n A. B. Denh L. J. Callan, Director o@8 Division of Reactor Projects $6 Enclosure:

g, Appendix - Notice of Violation i No 38 cc w/ enclosure: (see next page)  !

  • RIV:RI *C:0PS C:PS *D:DRS D:DRP C 53 DRHunter/ld JEGagliardo TStetka JLHilhoan LJCallan "Of ho / /88 / /88 (o/f/88 / /88 W/ti/88
  • previously concurre _ - _ _ - _ .

o .

.

'

. . .

Wolf Creek Nuclear Operating ~ -2-Corporation Wolf-Creek Nuclear Operating Corporation ATTN: Otto Maynard, Manager of Licensing P.O. Box 411 Burlington, Kansas 66839 Wolf Creek Nuclear Operating Corporation ATTN: Gary Boyer Plant Manager P.O. Box 411 Burlington, Kansas 66839 l Kansas Corporation Commission ATTN: Robert D. Elliott, Chief Engineer Fourth Floor. Docking State Office Building Topeka, Kansas 66612-1571

. Kansas Radiation Control Program Director bectoDMB(IE01)

l bec distrib. by RIV:

l

,

l RRI R. D. Martin, RA l SectionChief(DRP/A) DRP RPB-DRSS B. DeFayette, RIII l

RIY File SRI, Callaway, RIII MIS System RSTS Operator l Project Engineer. DRP/A Lisa Shea, RM/ALF P. O'Connor, NRR Project Manager DRS Gary M. Holahan, NRR R. P. Correia. NRR F. C. Hawkins, NRR S. H. Weiss, NRR J. Gagliardo D. Hunter G. Sanborn l

,

l l

l l

l t--