IE Mgt Meeting Rept 50-461/81-19 on 810728.No Noncompliance Noted.Areas Discussed:Preoperational & Routine Operational Insp Program in Radiation Protection & Radwaste Mgt Areas
ML20030C744
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/10/1981
From: Greger L, Miller D, Paul R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20030C743 List:
References
50-461-81-19, NUDOCS 8108280039
Download: ML20030C744 (2)


Text

_

.

.

/

.

U.S. NUCLEAR RECULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

!

Report No. 50-461/81-19 Docket No. 50-461 License No. CPPR-137

'

Licensee:

Illinois Power Company 500 South 27th Street Decatur, IL 61525 Facili.y Name:

Clinton Power Station, Unit 1 Inspection At:

Clinton Site, Clinton, IL

Inspection Conducted: Jul, 28, 1981 Inspectors:

.d),8, M / h E f'D R. A. Paul

/ "

Date i'

.d,i.2,%'df>v e - s-r/

D. E. Miller Date

,

Approved By:

liSW 6 - /6 -8 /

~

L. R. Gre'ger, Acting Chief Date

!

Facilities Radiation

'

Protection Section e

Inspection Sumruary Inspection on July 28, 1981 (Report No. 50-461/21-19)

Areas Inspected: A meeting was held to discuss the preoperational and routine operational inspection program in the radiation protection and radwaste management areas. The inspection involved 14 inspector-hours onsite by two NRC inspectors.

Results: No violations of NRC requirements were identified.

l l

l I

l l

8108280039 810813

,

!

PDR ADOCK 05000461 C

PDR

.

-

. -

- - -

.,-._ _ _.. _.,_ _ _, _ _._ _ _. _

.__ _ _. _ _.. _ _

- -.. _ -

. _. - - -. -.. _ _

..

__

.

..-

_

.-

_

.

.

e

f DETAILS 1.

Persons Present at Management Meeting L. Koch, Vice President T. Plunkett, Plant Manager L. Brodsky, Assistant Plant Manager B. Harris, Rad / Chem Supervisor E. Hickman, Supervisor, Radiation Protection D. Tucker, Compliance Supervisor

,

H. Livermore, Senier Resident Inspector 2.

Initial Management Meeting

i

).

This initial management meeting, which began at 9:00 a.m. on July 25,-

1981, was conducted to discuss with the licensee the following matters:

a.

The NRC function and inspection program in the radiation protection and radwaste management areas, including the performance of unannounced inspections, methods of taking enforcement action and the conduct of management interviews.

'

b.

The need for an effective audit and management controls program.

'

c.

The preoperational testing program for radwaste systems and

'

monitors, and tr a inspector's function in reviewing the program.

d.

The radiation protection program, and areas which will be reviewed by the inspectors before issuance of an operating license.