August 19, 2025
SUBJECT:
UPDATED INSPECTION PLAN FOR RIVER BEND STATION (REPORT 05000458/2025005)
Dear Phil Hansett:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for River Bend Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. As discussed in SECY 25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at 817-200-1148 with any questions you have regarding this letter.
Sincerely, Douglas E. Dodson II, Chief, Projects Branch C Division of Operating Reactor Safety Docket No. 05000458 License No. NPF47 Enclosure:
Inspection Plan cc w/encl: Distribution via LISTSERV Signed by Dodson, Douglas on 08/19/25 UPDATED INSPECTION PLAN FOR RIVER BEND STATION (REPORT 05000458/2025005)
DATED - AUGUST 19, 2025 DISTRIBUTION:
JMonninger, ORA GMiller, DORS NTaylor, DORS DCylkowski, RC TSteadham, RIV/OEDO VDricks, ORA TSmith, ORA LWilkins, OCA JDrake, NRR AMoreno, RIV/OCA RAlexander, RSLO DDodson, DORS RKumana, DORS ABetts, DORS DOuk, DORS EPowell, DORS LDay, DORS R4-DORS-IPAT R4Enforcement RClagg, RIV/OEDO AMoreno, RIV/OCA PMcKenna, DRO, NRR JPelton, DORL, NRR ARivera-Varona, DORL, NRR MWaters, DPR, NSIR TInverso, DSO, NSIR TNakanishi, DORL, NRR ROP Assessment DOCUMENT NAME: UPDATED INSPECTION PLAN FOR RIVER BEND STATION (REPORT 05000458/2025005)
ADAMS Accession Number: ML25227A220
SUNSI Review RJK
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE SPE:DORS/PBC BC:DORS/PBC NAME RKumana DDodson SIGNATURE
/RA/
/RA/
DATE 08/18/25 08/19/25 OFFICAL RECORD COPY
Site Inspection Activity Plan River Bend 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)
1 5/12/2025 8/8/2025 IP 71153 001341 Follow Up of Events and Notices of Enforcement Discretion EP 2025 Program Inspection - RBS
1 7/14/2025 7/18/2025 IP 71114.02 000717 Alert and Notification System Testing
7/14/2025 7/18/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
7/14/2025 7/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
7/14/2025 7/18/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
7/14/2025 7/18/2025 IP 71151 001397 Performance Indicator Verification Resident Baseline Inspection 3Q 2025 - RBS
1 7/14/2025 7/18/2025 IP 92723 000914 Follow-Up Inspection for One Severity Level III and Two Severity Level IV Traditional Enforcement Violations or for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period RP 5,8 - RBS
1 8/4/2025 8/8/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
8/4/2025 8/8/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Age-Related Degradation Inspection - River Bend Station
1 9/8/2025 9/12/2025 IP 71111.21N.04 001832 Age-Related Degradation
9/22/2025 9/26/2025 IP 71111.21N.04 001832 Age-Related Degradation CyberSecurity - RBS
1 9/28/2025 10/3/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - RB
1 9/29/2025 10/3/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
10/20/2025 10/24/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RBS 2025 INITIAL EXAM
1 10/19/2025 10/25/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
11/16/2025 11/22/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
1 2/2/2026 2/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2/2/2026 2/6/2026 IP 71124.04 000728 Occupational Dose Assessment
2/2/2026 2/6/2026 IP 71151 000746 Performance Indicator Verification Fire Protection Inspection - RBS
1 2/23/2026 3/6/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Security 71130.02/.04/.05
Prepared on 8/13/2025 1:32:11 PM 1 of 4
Site Inspection Activity Plan
4/6/2026 4/10/2026 IP 71130.02 000734 Access Control
4/6/2026 4/10/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
4/6/2026 4/10/2026 IP 71130.05 000737 Protective Strategy Evaluation
4/6/2026 4/10/2026 IP 71130.09 001656 Security Plan Changes
4/6/2026 4/10/2026 IP 71130.14 000743 Review of Power Reactor Target Sets
4/6/2026 4/10/2026 IP 71151 001338 Performance Indicator Verification EP Exercise & PI Inspection (2026) - RBS
1 6/22/2026 6/26/2026 IP 71114.01 000716 Exercise Evaluation
6/22/2026 6/26/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
6/22/2026 6/26/2026 IP 71151 001397 Performance Indicator Verification RBS 2026 BRQ
1 8/30/2026 9/5/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RBS 2026 INITIAL EXAM
1 10/18/2026 10/24/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
11/29/2026 12/5/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection-RBS
1 2/22/2027 2/27/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 3/1/2027 3/5/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3/1/2027 3/5/2027 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
3/1/2027 3/5/2027 IP 71151 000746 Performance Indicator Verification 2027 Problem Identification and Resolution Inspection - River Bend
1 5/10/2027 5/14/2027 IP 71152B 000747 Problem Identification and Resolution
5/24/2027 5/28/2027 IP 71152B 000747 Problem Identification and Resolution Security 71130.02/.07/.08
1 5/17/2027 5/21/2027 IP 71130.02 000734 Access Control
5/17/2027 5/21/2027 IP 71130.07 000739 Security Training
5/17/2027 5/21/2027 IP 71130.08 000740 Fitness-For-Duty Program
5/17/2027 5/21/2027 IP 71130.09 001656 Security Plan Changes
5/17/2027 5/21/2027 IP 71151 001338 Performance Indicator Verification MC&A - RBS
1 5/17/2027 5/21/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)
EP Program & PI Inspection (2027) - RBS
1 6/14/2027 6/18/2027 IP 71114.02 000717 Alert and Notification System Testing
6/14/2027 6/18/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
6/14/2027 6/18/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Prepared on 8/13/2025 1:32:11 PM 2 of 4
Site Inspection Activity Plan
6/14/2027 6/18/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness
6/14/2027 6/18/2027 IP 71151 001397 Performance Indicator Verification Prepared on 8/13/2025 1:32:11 PM 3 of 4
Site Inspection Activity Plan River Bend 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count River Bend ISFSI FW Transition and Triennial Loading Inspection (dry run, 72.212, loading) (multiple weeks, TBD)
6/1/2026 7/31/2026 IP 60854 001000 Preoperational Testing Of An ISFSI 6/1/2026 7/31/2026 IP 60855 001001 Operation Of An ISFSI 6/1/2026 7/31/2026 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations Prepared on 8/13/2025 1:32:11 PM 4 of 4