Security Baseline Inspection Report 05000458/2025420
ML26048A441
Person / Time
Site: River Bend 
Issue date: 02/18/2026
From: Clark J
Security Performance Evaluation Branch
To: Dinelli J
Entergy Operations
Shared Package
ML26048A429 List:
References
ML26048A429 IR 2025420
Download: ML26048A441 (0)


Text

SUBJECT:

RIVER BEND STATION, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000458/2025420

Dear John Dinelli:

On January 29, 2026, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station, Unit 1 and discussed the results of this inspection with Philip Hansett, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000458 License No. NPF-47

Enclosure:

As stated

Inspection Report

Docket Number:

05000458

License Number:

NPF-47

Report Number:

05000458/2025420

Enterprise Identifier:

I-2025-420-0016

Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station, Unit 1

Location:

St. Francisville, Louisiana

Inspection Dates:

September 29, 2025, to January 29, 2026

Inspectors:

D. Bradfield, Team Leader, NSIR

J. Allen, Physical Security Inspector, RIV

P. Negrete, Physical Security Inspector, NSIR

A. Woyansky, Senior Physical Security Inspector, NSIR

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. One NRC-evaluated FOF exercise was conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126206.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 29, 2026, the inspectors presented the security baseline inspection results to Philip Hansett, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-HQN-2026-

00064

01/28/2026

CR-HQN-2026-

00065

01/28/2026

CR-RBS-2026-

231

01/20/2026

Corrective Action

Documents

Resulting from

Inspection

CR-RBS-2026-

00379

01/28/2026

EN-NS-215

Conduct of Security Force Exercises and Drills

Revision 22,

04/04/2025

EN-NS-215-01

Tactical Response Drills

Revision 0,

01/15/2020

EN-NS-215-03

Triennial Force-on-Force Exercises

Revision 01,

04/04/2025

EN-NS-216

Controller Responsibilities Guidelines

Revision 14,

07/17/2025

EN-NS-225

Multiple Integrated Laser Engagement System

Revision 3,

11/04/2021

EN-NS-234

Force-on-Force Mock Adversary Program

Revision,

07/28/2021

SDI-015

Legal Authority - Security Department Instruction

Revision 3,

04/27/2011

SGI-RBS-2021-64

River Bend Station - Physical Security, Safeguards

Contingency and Training & Qualification Plan

Revision 15,

2/20/2021

SGI-RBS-2025-11

RBS Critical Target Sets

Revision 12,

06/18/2025

71130.03

Procedures

SPI-33

Response Position

Revision 22,

04/26/2022

ML26048A429; ML26048A441

OFFICE

NSIR/DSO/SPEB/ETA R-IV/DRSS/PSB

NSIR/DSO/SPEB

/ETC

NSIR/DSO/SPEB

/ETA

NAME

AWoyansky

JAllen

DBradfield

JClark

DATE

Feb 18, 2026

Feb 18, 2026

Feb 18, 2026

Feb 18, 2026