Insp Rept 50-455/87-17 on 870428-0501.No Violations Noted. Major Areas Inspected:Qa Program for Startup & Power Ascension Testing Utilizing Insp Procedures 35501 & 41400
ML20215L659
Person / Time
Site: Byron Constellation icon.png
Issue date: 05/07/1987
From: Jablonski F, Reynolds S, Walker H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20215L625 List:
References
50-455-87-17, NUDOCS 8705120317
Download: ML20215L659 (4)


Text

. _. _ _ _ _ - _ _

- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

__

_ _ -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

.

!

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No.:

50-455/87017 Docket No.:

50-455 License No. NPF-66 Licensee: Comonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Byron Station, Unit 2 Inspection At: Byron Site, Byron, IL Inspection Conducted: April 28-May 1, 1987 Inspectors:

S. A. Reynolds J #,k

9/s/67

.

&H~

H. A. Walker 5/7//7

'

Date Approved By

. J. Jablonski, Chief f/7//7 Quality Assurance Programs Section Da te Inspection Sumary Inspection on April 28 through May 1, 1987 (Report No. 50-455/87017(DRS))

l Areas Inspected: Routine, announced inspection of licensee's QA program for startup and power ascension testing. This inspection was conducted utilizing inspection procedures 35501 and 41400.

Results: No violations or deviations were identified.

l

i i

8705120317 870507 PDR ADOCK 05000455 i

G PDR

- -

- -

-

-

-

.

DETAILS 1.

Persons Contacted

  • R. Ward, Services Superintendent
  • A. 8ritton, Quality Assurance Inspector W. 8urkamper, Quality Assurance Superintendent
  • E. Falb, Unit 2 Testing Supervisor S. Nosko, Quality Assurance Engineer
  • W. Pirnat, Regulatory Assurance R. Plentewicz, Production Superintendent
  • H. Snow, Regulatory Assurance Supervisor
  • R. Tuetken, Assistant Project Manager
  • Indicates those attending the exit meeting Hay 1,1987.

Other individuals were contacted as a matter of course during this inspection.

2.

Areas Ir.spected The purpose of this inspection was to review the licensee's QA program for startup and power ascension testing. Additionally, the effectiveness of licensee mananement involvement and control, staffing, and training and qualificatiuns of QA personnel was evaluated. The inspection was performed by reviewing documents and records and interviewing personnel, a.

QA for the Startup Test Program (35501)

(1) Reference Documents (a) Byron Station Quality Assurance Surveillances

  • QAS 06-86-655, "Startup Test 2.51.81A" QAS 06-86-658, "Startup Test 2.32.80"
  • QAS 06-86-689, "Startup Test 2.32.82"
  • QAS 06-86-690, "Startup Test 2.32.82"
  • QAS 06-86-713. "Startup Test 2.61.82"
  • QAS 06-86-792, "Startup Test 2.64.81"
  • QAS 06-87-10, "Startup Test 2.52.84"
  • QAS 06-87-21, "Startup Test 2.47.80"

" QAS 06-87-62, "Startup Test 2.34.81" QAS 06-87-83, "Startup Test 2.34.80A"

  • QAS 06-87-84, "Startup Test 2.99.80"
  • QAS 06-87-105, "Startup Test 2.34.81" QAS 06-87-106, "Startup Test 2.99.80"
  • QAS 06-87-107, "Startup Test 2.47.82C"

-

-

.

(b) Quality Assurance Startup Audits

  • QAA 06-86-2.52.81A, " Execution of Startup Test 2.52.81A -

Core Loading Temporary Instrumentation"

  • QAA 06-87-2.45.81, " Execution of Startup Test 2.45.81 -

Incore Flux Mapping"

  • QAA 06-87-2.64.82, " Execution of Startup Test 2.64.82 -

Rod Control System Checkout"

  • QAA 06-87-2.64.85, " Execution of Startup Test 2.64.85 -

Rod Control"

  • QAA 06-87-2.93.80, " Execution of Startup Test 2.93.80 -

Heat Capacity Verification For Primary Containment Ventilation System" (2)

Inspection Results (a) The inspectors reviewed six audits and fourteen surveillances of various startup and power ascension tests. The audits and surveillances were adequately performed and documented.

The inspectors noted a few minor omissions and incomplete notations on audit and surveillance checklists; however, these concerns were adequately handled and resolved. The inspectors have no further concerns in this area.

(b) The inspectors noted that several startup test packages had not been reviewed by Production Engineering Department (PED);

some of the tests were completed in January,1987. The inspectors were concerned as to the timeliness of this review since the completion of these reviews was not delaying ascension to the next power level. This was discussed with the licensee and the licensee stated that it would be reviewed.

b.

Non-Licensed Staff Training (41400)

The inspectors reviewed station QA qualifications records for five lead auditors and detennined that the five lead auditors met requirements of ANSI N45.2.23, " Qualification of QA Prograra Audit Personnel for Nuclear Power Plants". The training records for the five auditors were reviewed and appeared to be adequate. The backup documents provided with the records generally provided sufficient objective evidence to support the auditor qualifications.

The inspectors concluded that licensee management was involved in assuring quality for startup and power ascension testing. The number of auditors was adequate and the training appeared to contribute to an understanding of the work performed.

No violations or deviations were identified.

.

. _....-.

- __

. _

. _

__..

..

..

3.-

Exit Interview

,

The inspectors met with licensee representatives (denoted in Paragraph 1)

on May 1,1987, and summarized the purpose, scope and findings of.the inspection. The inspectors discussed the likely informational content -

of the inspection report with regard to documents or processes reviewed by the inspectors during the inspection. The licensee did not identify any such documents or processes as. proprietary.

,