IR 05000445/1989006

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insps 50-445/89-06,50-445/89-12, 50-446/89-06 & 50-446/89-12.NRC Continues to Believe That Finding Re Violation 445/8912-V-02 Appropriate
ML20247N088
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/31/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8906050242
Download: ML20247N088 (3)


Text

N ji

'

s, v

'

,

,.

'

lP. '

}

MAY 31 1989 InLReply Refer-To:

u Dockets:

50-445/89-06;!50-446/89-06

~50-445/89-12; 50-446/89-12 Mr. W.JJ. Cahill

.

>

Executive Vice President'

TU Electric y

a'

400 North Olive Street,' Lock Box 81

-Dallas,. Texas -75201 i

Gentlemen:

Thank you for your letter dated April 24, 1984 in response to our

f letters dated February 28, 1989, and March 24,-1989.

We have reviewed your responses to violations 445/8912-V-01, 445/8906-V-02,.

.!

'

L and 445/8912-V-03 and find them responsive to the concerns raised.

,

in the Notices of' Violation.

We will review the implementation of j

your corrective actions during future inspections to determine that-j

' full compliance has been achieved and will be maintained.

l We, note.that you disagree.with'our finding of a violation, l

445/8912-V-02, of Criterion III of 10 CFR 50, Appendix B regarding design' control procedures.

We continue to believe-that, in this instance, a citation against Criterion III is appropriate.

We'have

'

not been: assured that the favorable results of the calculation were not.merely fortuitous, rather.than a result.of effective design

!

controls...However, we have reviewed 1the proposed corrective.

i actions presented:as a result of this finding and conclude'that'

l they adequately address the stated concern.

We will continue to l

monitor the effectiveness of your-corrective actions during future inspections.

Sincerely, OIi1GINN' SIGNED BY R. F. WAICTCP

L L

R. F. Warnick, Assistant Director for Inspection Programs

)

Comanche Peak Project Division

.

'

Office of Nuclear Reactor Regulation

cc:

(See attached)

IP:CPPD:NRR IP:CPPD:NRR AD:IP:CPPD:NRR I

Livermore RWarnickRAM)

l gIPStanish

_ 5/43/89 5/lS/89 5/S/ /89

.I

!

'!

!

l 8906050242 890531 P'

370/

,

-

PDR ADOCK 05000445 I

Q PDC

'i l

.

.

--

- -- _-

--

~~

R

$-

'. #gp * * c g

o

'

N UNITED STATES

'g

,J 8l '

NUCLEAR REGULATORY COMMISSION

,,

$

E; WASHINGTON, D. C. 20555

\\...../

MAY 31 1989

.In Reply Refer To:-

Dockets:

50-445/89-06; 50-446/89-06 50-445/89-12; 50-446/89-12 Mr. W. J. Cahill Executive Vice President TU Electric 400 North Olive Street, Lock Box 81

' Dallas, Texas 75201 Gentlemen:

'Thank you for your letter dated April 24, 1984 in response to our letters dated February 28, 1989, and March 24, 1989.

We have.

reviewed your responses to violations 445/8912-V-01, 445/8906-V-02, and 445/8912-V-03 and find them responsive to the concerns raised in the Notices of Violation.

We will review the implementation of your corrective actions during future inspections to determine that full compliance has been achieved and.will be maintained.

We, note that you disagree with our finding of a violation, 445/8912-V-02, of criterion III of 10 CFR 50,' Appendix B regarding design control procedures.

We continue to believe that, in.this instance, a citation against criterion III is appropriate.

We have

.not been assured that the favorable results of the calculation were-not merely fortuitous, rather than a. result of effective design controls..

However, we have reviewed the proposed corrective actions presented as a result of this finding and conclude that they adequately address the stated concern.

We will continue to

. monitor the effectiveness.of your corrective actions during future inspections.

Sincerely,

$fharttbb?

R. F. Warnick, Assistant Director for Inspection Programs Comanche Peak Project Division Office of Nuclear Reactor Regulation ec:

(See attached)

. - _.

--

_

_ _ _ _ - _ _ _ _ _ _

'

.

.

.

,

W. J. Cchill

-

cc:

Roger D. Walker TU Electric Manager, Nuclear Licensing c/o Bethesda Licensing TU Electric 3 Metro Center, Suite 610 Skyway Tower Bethesda, Maryland 20814 400 North Olive Street, L.B.

Dallas, TX 75201 E. F. Ottney P. O. Box 1777 Juanita Ellis Glen Rose, Texas 76043 President - CASE 1426 South Polk Street Joseph F. Fulbright Dallas, TX 75224 Fulbright & Jaworski 1301 McKinney Street Susan M. Theisen Houston, Texas 77010 Assistant Attorney General Environmental Protection Division George A. Parker, Chairman P.O. Box 12548, Capitol Station Public Utility Committee Austin, TX 78711-1548 Senior Citizens Alliance of Tarrant County, Inc.

GDS Associates, Inc.

6048 Wonder Drive 1850 Parkway Place, Suite 720 Fort Worth, Texas 76133 Marietta, GA 30067-8237 Lanny A. Sinkin Christic Institute 1324 N. Capitol Street Washington, DC 20002 Ms. Billie Pirner Garde, Esq.

Garde Law Office 104 East Wisconsin Avenue Appleton, WI 54911 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 William A. Burchette, Esq.

Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert & Rothwell 1025 Thomas Jefferson St.,

NW Washington, DC 20007

-. - _ - -.. _ _ _ _.

_

_

_