Partially Withheld Insp Repts 50-445/89-70 & 50-446/89-70 on 890905-08 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program, Including Access Control of Personnel & Packages
ML19325E539
Person / Time
Site: Comanche Peak  
Issue date: 10/20/1989
From: Earnest A, Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19325E530 List:
References
50-445-89-70, 50-446-89-70, NUDOCS 8911070358
Download: ML19325E539 (1)


Text

_ _ _.

.

$-.3

.

,o-

e APPENDIX U.S. NUCLEAR REGULATORY COMMIS$10N

REGION IV

NRC Inspection Report:

50-445/89-70 Construction Permits:

CPPR-126

'

50-446/89-70 CPPR-127 Dockets:

50-445

-

I 50-446 Applicant: TV Electric t

400 North Olive, L.B. 81 i

Dallas, Texas 75201

Facility Name:

Comanche Peak Steam Electric Station (CPSES)

Inspecticn At:

CPSES, Glen Rose, Texas l

,

'

j Inspection Conducted:

Septemb

.-8, 1989

!

l

,/

Inspector:

j h

/8

/

[

A. B. EJLrnes't! Physical Security Specialist Date Security and Emergency Preparedness Section

.

M Approved:

'##

r Dr. D. A. Powers, Chief, Security anc Emergency Date s

Preparedness Section

Inspection Summary

'

,

inspection Conducted September 5-8, 1989 (Report 50-445/89-70)

l

'

Areas Inspected:

Routine, announced inspection of the applicant's physical security program. The areas inspected within the physical security program includoc access control of personnel and packages and the Physical Security

Plan'and implementing procedures.

Results: Within the program areas inspected, no violations or deviations were

'icentified.

.

The problem areas identified in this report can mostly be attributed to the l

large number of personnel onsite to complete the construction of the plant.

This creates pressure on the security officers to quickly process personnel,