e APPENDIX U.S. NUCLEAR REGULATORY COMMIS$10N
REGION IV
NRC Inspection Report:
50-445/89-70 Construction Permits:
CPPR-126
'
50-446/89-70 CPPR-127 Dockets:
50-445
-
I 50-446 Applicant: TV Electric t
400 North Olive, L.B. 81 i
Dallas, Texas 75201
Facility Name:
Comanche Peak Steam Electric Station (CPSES)
Inspecticn At:
,
'
j Inspection Conducted:
Septemb
.-8, 1989
!
l
,/
Inspector:
j h
/8
/
[
A. B. EJLrnes't! Physical Security Specialist Date Security and Emergency Preparedness Section
.
M Approved:
'##
r Dr. D. A. Powers, Chief, Security anc Emergency Date s
Preparedness Section
Inspection Summary
'
,
inspection Conducted September 5-8, 1989 (Report 50-445/89-70)
l
'
Areas Inspected:
Routine, announced inspection of the applicant's physical security program. The areas inspected within the physical security program includoc access control of personnel and packages and the Physical Security
Plan'and implementing procedures.
Results: Within the program areas inspected, no violations or deviations were
'icentified.
.
The problem areas identified in this report can mostly be attributed to the l
large number of personnel onsite to complete the construction of the plant.
This creates pressure on the security officers to quickly process personnel,