Text
(
,
.
.
.
I
O
DOCUMENT CONTAINS
i
-
0g 9 71999
DOS INF0Rgryjoy
i.
In Reply Refer To:
Dockets: 50-445/89-70
'
.
50-446/89-70
TU Electric
ATTN:
W. J. Cahill, Jr. , Executive
Vice President, Nuclear
t
Skyway Tower
400 North Olive, L.B. 81
Dallas, Texas 75201
Gentlemen:
Tht
refers to the inspection conducted by Mr. A. B. Earnest of this office
during the period September 5-8, 1989, of activities authorized by NRC
Construction Permits CPPR-126 and CFPR-127 (Units I and 2) for the Comanche
Peak Steam Electric Station, and to the discussion of our findings with members
of your staff at the conclusion of the inspection.
The inspection reviewed certain areas of your physical security program.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspector. The inspection findings are documented in the
enclosed inspection report.
The significant problem area discussed in this
report relates to the large number of construction personnel onsite. The large
construction force creates a workload upon the security force that is not
manageable. As an example of this undue workload, we noted that during the
week of this inspection, over 140 vehicles were entering the protected area
each day. Many of these vehicles were not being searched.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
- The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will ng be placed in the Public Document Room.
8911070350 091027
ADOCK 05000445
0
PNV
DAPowe[rs
C:SEPS
' 0:DR$$
- NRR
RIV:SEPS
fABBeac@
RFWarnick
- ABEarnest:jt
10/12/89
/0 /20/89
10/p /89 f
10/12/89
- See previous concurrence.
i
ENCLOSURE CONTAINS
DOCUMENT CONTAINS
SAFEGUARDS INFORMAil0N
-
,
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
L t O. /
- ,
_
_ _ - .
.
.
!
TU Electric-
2
i
f
- (
!
,
Should you have any questions concerning this inspection, we will be pleased to
l
discuss them with you.
r
Sincerely,
i
\\N)E
.'
j
'
R. F. Warnick, Assistant Directer
'
for Inspection Programs
Comanche Peak Project Division
Office of Nuclear Reactor Regulation
'
Enclosure-
Appendix - NRC Inspection Report
50-445/89-70
50-446/89-70
l
,
cc w/ summary page only:
TU Electric
ATTN:
Roger D. Walker, Manager,
Nuclear Licensing
Skyway Tower
-
400 North Olive Street, L.B. 81
Dallas, TX 75201
i
i
Juanita Ellis
,
President - CASE
1426 South Polk Street
'
Dallas, TX 75224
i
!
GDS Associates. Inc.
i
Suite 720
1850 Parkway Place
Marietta, GA 30067-8237
'
i
Billie Pirner Garde, Esq.
Robinson, Robinson, e'.. al.
-
!
103 East College Avenue
Appleton, WI 54911
l
TV Electric
i
Bethesda Licensing
I
3 Metro Center, Suite 610
Bethesda, MD 20814
!
,
ENCLOSURE CONTAlltS
SAJEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
.,
. _ -
. m.
_
, _ _ _ .
.-
. -
,
\\ \\t
f
TV Electric
3
!
.t
l
!
Heron, Burchette, Ruckert, & Rothwell
l
,
ATTN: . William A. Burchette Esq.
j
'
Counsel for Tex-La Electric
t
Cooperative of Texas
!
. 1025 Thomas Jefferson St., N.W.
'
Washington, DC 20007
!
E. F. Ottney
i
P.O. Box 1777
l
Glen Rose, TX 76043
i
.
'
Newman & Holtzinger, P..C.
ATTN: Jack R. Newman, Esq.
[
1615 L. Street, N.W.
!
!
Suite 2000
l
Washington, DC 20036
.
Texas Department of Labor & Standards
!
ATTN:
G. R. Bynog, Program Manager /
!
Chief Inspector
t
Boiler Division
!
'
P.O. Box 12157, Capitol Station
Austin, TX 78711
i
Honorable George Crump
County Judge
!
Glen Rose, TX 76043
j
Texa5 Radiation Control Program Director
,
i
bec copy of entire report:
RIV Security File
P, A. Starcher, RSGB/NRR
l
R. D. Martin, RA
!
B. Beach .DRSS
l
R. F. Warnick, AD:CPPD:0SP
i
^
Section Chief, SEPS
'
Security Inspector
,
Resident Inspector
!
SEPS File
G. F. Sanborn, E0
i
,
bec copy of letter and inspection summary only w/766:
RIV File
!
MIS
Lisa Shea, RM/ALF
i
'RSTS Operator
Site Reading
J. Wiebe
J. Livermore
C. Vandenburgh
ENCLOSURE CONTAINS
SAFEGUARDS INf0RMAil0N
UPON SEPARAil0H THIS
PAGE IS DECONTROLLED
-
_ . _ _ .
=
,
.
s.
.
TV Electric
4
bec copy of letter and inspection summary only w/out 766:
-
DMB IE-04
>
5. Ebneter/J. Axelrad
A. Vietti-Cook
F. Miraglia
J. Partlow
J.. Taylor
C. Grimes
i
J. Lyons
M. Malloy
.,
E. Jordan
B. Hayes
,
J. Gilliland
P.14c Kee
l
J. Moore OGC
ADSP Reading (Mail 7-D-24)
.
CPPD Reading (HQ) (Mail 7-H-17)
LPDR CPPD-LA
i
J. Wilson
M, Fields
,
D. Crutchfield
B. Grimes
t
!
t
t
?
!
,
!
I
'
!
i
!
!
!
I
!
I
l
'
!
.
!
r
i
r
ENCLOSURE CONTAINS
MiFEGUARDS INFORMATION
t
UPON SEPARATION THIS
-
PAGE IS DECONTROLLED