- _ _ _ _ _ _
~
{Q&p/ f k
.
' pa r.
uni RED STATES
.
,f
'o NUCLEAR REGULATORY Cci.1 MISSION
'#
n
REGION IV
)[*
}{
$
611 RYAN PLAZA DRIVE,SulTE 1000
.
Y f
%,
<
f
.
- "*
June 30,1978
'In Reply Refer To:
RIV D:cket flo. 50-445/Rpt. 78-11
'
50-446/Rpt. 78-11
,
.
-
i
!
Texas Utilities Generating Company
.
ATTil:
Mr. R. J. Gary, Executive Vice
President and General Manager 2001 Bryan Tower
'
Dallas, Texas 75201 y
Gentlemen:
This refers to the inspection conducted by tir. R. G. Taylor of our staff during the period June 20-23, 1978, of activities authorized by ilRC Con-
'
struction Permit t;os. CPPR-126-and 127 for Comanche Peak facility, Units
!!o.1 and 2, and to the discussion of our findings with Mr. J. B. George and other members of your staff at the conclusion of the inspection.
-
.=
Areas examined during the inspection and our findin's are discussed ir.
g the enclosed inspec'tiori report. Uithin these area's, the inspection con-sisted of selective examination of procedures and representative records, l
interviews with personnel, and observations by the inspector.
l During the inspection, it was found that certain activities under your license appear to be in noncompliance with Appendix B to 10 CFR 50 of the.tlRC Regulations, " Quality Assurance Criteria for liuclear Power Plants." The item of noncompliance and references to the pertinent
-
. requirements are identified in the enclosed riotice of Violation.
-
We' have also examined actions-you have taken with regard to previously l
identified, inspection findings.
The status of these items is identified in paragraph 2 of the enclosed report.
~
This notice is sent to yo'u pursuant to the provisions of Section 2.201
. of the t1RC's " Rules of Practice," Part 2, Title 10, Code of Federal
'
Regulations.
Section 2.201 requires you.to submit to this office, with-in 30 days of your receipt of this ' notice, a written statement or expla-nation in reply including: (1)_ corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken-
,
to avoid further noncompliance; and (3) the date when full compliance will be achieved.
,
- IN
-
-
~~
ge150
~
-
.
9
.
-
"
. 1 7,
~
n a
,,
/ Texas Utilities Ger.arating Co.
-2-June 30, 1978 In accordance with Section 2.790 of the ilRC's " Rules of Practice," Part
'
2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the f;RC's Public Document Room.
If the report contains any information thac you believe to be proprietary, it is necessary that you submit a written application to this office, within 20 days of the date of this letter, requesting that
,
such information be withheld from public disclosure. The application must include a full statement of the reasons why it is claimed that the
information is proprietary.
The application should be prepared so that i
any proprictvy information identified is contained in an enclosure to
~
the application. since the application without the enclosure will also be placad in the Public Document Room.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
'
pleased to discuss them with you.
.
Sincerely,
-
-
<
.
~ ~ ~
, I. C. Seidle, Chief
.
Reactor Construction and Engineeri.ng Support Branch Enclosures:
'
1.
Appendix A, llotice of Violation 2.
IE Inspection Rep.ct flo. 50-445/78-11 50-446/78-11
-
cc: w/ enclosures Texas Utilities Generating Company ATTil:
11r. H. C. Schmidt, P.roject Manager
'
2001 Bryan Tower Dallas, Texas 75201
.
..
.
.
(.I.}
~
-
.