Forwards IE Insp Repts 50-445/73-02 & 50-446/73-02 on 731203-06 & Notice of Violation
ML19344F270
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/07/1974
From: Howard E
US ATOMIC ENERGY COMMISSION (AEC)
To: Brittain P
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19344F268 List:
References
NUDOCS 8009150050
Download: ML19344F270 (2)


Text

--

O

%v 8

O O

M d,=

. ff ch UNITED ST/ ~ dS

.. T3.53.)

ATOMIC ENERGY (.,OMMISSION E. ~

DIRECTORATE OF REGULATORY OPERATIONS '

b

,' [i=

t REGION IV l

'd 4

10395 WEST COLFAX. ROOM MO DENVER. COLoRAoO 8 o 215 gO January 7,1974 Texas Utilities Generating Company Docket Nos. 50-445 and 50-446 ATTN:

Mr. Perry G. Brittain i

Executive Vice President 1506 Commerce Street 4

Dallas, Texas 75201 Gentlemen:

This refers to the inspection of activities being performed in 2

conjunction with ycur proposed Comanche Peak Project, Docket Nos. 50-445 and 50-446, conducted by Messrs. Warnick and Peranich during the p?riod December 3-6, 1973, and to the discussion of our findings held by Messrs. Warnick and Peranich with Messrs. Schmidt, Caudle and other members of your staff at the conclusion of the inspection.

The inspection was limited to the Quality Assurance aspects of your design and procurement activities and to compliance with the Commission's rules and regulations in this area. The inspection consisted of selective examinations of procedures and representative records, interviews of personnel, and

..oservations by our inspectors.

During this inspection, it was found that certain of your activities appeared to be in violation of AEC regulations. These items and reference to the pertinent requirements are listed in the enclosure to this letter. Our findings are being forwarded through Regulatory Operations Headquarters to the Directorate of Licensing in order that a determination relative to your docket staMs may be e stablished.

In accordance with Section 2. 790 of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the AEC's Public Document Room. If this report contains any information

g.

n O

(f} :.'

Texas Utilities Generating ' January 7,1974 Company.,.),

j that you believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons it is claimed that the information is proprietary. It should be prepared so that proprietary information identified is contained in a separate part of the document, since the application, excluding this separate part, will also be place? in the Public Document Room.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Unless you wish to make application to withhold information, no reply to this letter is necessary; however, should you have any questions regarding this inspection, we will be pleased to E

discuss them with you.

W

,-~

Sinc e rely,

. Original signed D/

~

E. Morris Mc:ard E. Morris Iloward Director Enclosure s 1.

Summary of Violations 2.