IR 05000445/1976001

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-445/76-01 & 50-446/76-01 on 760107-09.Noncompliance Noted
ML19344F313
Person / Time
Site: Comanche Peak  
Issue date: 01/29/1976
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Brittain P
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19344F268 List:
References
NUDOCS 8009150120
Download: ML19344F313 (2)


Text

'

"

^

Q Lt.)

@rch}g

?,-

R

- '

'

ff g

~

jb e

., *

.

c

,,

UNITED STATES

~g** -

NUCLEAR REGULATORY COMMISSloN 9%,

';

OFFICE OF INSPECTION AND ENFORCEMENT

,

REGloN IV f

611 RYAN PLAZA DRIVE, SUITE 1000

-

ARLINGTON, TEXAS }Ff,R}? 76011 p (,

,

January 29,1975)

[ib l{,0 \\

~

"

Texas Utilities Generating Company Docket Nos. 50-445 ATIN:

Mr. Perry G. Brittain 50-446

'

President 2001 Bryan Tower

-

Dallas, Texas 75201 Jentlemen:

This refers to the inspection conducted by Met srs R. C. Stewart and

{

h. W. Dickerson of this office.on January 7-9, 1976, of activities author-ized by NRC Construction Permit Nos. CPPR-126 and 127 for the Comanche Peak facility, Units 1 and 2, and to the discussion of the findings held by the Anspectors with Mr. R. W. Caudie and other members of your staff at the

conclusion of the inspection.~

-

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted i

.of selective examination of procedures and representative records, inter-views with personnel, and observations by the inspectors.

,

,

l

[

During the inspection it was found that certain activities under your j

' license appe'ar to be in noncompliance with Appendix B to 10 CFR 50 of the

'NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

'The items of noncompliance and reference to the pertinent requirements are

.

I

. identified in Section I of the su= mary of the enclosed report.

-

We have also examined actions you'have taken with regard to previously

'

idencified inforcement matters and unresolved items. The status of these f

. items is identified in Sections II and IV of the su=cary of the enclosed l

report.

,

'This notice is sent to you pursuant to the provisions of Section 2.201 of f

the NRC's." Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 30 days of your

~

y

"

8009150 s

-,

y (

b

,

. r

-

.'

&

'

h O

^

-

.

.

,.

.

'

...

-

,

Texas Utilities Generating Co.

' -2-Januar;' 29, 1976 i

receipt of this notice, a written statement or explanation in reply includ-

-.i

.

I

ing:

(1) corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken to avoin further noncom-pliance; and (3) the date when full compliance will be achieved.

.In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the i

enclosed inspection report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be proprietary,

,

it is necessary that you submit a written application to this office, within 20 days' of the date of this letter, requesting that such information be with-L held from public. disclosure.

The application must include a full statement of the-reasons uhy it is claimed that the intornation is proprietary. The application should be prepared so that any proprietary information identified is contained in an enclosure to the application, since the application without

,

l the enclosure will also be placed in the Public Document Room.

If we do not i

hear from you in this regard within the specified neriod, the report will be placed in the Public Document Room.

  • ~

-

Should you have any questions concerning this inspection, we will be pleased

--

to discuss them with you.

.

i

Sincerely, hlWf&n <-

.

!

G. L. Madsen, Acting Chief, Reactor Construction and

,

Engineering Support Branch Enclosure:

IE Inspection Report Nos. 50-445/76-01

'

50-446/76-01 cc: Texas Utf.lities Generating Company ATTN:

R. W. Caudle, Project Manager 2001 Bryan Tower

-

Dallas, Texas 75201

-

i

.

t l

' ('

-

Q

-

-

-

i

,

e-we

-4

,

T

' Ys