IR 05000445/1978005
| ML19344F318 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/06/1978 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19344F268 | List:
|
| References | |
| NUDOCS 8009150129 | |
| Preceding documents: |
|
| Download: ML19344F318 (2) | |
Text
y[
-
--no n.c o
,
a-
- - -
"
,/
'a
-
j#'
W Ur'tTEO STATES g}
NUCLE AR RECULATORY COMMISSION
'-
e_
a j
REGION IV
o
-
3,
.[
Ej 611 RY AN PLAZA DRIVE, SulTE 1000
,. W'
g ARLINGTON, TE XAS 76011
%-
l
- *....
April 6,10Td in Reply Ref r To:
RIV Docket tio.'10_-445/Rp_ti, 78-05 50-4 G/Rpt. 78-05 r
Texas Utilities Generating Company ATTil: fir. R. J. Gary Executive Vice President and General fianager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:
This refers to the inspection conducted by f4r. R. G. Taylor of our staff during the period flarch 21-24, 1978, of activities authorized by t!RC Construction Permit tios. CPPR-126 and 127 for the Comanche Peak facility, Units flo.1 and 2, and to the discussion of our findings with Mr. R. G.
Tolson and other members of your staff at the conclusion of the inspection.
'
Areas examined during the '.nspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During the ' inspection, it was found that certain activities under your license appear to be in noncompliance with Appendix B to 10 CFR 50 of the flRC Regulations, " Quality Assurance Criteria for fluclear Power
-
Plants." The item of noncompliance and references to the pertinent requirements are identified in the enclosed ttotice of Violation.
,
One new unresolved item is identified in paragraph 3 of the enclosed report.
'
This notice is sent to you pursuant to the provisions of Section 2.201 of the flRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 30 days of your receipt of this notice, a written statement or explanation in reply including: (1) corrective steps which have been taken by you, and the results achieved; (2) corrective' steps which will t
be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.
.
_
pso\\'lA
r3
--)
<3
'
~
.
?,
..
-
.
-.
Ih;
'Taxas Utilities Generating Co.
-2-April 6, 1978
.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
- 2,~ Title 10, Code of Federal Regulations, a copy of this letter and the
.
enclosed inspection report will be placed in the NRC's Public _ Document-
- Room.
If the report contains any information that you believe to be proprietary, it is necessary that you submit a written application to
.
- this office, within 20 days of the date of this letter, requesting that such information:be withheld from public disclosure. The application
,
must include a full statement of the reasons why it is claimed that the
'
information is proprietary. The application should be prepared so that any proprietary information identified is contained in an enclosure to
.
-
the application, since the application without the enclosure will also be placed in the Public Document Room.
If we do not hear from you in this regard within the specified. period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
-
Sincerely
.
5#
.
-(E w'
~
W. C. S le, Chief Reactor onstruction and
Engineering Support Branch Enclosures:
1.
IE Inspection Report No. 50-445/78-05 50-446/78-05 2.
Appendix A, Notice of Violation
.
cc: w/ enclosures
.
Texas Utilities Generating Company ATTN:
Mr. H. C. Schmidt, Project Manager 2001 Bryan Tower
'
Dallas,-Texas 75201
'
.
e
!
.
, **
.
-
%
9 f
l:
_d-