Text
r
-
- .
s.
,
.-
U.S. NUCLEAR REGULATORY COMMISSION-0FFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-440/81-15; 50-441/81-15 Docket No. 50-440 50-441 License No. DPPR-148; DPPR-149 Licensee: Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, OH 44101 Facility Name: Perry Nuclear Power Plant, Units 1 & 2 Inspection At: Perry Site, Perry, OH Inspection Conducted: October 7 thru 9, 1981 E.2 AA~k
'
Inspector:
E. R. Schweibinz M9~8/
Accompanying Personnel:
R. A. Gilbert, NRR W. H. Lovelace, NRR
,
TDs=% puer Approved By:
L. f Vgor, Acting Chief g/NRI Re'
.ojects Section 2B Inspection Summary:
Inspection on October 7 thru 9, 1981 (Report No. 50-440/81-15; 50-441/81-15)
Areas Inspected: Accompany NRR Caseload Forecast Panel and site tour. This inspection involved a total of 18 inspector-hours onsite_by one NRC inspector including 0 inspector-hours onsite during offshifts.
Results: No items of noncompliance or deviations were identified.
8111190589 811103 PDR ADOCK 05000440
_. _ -
,
-.
c
...
'.
.
DETAILS
'
1.
Persons Contacted Cleveland Electric Illuminating Company (CEI)
- R. L. Farrell, Manager, QA
- M. Edelman, Manager, Nuclear Engineering
- K. Matheny, Scheduling Supervisor
- J. Porterfield, Project Controls Manager
- M. J. Titas, Manager, Perry Project Services
- L. Beck, CEI Licensing
- J. M. Lastovka, General Supervisor, Engineering - NTS
- G. H. Lockwood, General Supervisor, Construction Buying P. Martin, Generation Supervising Engineer, T/AS M. K. Combs, Engineering Aid - Training / Administration
- Denotes those attending the management exit meeting on October 9, 1981.
The inspector also contacted other licensee and contractor personnel.
2.
Caseload Forecast Panel Activities, The inspector accompanied the Caseload Forecast Panel members during the presentations made by the licensee, the site tour, and discussions with various members of the licensee's staff. A separate report issued by the NRR Division of Licensing will discuss the results of the visit.
No items of noncompliance were identified.
3.
Exit Meeting The inspector met with licensee representatives (denoted in Paragraph 1, Persons Contacted) at the conclusion of the inspection. The in-spector summarized the scope and findings of the inspection.
-2-