IE Insp Repts 50-440/81-02 & 50-441/81-02 on 810101-31.No Noncompliance Noted.Major Areas inspected:safety-related Const Activities,Welding of Electrical Switchgear Panels & Control Cabinets
ML19350B622
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/11/1981
From: Julie Hughes, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19350B621 List:
References
50-440-81-02, 50-440-81-2, 50-441-81-02, 50-441-81-2, NUDOCS 8103230151
Download: ML19350B622 (6)


Text

.

n U.S. NUCLEAR REGULATORY CO)D!ISSION

)

0FFICE OF INSPECTION AND ENFORCE 31ENT

REGION III

Report Nos. 50-440/81-02; 50-441/81-02 Docket Nos. 50-440; 50-441 License Nos. CPPR-148; CPPR-149 Licensee:

Cleveland' Electric Illuminating Company P.O. Box 5000 Cleveland, Oli 44101 Facility Name:

Perry Nuclear Power Plant, Units 1 and 2 Inspection at:

Perry Site, Perry, Oli Inspection Conduc ed:

January 1-31, 1981 9 N llu"gh Inspector:

f f

/

~

B![hd,

'

Approved by:

C. C.

.iI iams, h

Pr ects Section 2

/

Inspection Summary Inspections on January 1-31, 1981 (Report No. 50-440/81-02; 50-441/81-02)

Areas Inspected:

Routine inspection by the IE Regional Resident Inspector (RI)

of safety related construction activities, welding of electrical switchgear panels, control cabinets, licensee actions relative to previously identified items of noncompliance and unresolved items and actions relative to resolution of significant deficiency report 10CFR50.55(e). This inspection involved 146 onsite inspector hours by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

.

8103230 /S/

~

.

DETAILS Persons Contacted

.

  • M. Edelman, Manager, Nuclear QA Department
  • G. Groscup, Manager, Nuclear Engineering Department W. Kacer, General Supervising Engineer, CQS J. Kline, General Supervising Engineer, Construction B. Barkley, General Supervising Engineer, Design P. Martin, General Supervising Engineer, PQS G. Leidich, CQS QA Supervisor K. Combs, CQS Engineering Aide S. Tulk, CQS Lead Electrical Quality Engineer E. Christiansen, Nuclear Electrical Engineer B. Walrath, PQS QE Supervisor J. Goccher, Project Maintenance Coordinator Other Personnel R. Matthys, CQS Quality Engineer (GAI)

R. Williams, CQS Lead Mechanical wality Engineer, (GAI)

R. Crofton, CQS Lead Piping Quality Engineer (GAI)

G. Parker, CQS Quality Engineer (GAI)

K. Pech, Assistant Project Manager (GAI)

P. Hunter, CQS Lead Construction Auditor (GAI)

,

B. Newell, Welding Engineer (NNIC)

'

The inspector also contacted and interviewed other licensee and contractor personnel during this reporting period.

  • Denotes those attending at least one of the exit meetings.

F Licensee Action on Previous Inspection Findings (Closed) Unresolved Item (440/79-04-02; 441/79-04-02):

Open items described in IE Circular No. 78-08; connectors, electrical penetrations, tenninal blocks and limit switches.

The licensee is performing a detailed review of environmental qualification of Class IE equipment to ensure that the equipment will function under (i.e. during and following) postulated accident conditions. Test reports i

and other documentation which licensee references as establishing environmental qualification will be reviewed for acceptability by NRR, Environmental Qualifi-cation Branch prior to fuel load. The resident inspector will continue to verify that environmental qualification is available for class IE equipment.

(Closed) Noncompliance (440/79-03-05; 441/79-03-05):

Safety Related RHR and LPCI pump discharge heads and suction barrels unprotected. Visible rust was present on the connecting flanges and internal surfaces of the discharge heads. The RI reviewed maintenance job orders and equipment maintenance records.

The inspector determined that the discrepancies were corrected and documented.

(Closed) Noncompliance (440/80-01-01; 441/80-01-01):

GE ICSE inspectors quali-fication records do not indicate " Activity qualified to perform".

The RI reviewed ICSE quality control inspectors records (NDE) and determined that they were current.

!

l'

2-

,

l

.

.

.-

-.

-.

-

.

(Closed) Unresolved Item (440/80-08-01; 441/80-08-01):

Procedures require clarification; conflicting wcld bead width criteria, clarification of how returm welding material is handled, documenting welding parameters when monitored by QC personnel, and issuance of procedures as required by Perry Site addendum to GE ICSE QA Manual.

The RI inspector reviewed and observed the following:

revisions to welding procedures to clarify weld bead width criteria; observed weld rod material (studs) returned to issue room and dis-posal of into five gallon drum; reviewed and observed QC personnel documenting weld parameters on the weld traveller sheets; and re'.iewed procedures that were issued in accordance with the Perry Site addendum to GE ICSE QA Manual.

The inspector determined that the above was corrected satisfactorily.

(Closed) Noncompliance (441/80-14-01) Housekeeping in the area of Unit #2 sole plate.

The RI inspector reviewed the maintenance job order; construction quality section action request and projects storage maintenance requirements.

The inspector visi. d ly inspected the area and found it acceptable.

(Closed) Unresolved Item (440/80-16-01; 441/80-15-01): Welds on 4160 volt switchgear cabinets not in accordance with vendor drawings.

The RI inspector reviewed several letters from the vendor to the licensee that stated that the seismic integrity of the equipment would not be jeopardized by using a fillet weld versus a plug weld for installation of the cabinets.

The RI inspector has no further questions at this time.

(Closed) Unresolved item (440/80-19-01; 441/80-17-01):

A number of errors were noted on contractor's (NNIC) Welder Performance Qualification Records (WPQR).

The RI inspector reviewed several WPQR's during this reporting period and determined that the contractor has corrected the discrepancies on the WPQR. This item did not affect the quality of work performed.

(Closed) Open Item (440/80-23-01; 441/80-21-01): Resolution of six nonconform-ing reports (NR) referenced in IE report Nos. 80-23; 80-21 identified as open will be reviewed at a later date. The RI inspector reviewed several NR's to ascertain that they were Icgible, complete, reviewed by QC personnel, and readily retrievable.

NR's included status of corrective action.

Licensee Action on Other Items (Closed) 1CCFR50.55(.) Report, Subject:

Initial inspection of Class 1E 4.16 KV

.

Switchgear. Units revealed the existence of cracks and tears in the bottom of the steel enclosures where the metal is bent to allow mounting to embedded channels (plates). The RI inspector visually inspected several sections of the switchgear units and determined that the tackwelding was in accordance with the vendors recommended corrective action. The vendor stated in letter to licensee, that the repair of these cracks does not affect the seismic Certification per IEEE 344-1975 or Qualification Summary Report IEEE 323-1974.

The inspector has no further questions on this subject.

Functional or Program Areas Inspected 1.

Plant Tours, Units 1 and 2 One or more plant areas were toured several times during this reporting period to observe general construction practices, area cleanliness and storage condition of plant equipment.

-3-

_-

.

One tour was made on back shift.

No items of noncompliance or deviations were identified.

2.

Observation of Work Activitien - Electrical Components Electrical Components The inspector observed safety-related electrical equipment and

..

material storage areas, to determine whether requirements are being met relative to the following:

(1)

Protective covers.

(2)

Identification.

(3)

Cleanliness.

(4)

Equipment space heating.

(5)

Rotation of motor shafts.

(6)

Lubrication of bearings, etc.

(7)

Protective coatings, preservatives, desiccants, inert gas, etc.

(8)

Storage position.

(9)

Licensee / contractor surveillance / inspection activities, b.

The inspector observed work performance, partially completed work and completed, as appropriate, associated with the 4160 V switchgear, to ascertain whether requirements of applicable specifications, work procedures and inspection procedures were being or have been, controlled and accomplished.

The inspector determined the following:

(1)

Receipt inspection.

(2)

Identification control.

(3)

Installation - location, alignment, configuration, anchorages.

(4)

QC inspection.

(5)

Protection and cleanness preservation after installation.

(6)-

Work and inspection procedure revision control.

3.

Observation of Work Activities - Electrical Raceway Installation The inspector observed completed raceways and supports to determine whether requirements relative to the following were met:

-

4--

. _ _ _ _. _ _

. _ _ _ _... _.

-

_ _ _ _ _ _ _ _ _ _

_ _. -

__

.

W

.

a.

Type, size and location per approved drawings and specifications.

b.

Separation (vertical and horizontal).

c.

Identification.

d.

Segregation (power from control and instrument).

c.

Alignment.

,

,

f.

Sharp edges and burrs removed, g.

Grounding (non-safety).

i h.

Protective coatings.

1.

Contractor inspections.

4.

Observation of Work Activities - Raceway Supports and Anchorages The inspector observed completed supports (hangers) for safety-related

,

cable trays to detenmine whether requirements are being met relative to:

Technically adequate and approved drawings and specifications.

a.

t l

b.

Materials, type and size.

c.

Configuration, dimensions and tolerances.

d.

Welding and weld materials.

,

Qualified welders and weld procedures.

c.

f.

Weld inspection and identification.

'

g.

Location.

h.

Anchorage.

5.

Other Areas Inspected - Unit 1 During this reporting period, the RI questioned the use of " spade lugs" j

a.

for tennis.ation and connections in the termination cabinets located I

I in the control room. The licensee was unable to produce seismic qualification data addressing the use of spade lugs. However, the

. licensee has been in contact with the vendor 'to obtain qualification

.

data. This item is unresolved (440/80-02-01; 441/80-02-01).

I b.

- The RI observed the load test (720 to'ns) of the Lampson Transi-Lift

!.

Crane in order to certify it' for the Containment Dome Lift (520 tons).

,

No items of noncompliance or deviations were identified.

I

!

-5-l~

l

,

.

.

_..

. _ _. _ _.

__ _ _ _ _ _ _.

_.-

__ _

m ~

. _..

_.

.__. _ _ _.

... _ _.. _ _ _ _ _ _ _..

.

-

b

'

  • i Exit Meetines t

The inspector met with licensee representatives (denoted in Persons Contacted)

[

l on January 9, 16, 23 and 30, 1981.

The inspector summarized the scope and i

findings of the inspections performed.

i t

j Attchment:

Preliminary Inspection Findings

!

i

!

!

a

.

f.

J i

1

4-i i

-

i

-

l

l'

!

.

,

t

'

. -6-

.,..-. -

...

..

-.... -, -..

.-

.

...

- - -.. -

- -.

-.