Forwards IE Insp Repts 50-440/81-15 & 50-441/81-15 on 811007-09.No Noncompliance Noted
ML20032E061
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/03/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20032E062 List:
References
NUDOCS 8111190580
Download: ML20032E061 (2)


See also: IR 05000440/1981015

Text

{{#Wiki_filter:< s.- . . NOV 31931' o e 6 O Docket No. 50-440 [[ h9 Docket No. 50-441 E a Noy18 - 1981A - The Cleveland Electric Illuminating -y% i % Company b NQ*% -5 ATTN: Dalwyn R. Davidson O Vice President - System $D Engineering and Construction ][g Post Office Box 5000 '~ Cleveland, OH 44101 Gentlemen: This refers to the routine safety inspection conducted by Mr. E. R. Schweibinz of this office on October 7-9, 1981, of activities at Perry Nuclear Power Plant, Units 1 and 2, authorized by_NRC Construction Permit No. CPPR-148 and No. CPPR-149 and to the discussion of our findings with Mr. M. R. Edelman at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspcction. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within seven (7) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such infor- mation. Section 2.790(b)(1) requires that any such application must be fo$obbh $ ffl PDR

-- . _ _ m . . . .. . The Cleveland-Electric- -2- Illuminating Company- NOV 3198; , accompanied by an' affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains i a full statement of the reasons which are.the bases for the claim that the information should be withheld from public disclosure. This section-further requires the statement-to address with specificity the. considerations listed in.10 CFR 2.790(b)(4). The information sought to.be withheld shall be-

incorporated as.far as possible into a separate part.of-the affidavit. If 'we do not hear from you-in this regard within the specified periods noted ' above~, a copy of this letter and the enclosed inspection report will be - placed in the Public Document Room. We will gladly discuss any questions you have concerning this inspection. Sincerely, fl P t-n R. L. Spessard, Director Division of Resident and Project Inspection Enclosure: IE Inspection Report No. 50-440/81-15 and No. 50-441/81-15 cc w/ encl: DMB/ Document Control Desk (RIDS) ' Resident Inspector, RIII Harold W. Kohn, Power Siting Commission Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio , 5 R RIII RIII RIIIj Schweibinz/jp er Spessard 11/3/81 Wg il/J ff/3 }}