IR 05000424/1990004
| ML20012C078 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/14/1990 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Hairston W Georgia Power Co |
| References | |
| NUDOCS 9003200046 | |
| Download: ML20012C078 (3) | |
Text
__ ys
-
,.
b
MAR 141990 m
..
Docket Kos. 50-424, 50-425 l License Nos. NPF-68, NPF-81
-
Georgin Power Company ATTN: Mr. W. G. Hairston, 111
Senior Vice President -
Nuclear Operations
'.
P. O. Box 1295
.
Birmingham, AL 35201
,
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-424/90-04 AND 50-425/90-04 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by A.- Tillman on February 20-23, 1990.- The inspection included a review of activities authorized for your Plant Vogtle facility.. At the conclusion of the inspection, the findings were discussed with those members. of your staff-
-identified in the enclosed Inspection Report, i
~ Areas examined during the inspection are identified in the report.
Within-these areas, 'the -inspection consisted of selective examinations of procedures and. representative records, interviews with personnel, and observation of activities in progress.
The enclosed Inspection Report identifies activities that appeared to violate NRC. requirements that are not cited; therefore, a response is not required.
In accorda'nce with 10 CFR 2.790(d) and-10 CFR-73.21, safeguards activities and; security measures are exempt from public disclosure.
Therefore, the enclosures to this letter with the exception of the report cover page, which presents' a nonexempt summary, will not be placed in the NRC'Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, William E. Cline, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards Eglosure:
(See page 2)
je8 A88M 8883/32t 0,
-
Mc
~. -,.,.,,,,.,. w w w~ >
,+ +
..
.
r
.,g.J;"lL'%.4
.
+
,
. :
'
.
,.,
.
,
Georgia Power Company-2 MAR 14.1990
,
L'
Enclosure:
-NRC Inspection Report (SafeguardsInformation)
cc w/ enc 1:
.
R. P. Mcdonald-Executive.Vice President-Nuclear
.
.0perations Georgia Power Company P. O. Box 1295
.
Birmingham, AL 35201
'
i C
.K.
McCoy Vice President-Nuclear Georgia Power Company
.P. O. Box 1295
<
Birmingham, AL 35201 G. Bockhold, Jr.
General Manager, Nuclear Operations Georgia Power Company-
-P. O.;1600-Waynesboro, GA' 30830 i
J..A'. Bailey Manager-Licensing
-
Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 cc w/ Inspection Summary:
Ernest L. Blake, Esquire
-
Shaw, Pittman, Potts and Trowbridge-2300 N-Street, NW Washington, D. C.
20037-
,
,
J. E. Joiner, Esq.
Troutman, Sanders, Lockerman, & Ashmore 1400 Candler Building 127 Peachtree Street, NE Atlanta, GA 30303 D.- Kirkland. III, Counsel Office of'the Consumer's Utility Council Suite 225, 32 Peachtree Street, NE Atlanta, GA 30302 (cc w/ Inspection-Summary - See page 3)
L ne m e-n r " m " " " " "
.
r tin' "% *0C' <* Ur th' i %
SAFEGUARDS INFORMATIOb =;l: J';; % 7 L,
,
..
M.
,
i L
l.-
- c,
-
.
,
'
MAR 141990 Georgia Power Company.
<
!
~(cc w/ Inspection' Summary)
-Office of Planning and Budget r
Room 615B 270 Washington Street, SW
Atlanta, GA 30334
,
Office of the County Commissioner Burke County Commission Waynesboro, GA 30830
,
.J. Leonard.Ledbetter, Director-Environmental Protection Division Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334
-.
Attorney General Law Department 132 Judicial Building Atlanta, GA-30334 State of Georgia bec w/ Inspection Summary:
E. Reis, 0GC
.J. Hopkins, NRR
.K. Brockman, RII A. Herdt, RII bec.w/ encl:
NRR/DRIS/SB Document Control Desk-(RIDS IE02), 016 NRC Resident Inspector
,
DC:ument tera *al'!!ed he'aw'th fo
en e or o tre enmweunis exuw-t is cuw ~w RI DRSS RII DR R
S RII S
M
,
AT 1 man T a son D
Guire ockman admepet 03//,{/90 -
03/g/90.___.
03//3/90 03//390 N
SAFEGUARDS INFORM ATION
.
.
..
-
.