Text
-
--,a
_
'
DR R?opg,
.
. UNITED STATES
,
jog
. NUCLEAR REGULATORY COMMISSION -
[,
o REGloN il.
,$'
101 MARIETTA STREET, N.W., SUITE 2900 l
I*'
ATLANTA, GEORGIA 30323.
$9
,d
{
aut o 81987
!l Report No.:
50-416/87-16 Licensee: ~ System Energy Pesources,-Inc.
Jackson, MS 39205 Docket No.:
50-416 License No.:
NPF-29 Facility Name: Grand Gulf Nuclear Station Inspection Conducted: June 15-19, 1987 Inspector:
O.
i+ b 7-/- 07 A. Gooden (Date Signed)
Approved by: d
/4
<_
7-/ - 67 T. R. Decker, Section Chief (Date Signed)
Emergency Preparedness Section
. Division of Radiation Safety and Safeguards SUMMARY Scope:
This routine unannounced inspection was conducted in the area of emergency preparedness.
Results:
One violation was identified - failure to provide training to emergency response personnel in accordance with Emergency Plan ' Procedure 10-S-01-23.
i I
I
l l
l
l I
q l
l
8707150327-By7 PDR ADOCK 0
16 PDR i
G
' ' '
j l.
t
_
__ _ __
- -_ __
_ _ _ -
_ _ _
i l
l l
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- C. R. Hutchinson, General Manager
- M. J. Wright, Manager, Plant Support
- A. McCurdy, Manager Operations i
- A. C. Morgan, Supervisor, Emergency Preparedness
- J. D. Bailey, SERI Compliance Coordinator
- J. L. Robertson, Plant Licensing Superintendent
- J. G. Hurley, Site Emergency Preparedness Coordinator
- J. C. Vincelli, Chemistry / Radiation Control Technical Assistant A. W. Benson, Supervisor, Document Control
- S. M. Feith, Director, Quality Assurance
- S. F. Tanner, Manager, Nuclear Site Quality Assurance
- J. V. Parrish, Chemistry / Radiation Protection Superintendent
- L. F. Daughtery, Compliance Supervisor
- R. T. Halbach, Administrative Assistant To General Manager J
R. V. Mooman, Technical Assistant For Manager Plant Maintenance j
B. J. Block, Nuclear Scheduler B. C. Lee, Site Quality Assurance Audit Supervisor W. Brown, Fire Protection Assistant l
Other licensee employees contacted included engineers, technicians, I
security office members and office personnel.
NRC Resident Inspector
- W. F. Smith l
- Attended exit interview 2.
Exit Interview l
The inspection scope and findings were summarized on June 19, 1987, with those persons indicated in Paragraph 1 above. The inspector described the l
areas inspected and discussed in detail the violation identified in
{
Paragraph 5 below.
In addition, the inspector discussed the Management j
Control System for maintaining training records.
No dissenting comments j
were received from the licensee.
The licensee did not identify as l
proprietary any of the material provided to or reviewed by the inspector i
during this inspection.
3.
Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspection.
i l
-_ __ _ -
--.
_ _ _ _ _ _ _ _ -
l
'
4.
Changes to the Emergency Preparedness Program (82204)
f Pursuant to 10 CFR 50.47(b)(16); 10 CFR 50.54(q); ar.d 10 CFR Part 50, Appendix E, Sections IV and V, this area was reviewed to determine whether i
changes were made to the program since the last routine inspection (May
1986) and to note how these changes affected the overall state of emergency preparedness.
The inspector discussed the licensee's program for making changes to the Emergency Plan and Implementing Procedures.
The inspector reviewed the licensee's system (delineated in Plant Administrative Procedure 01-S-02-2, Nuclear Licensing Administrative Procedure No. 2.8, and Section 8.5 of the Emergency Plan) for review and approval of changes to the Plan and Procedures.
The inspector verified that changes to the Plan and Procedures were reviewed and approved by management.
It was also noted that all such changes were submitted to NRC within 30 days of the effective date, as required.
Discussions with licensee representatives indicated that although no
'
significant modifications to facilities, equipment, or instrumentation were completed since the last inspection, Plant and Corporate Management have concurred on expansion plans for the Technical Support Center (TSC).
According to licensee personnel, construction is scheduled to begin during August 1987 with a tentative completion date for October 1987. A licensee representative indicated that construction will not impact or degrade the normal operation and/or use of the TSC in the event of an incident.
In (
addition to the TSC expansion, discussions with licensee personnel i
disclosed that a new Claiborne County Emergency Operations Center (E0C) is being built in Port Gibson, and the licensee's Rumor Control Facility was relocated from the MP&L Electric Building ir, Jackson to the SERI I
Headquarters Building located at One Jackson Place in Jackson.
The organization and management of the emergency preparedness program were reviewed.
Since the last inspection, changes were made to the emergency preparedness staff for both the Plant and Corporate Organization. Changes
.
'
to the corporate organization involved personnel and the reporting chain.
The position of Emergency Preparedness Coordinator was reassigned, I
including a change in title (" Supervisor, Emergency Preparedness").
In i
addition, the reporting chain for the Corporate Emergency Preparedness Staff was revised from reporting to the Nuclear Licensing and Safety Di rector, to a newly created position known as " Manager Emergency Preparedness and Executive Assistant to 'li ce-Presi dent, Nuclear Operations."
The station change involved the first line supervisory reporting chain.
Although the aforementioned changes were made since the last inspection, discussions with licensee personnel indicated that there were no changes in responsibility for the plant or corporate staffs.
The inspector's discussion with licensee representatives also disclosed that there had been no significant changes in the organization and staffing of the offsite support agencies since the last inspection.
,
- ga
f
3 The inspector reviewed the licensee's program'for distribution of changes to the Emergency Plan and Procedures.
Document control records for the period June 12, 1986, to March 25, 1987, showed that appropriate personnel r
and organizations were sent copies of Plan and Procedure changes, as requi red.
I No violations or deviations were identified.
,
l S.
KnowledgeandPerformanceofDuties(Training)(82206)
Pursuant to 10 CFR 50.47(b)(15) and 10 CFR Part 50, Appendix E, Section IV.F, this area was inspected to determine whether emergency response personnel understood their emergency response roles and could perform their assigned functions.
The inspector reviewed the description of the training program in Section 8.2 of the Emergency Plan, Section 6.2 of the Emergency Plan Procedure No.10-S-01-23, and interviewed members of the instructional staff.
Based on these reviews and interviews, the inspector determined
that the licensee had established a formal emergency training program, j
Records of training for personnel assigned to the on-call list for the second quarter of 1987 were reviewed.
The review involved training documentation for the period March 1985 to June 1987.
It was noted that
!
two members of the current on-call list, designated as Operations l
Coordinator, had not received the required training as specified in
Administrative Procedure 01-S-04-21, " Emergency Preparedness Training Program."
Both individuals failed to complete retraining for respiratory certification in accordance with Administrative Procedure 01-S-04-10.
In l
addition, one of the two individuals had not completed Radiation Worker II l
annual training.
A licensee representative acknowledged this finding and l
indicated the two individuals would be removed from the on-call list
,
I l
pending completion of all training requirements.
This item is identified as a violation of 10 CFR 50.54(q) which requires the licensee to follow an Emergency Plan which meets the planning standards in 10 CFR 50.47(b).
Violation (50-416/87-16-01):
Failure to provide decertification training to personnel assigned to the station emergency organization.
In addition to the above finding, during the review of training records
!-
for personnel assigned to the on-call list, the inspector noted that four individuals assigned as TSC Communicators had no records to verify that a
'
respiratory fit test had been performed to satisfy respiratory l
decertification requirements in accordance with Administrative Procedure 01-S-04-10.
This matter was discussed with a licensee representative who acknowledged this finding, but took exception to the finding that training was not attended by personnel.
According to the licensee, decertification training was provided on March 4, 1987.
However, the completed training package to verify completion of the refit i
test was not on recora.
This item was also identified by the licensee's Quality Assurance Group and a Quality Deficiency Report (QDP,) was issued
'
I on June 15, 1987.
The QDR (No. 266-87, Transmittal No. 87/1519),which
'
was transmitted to -various plant personnel, indicated that an investigation was.in progress to locate documentation.
The QDR included corrective action to preclude recurrence and the corrective action
,
completion date.
A licensee representative (Manager, Plant Support)
!
concitted to removal of the four individuals from the on-call list and retraining if the training package is not located.
The licensee representative further stated that the individuals' training qualification
card was initialed as having completed the decertification on March 4,
!
1987.
The inspector was provided with each individual's training
,
qualification card for review and verification.
Although.the inspector verified the dates on the training qualification cards, the licensee was
.
informed that this matter is considered an inspector followup item.
j Inspector Followup Item (50-416/87-16-02):
Provide documentation to
verify completed respiratory training for personnel assigned as TSC l
communicators during the second quarter of 1987.
l
.
The licensee was also informed that the mishandling of training records which led to the QDR is considered an inspector followup item.
Inspector Followup Item (50-416/87-16-03):
Maintain training records in accordance with Plant Administrative Procedure 01-S-04-14.
According to training records, with the exception of the findings stated above, all other training provided to key members of the onsite on-call list was consistent with the Plan and Procedures. The inspector reviewed l
training records for key members of the licensee's offsite emergency
)
organization.
It was noted that several individuals had not completed training in accordance with the description in the Emergency Plan and l
Emergency Plan Procedure.
This matter was discussed with a licensee representative who acknowledged this finding and indicated that training would be completed by the date included in the MP&L-SERI Transition Plan (June 30, 1987).
The licensee was informed that this item will be reviewed during a subsequent inspection.
Inspector Followup Item (50-416/87-16-04):
Complete all training for I
offsite emergency organization personnel.-
Documentation was provided to.the inspector regarding the training of j
offsite support agencies to verify that training was conducted during 1986 (June and August) and 1987 (June) in accordance with section 8.0 of the Emergency Plan.
One violation and no deviations were identified.
6.
Licensee Audits (82210)
Pursuant to 10 CFR 50.47(b)(14) and (16) and 10 CFR 50.54(t), this area was inspected to determine whether the licensee had performed an independent review or audit of the emergency preparedness program.
[
l
.
l
~
l k
Records of audits of the program were reviewed.
The records showed that l
I an independent audit of the program was conducted by Audits Quality Assurance Group from February 23, 1987, to March 18, 1987, and was j
documented in Audit Report No. MNEP-87/01, dated April 23, 1987.
This
'
I audit fulfilled the 12-month frequency requirement for such audits.
The l
audit records showed that the State and local government interfaces were evaluated, and according to Quality Assurance personnel, State and local government authorities were informed that findings concerning the State
{
and local interfaces v.ould be available for review.
Audit findings and j
recommendations were presented to plant and corporate management.
A J
l review of past audit reports indicated that the licensee complied with the i
five-year retention requirement for such reports.
i Licensee Emergency Plans and Procedures require critiques following exercises and drills.
Licensee documentation dated January 19, 1987, j
showed that a critique was held following the annual exercise in December 1986.
The documentation showed that deficiencies were discussed in the
!
critique, and recommendations for corrective action were made.
!
f The licensee's program for follow-up action on audit, drill, and exercise
findings was reviewed.
Licensee procedures required follow-up on deficient areas identified during audits, drills, and exercises.
The inspector reviewed a sample of licensee records for February and March 1987, which indicated that corrective action was taken on identified problems, as appropriate.
The licensee had established a tracking system known as the " Action Tracking System (ATS)," for use as a management tool i
in following up on actions taken in deficient areas.
l I
'
No violations or deviations were identified.
7.
IE Bulletin (92703)
y l
(0 pen) Inspector Followup Item (IFI) 50-416/87-16-05):
In response to IE i
Bulletin No. 79-18, complete the installation and testing of warning l
system for high noise areas of the plant.
!
l 8.
Inspector Follow-up (92701)
i a
a.
(Closed) IFI 50-416/85-04-02:
Failure to estimate offsite beta dose per EPP-10-S-01-14 (Rev.6). During an offsite Monitoring Team drill, the inspector noted that the beta dose rate was obtained by a survey
team member in accordance with Of fsite Monitoring Team Procedure No.
j 10-S-01-14 Revision 9.
l I
b.
(Closed) IFI 50-416/85-24-02:
Page system cannot be heard in the containment.
A review of licensee documentation (Design Change Package No. 84/0231) and discussions with licensee representatives disclosed that evacuation warning ?ights are being installed in l
combination with PA system for high noise areas of the plant.
l
1
_ _ _ _ _ _ _ _. - _. _ _ _. _ _ _. _ _ _ _ _. _ _ _ _ _
_ _ _ _ _ - _ _
!
!
.-
.
l l
i c.
(Closed) IFI 50-416/86-40-01:
Document all reviews of agreement letters with offsite support groups.
A review of licensee
!
documentation dated January 30, 1987, verified that offsite support agencies were contacted January 14-15, 1987, regarding letters of agreement that were transmitted for review during December 1986.