IR 05000413/1982003

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-413/82-03 & 50-414/82-03 on 811226-820125. Noncompliance Noted:Failure to Follow Procedure for Structural Steel Insp
ML20050Q637
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/19/1982
From: Bryant J, Vandoorn P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20050P504 List:
References
50-413-82-03, 50-413-82-3, 50-414-82-03, 50-414-82-3, NUDOCS 8204140484
Download: ML20050Q637 (6)


Text

.

.

/

o UNITED STATES.

k NUCLEAR REGULATORY COMMISSION g

e REGION 11

o 101 MARIETT A ST., N.W., SulTE 3100 ATLANTA, GEORGIA 30303 o

Report fios. 50-413/82-03 and 50-414/82-03 Licensee:

Duke Power Company

,

422 South Church Street

.

Charlotte, f(C 28242 Facility flame: Catawba Docket flos. 50-413 and 50-414 License flos. CPPR-116 and CPPR-117 Inspection at Catawba site near Rock 11111, South Carolina Inspector:

8. d e-

.c N,

_/h J//9/82 D6te Signed P. K. VanD orn~

/

,

Mt42<m N

,2//c//g z_

Approved by:

-

J.

rfant, Secyon Chief, Division of Date ' Signed ident and Reactor Project Inspection SUtifiARY Inspection on December 26, 1981 - January 25, 1982 Areas Inspected This routine, announced inspection involved 124 resident inspector-hours on site in the areas of safety-related pipe support and restraint systems (Unit 1);

safety-related structures - observation of welding and nonwelding activities (Unit 1); safety-related components - observation of work and work activities

,

,

(Unit 1); reactor vessel internals - observation of work and work activities

(Unit 1); reactor coolant pressure boundary piping (welding) - observation of

!

werk activities (Unit 2); safety-related piping (welding) - observation of work I

acthities (Unit 2); and followup of IIRC identified items (Units 1 and 2).

Resul ts i

Of the seven areas inspected, no violations or deviations were identified in five i

areas; two items of noncompliance were found in two areas (Violation - use of j

uupproved marker on stainless steel piping - paragraph 5.b.; Violation - failure

te, follow procedure for structural steel inspection - paragraph 10.b.)

i

,

8204140484 820330

'

q PDR ADOCK 05000413 G

PDR

!

-

. -.. -,.. -

_ _. - -. -.

.. - - -. -

- _ _.,,., - - -- - - - _ _.

_,

-.. - -, - -..... - -., - - - -.

.

_

_

. _ _.

'

-

.

.

.

i DETAILS i

1.

Persons Contacted Licensee Employees

  • J. C. Rogers, Project Manager
  • S. W. Dressler, Senior Construction Engineer

.

  • W. O. Henry, QA ilanager, Technical Services l

l

  • L. R. Davison, QA Manager, Projects Division J. M. Curtiss, QA Manager, Vendors Division
  • J. Davis, Hanger Manager C. A. Robinson, QA Superintendent
  • T. H. Robertson, Construction Engineer, Civil / Welding
  • R. A. florgan, Project QA Engineer
  • T. D. Ilills, Construction Engineer llechnical
  • J. C. Shropshire, QA Engineer Supervisor
  • H. D. Mason, QA Engineer Supervisor J. E. Cavender, Level III Inspector J. W. Glenn, QA Engineer H. L. Atkins, QA Engineer
  • D. H. Llewellyn, Welding Engineer

.

Other licensee employees contacted included construction crattsmen,

-

!

technicians, inspectors, and office personnel.

,

  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on January 22, 1982 with

those persons indicated in paragraph 1 above.

The violations and unresolved

'

items described in paragraphs 5.b., 6.b., 9.b., and 10.b. were discussed in i

detail. The licensee informed the inspector of details concerning QA stop l

work order No. 6 concerning safety-related supports and restraints.

3.

Licensee Action on Previous Inspection Findings a.

(Closed) Violation (413, 414/81-14-01):

Inadequate measures to assure

,

adequate evaluation of a nonconforming condition.

Licensee actions

concerning this item have been clarification of the affected noncon-

forming item report (NCI), personnel training, revision of the

!

procedure for control of NCI's and implementation of a system to

!

evaluate generic aspects of weld root defects. The inspector verified i

these actions and considers them to be satisfactory.

l b.

(Closed) Violation (413, 414/81-20-01):

Inadequate measures to control l

welding filler material.

Licensee actions concerning this item have j

been disciplinary action to responsible personnel, revision of the

- - -,. -..-,

-...

. - -.. - - - - -

, - - -

- -. _ - _.

..-,,,

., -. -

-

- - -... - - -

- -. - - - -

-

.

.

.

.

procedure for control of filler material, and training of appropriate personnel.

The inspector verified these actions and considers them to be satisfactory.

c.

(Closed) Violation (413, 414/81-24-02):

Inadequate evaluation of lack of fusion weld defect.

Licensee actions concerning this item have been advising of appropriate personnel of the proper steps to follow in evaluating rejectable defects, repair of the affected weld, and establishing a method of evaluating weld root defect nonconformances to ensure proper evaluation.

The inspector verified these actions and considers them to be satisfactory.

4.

Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or devia-ti ons. New unresolved items identified during this inspection are discussed in paragraphs 6.b. and 9.b.

5.

Independent Inspection Efforts (Units 1 and 2)

a.

The inspector conducted general inspections of site work and work activities; observed protection and storage of mechanical equipment, electrical equipment, electrical cables, instrumentation and piping; and observed housekeeping. These inspections were performed in the auxiliary building, containment buildings, pipe fabrication shop and storage areas.

!

b.

The inspector attended an Atomic Safety and Licensing Board prehearing conference on January 12, 1982.

I

!

c.

On January 20, 1982, the inspector noted numerous graphite type pencil l

markings on a Unit 1 safety-related 12" stainless steel pipe identified on ISO Drawing No. IND43.

The applicable site procedure for control of surface applied materials, CP-479, Rev. 4; does not allow use of graphite type pencils on stainless steel material.

This is in violation of 10 CFR 50, Appendix B, Criterion V which requires activities affecting quality to be performed in accordance with established procedures.

This is a Violation (413/82-03-03): Use of unapproved marker on stainless steel piping.

No violations or deviations except as identified in paragraph 5.c., were identified.

6.

Nonconforming Item Report Review (Units 1 and 2)

a.

The inspector reviewed numerous nonconforming item reports (NCI's) to determine if requirements were met in the areas of documentation, approvals, evaluation, justification, and corrective action.

I c--

,,

- -,

n.

-., -,

,w.-...n--.

-

--

, -

,, - -, -

_. -, -,

c-

--

.,

.,_,,--,,,,,,,--,--..m

l

'

..

.

b.

On January 19, 1982 the inspector noted that NCI No.s 13507 and 13527 identify defects in hanger material welds possibly rejectable to Code

.

requirements (AS!1E Section III, Subsection NF).

It is not clear in the

.

justification for acceptance that code rejectable defects are not present in the hanger material.

This item will be unresolved until t

adequate justification for acceptance can be verified.

This is an Unresolved Item (413, 414/82-03-01):

Clarification of NCI evaluations

'

!

concerning hanger material.

'

Ho violations or deviations were identified.

7.

Safety-Related Pipe Support and Restraints Systems (Unit 1)

The applicable code for safety-related pipe support and restraint systems installation is the ASME Boiler and Pressure Vessel Code,Section III, Subsection NF,1974 Edition plus addenda through summer 1975.

The inspector observed installation in progress of hanger Nos.1-AWG-3552,1-A-GW-3493, and 1-A-WG-3553 for conformance to code and procedure requirements in the

areas of use of specified materials, location, documentation, conformance to drawings, welding requirements and anchor bolt installation.

No violations or deviations were identified.

,

8.

Reactor Vessel Internals - Observation of Welding and Nonwelding Activities

(Unit 1)

The inspector observed work in progress for installation of reactor vessel lower internals being accomplished in accordance with Westinghouse Spec-ification No. C16A407G01, Rev. 9,; site procedure CP-639, Rev. O, and Westinghouse Drawing 6120E24, Sub 8.

The inspector observed torqueing of

,

bolts, crimping of bolt locking cups, QC inspection of crimping and torqueing activities, QC inspection of locking cup welds, and licensee QA dudit of these activities.

No violations or deviations were identified.

9.

Safety-Related Components - Observation of Work and Work Activities (Unit 1)

I a.

The inspector observed four installed Unit 1 safety-related Limitorque motor operated valves for conformance to requirements in the areas of protection from surrounding construction activities (dirt, debris, water, etc), removal or retention of dessicants as applicable, and energizing of heaters.

Valves observed were Tag Nos.1NI54A,1NI76A,

1RN47A, and 1RH57A.

i b.

On January 6, 1982 the inspector noted oil in the limit switch compartment of valves IMI54A and li1I76A.

On January 7, 1982 the inspector noted oil in the limit switch compartment of valve 1RN47A.

The inspector noted that oil leakage of Limitorque valves had resulted in a 10 CFR 50.55(e) report for the licensee's McGuire plant on

i October 21, 1981. The licensee infomed the inspector that they were i

. _ _

_. _ _ _ _. _ _

_. -.

_. _ _ _ _

.

_ - _ _ - _. -.

.

_ - -. - - _.. -

_

..

..

'

..

.

.

t

aware of the problem and were still evaluating the problem for Catawba at the time the inspector identified the oil leaks. The licensee

,

phoned a 10 CFR 50.55(e) report regarding the oil leaks at Catawba to

'

HRC:RII on January 21, 1982. This item will be unresolved until a

.

complete and adequate evaluation of this problem can be verified. This is an Unresolved Item (413, 414/81-03-02):

Correction of Limitorque valve installation.

No violations or deviations were identified.

10.

Safety-Related Structures - Observation of Welding and Honwelding Activities (Unit 1)

a.

The inspector observed modifications in progress of fuel pool gate 1A being accomplished in accordance with drawing CNM 1144.28-006, Rev. C; drawing CNF01438.31-30G, Rev. 3; and welding code AWS-D1.1-1975.

The inspector observed this work for requirements in the areas of mechanical and welding inspection, use of specified materials, in process documentation, use of latest drawings, appearance of welds, performance of required NDE, weld and welder identification, welding material control, welder qualification, and inspector qualification.

The inspector observed weld Nos. A83 thru A95, A4, A13, and A102.

b.

On January 6,1982 the inspector noted that Fona M18A, Structural Steel Fabrication and Erection Inspection Report was not issued to cover the

fuel pool gate modification work and, as a result, the required structural inspections were not being performed. These requirements are delineated in site Construction QA Procedure 1118, Rev. 8, Inspection of Structural Steel Fabrication and Erection. This is in violation of 10 CFR 50, Appendix B, Criterion V which requires activities affecting quality to be accomplished in accordance with established procedures.

This is a Violation (413/82-03-04):

Failure to follow procedure for structural steel inspection.

No violations or deviations,except as identified in paragraph 10.b, were

.

identified.

11.

Safety-Related Piping (Welding) - Observation of Work and Work Activities (Unit 2)

The applicable code for installation of safety-related piping is the ASME Boiler and Pressure Vessel Code,Section III,1974 Edition plus addenda through summer 1975.

The inspector observed in process weld No. 2NV49-7 and reviewed records for conformance to code and procedure requirements in the areas of documentation of pertinent information and QC signoffs via a weld traveler, availability of pertinent instructions, use of appropriate qualified welding procedure, provisions for weld repair provided, certification of filler material, control of welding parameters, verifi-cation of welder qualification, use of specified shielding and purge gas, condition of welding equipment, provisions for voltage and amperage checks, verification of proper fitup, control of preheat and interpass temperature,

.

,_.. - - - _ - -

.

.

-

,

-

- -

.-.

.

    • **

,.

.

.

condition of weld and base metal surfaces, and verification that appropriate inspections were being performed.

No violations or deviations were identified.

12.

Reactor Coolant Pressure Boundary Piping (Welding) - Observation of Work and Work Activities (Unit 2)

The applicable code is delineated in paragraph 11. The inspector observed welding in progress for 10-inch weld no. 2NC45-4 for conformance to code and procedure requirements in the areas delineated in paragraph 11.

No violations or deviations were identified.

s s'

e