IE Insp Repts 50-413/82-07 & 50-414/82-07 on 820226-0325. Noncompliance Noted:Inadequate Procedure for Control of Repair Welding Resulting in Grinding Performed After QC Insp of Excavation & Prior to Rewelding
ML20053D968
Person / Time
Site: Catawba  
Issue date: 04/12/1982
From: Bryant J, Van Doorn P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20053D955 List:
References
50-413-82-07, 50-413-82-7, 50-414-82-07, 50-414-82-7, NUDOCS 8206070488
Download: ML20053D968 (7)


Text

. _ -.

--

.-

_ _.

-

_

,

.

, '

E

o UNITED STATES

  1. ,

1, NUCLEAR REGULATORY COMMISSION

$

I REGION 11 o,

g 101 MARIETTA ST., N.W., SUITE 3100 e

ATLANTA, GEORGIA 30303 j

.....

Report tios. 50-413/82-07 and 50-414/82-07 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: Catawba Docket Nos. 50-413 and 50-414 License Nos. CPPR-116 and CPPR-117 Inspection at Catawba site near Rock Hill, South Carolina inspector:

6 d c-d,..d c, M

4//.2//> 2, P. K. Van Doorn g

/

Date Signed

Approved by:

d do M.

M 4//2/B4 J. C. Brygnt, Sect,fon Chief Division of Date Signed Project and Resi' dent Programs SUtlilARY Inspection on February 26 - !! arch 25,1982 Areas Inspected This routine, announced inspection involved 152 resident inspector-hours on site in the areas of containment (steel structures and supports) - observation of welding and non-welding activities (Units 1 and 2); reactor coolant pressure boundary pip'ing - observation of welding and non-welding work (Units 1 and 2);

safety-related piping - observation of welding and aon-welding work (Unit 2);

safety-related components - observation of work (Unit 2); safety-related pipe support and restraint systems (Unit 1); electrical (components and systems) -

observation of work (Units 1 and 2); electrical (cables and terminations) -

,

.

observations of work (Ur.its 1 and 2); and followup of NRC and licensee identified j

items (Units 1 and 2).

Resul ts Of the eight areas inspected, no violetions or deviations were identified in seven areas; one violation was found in one area (Inadequate procedure for control of repair welding - paragraph 15.b).

<

8206070488 820526 PDR ADOCK 05000413 G

PDR

.. _ -

- - _ _.

_

_ _ _

-

_

- ~ _ _,,

.

.

DETAILS 1.

Persons Contacted Licensee Employees W. H. Owen, Executive Vice President, Engineering and Construction

  • J. C. Rogers, Project Manager A. W. Jackson, Construction Engineer S. W. Dressler, Senior Construction Engineer
  • W. O. Henry, QA lianager, lechnical Services

_

L. R. Davidson, QA flanager, Projects Division

  • T. H. Robertson, Construction Engineer, Civil / Welding
  • R. A. Morgan, Project QA Engineer J. W. Rowell, Construction Engineer, Electrical J. C. Shropshire, QA Supervisor H. D. Mason, QA Supervisor
  • J. H. Lanier, Corporate QA Representative it. L. Childers, Design SRAL
  • R. W. Quellette, Licensing Engineer J. E. Cavender Level III Inspector H. L. Atkins, QA Engineer J. W. Glenn. 0A Engineer

D. H. Llewellyn, Welding Engineer D. E. Gadd, Welding Engineer Other licensee employees contacted included construction craftsmen, technicians, inspectors and office personnel.

'

  • Attended exit interview

!

2.

Exit Interview The inspection scope and findings were summarized on March 26, 1982, with

,

those persons indicated in paragraph 1 above.

The unresolved item and violation described in paragraphs 6.b. and 15.b., respectively, were discussed in detail.

I 3.

Licensee Action on Previous Inspection Findings

.

a.

(Closed) Unresolved Item (413, 414/82-06-01):

Verification of i

electrical cable separation. Adequate controls have been implemented

{

by the licensee, in that a final walkdown inspection is now required by

'

supplemental inspection instruction tio.19 and instructions for i

installation of cable tray barriers nave been issued.

b.

(Closed) Violation (413, 414/81-22-01):

Failure to adequately control i

power cable spacing.

Licensee actions concerning this item have included clarification of the applicable specification, reinspection

,

and correction of previously installed cables, training of appropriate

,

I b

_ _

_

-__

_

.-

.-

personnel and implementation of a final walk through inspection. The inspector verified these actions and considers them to be adequate.

4.

Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or devia-tions. One unresolved item identified duping this inspection is discussed in paragraph 6.b.

5.

Independent Inspection Efforts (Units 1 and 2)

The inspector conducted general inspections of site work and work activities; observed protection and storage of mechanical equipment,

-

electrical equipment, electrical cables, instrumentation and piping; and observed housekeeping. These inspections were performed in the auxiliary building, containment buildings, pipe fabrication shop and storage areas.

No violations or deviations were identified.

.

6.

Nonconforming Item Report Review (Units 1 and 2)

a.

The inspector reviewed numerous nonconforming item reports (NCI's) to detennine if requirements were met in the areas of documentation, approvals, evaluation, justification, and corrective action.

b.

The inspector noted on fiarch 18, 1982 that NCI No.13632 identified that a Type II embedded plate lacked studs within 1" from the plate end.

Discussions with licensee personnel revealed that previous installation procedures had resulted in many Type I and II embedments which lacked the required studs within 1" of the end.

It appears that licensee personnel involved with the hanger program have recognized the problem and routinely use ultrasonic examination to determine stud locations.

It is not clear whether or not this discrepancy has been

>

accounted for during installation of other attachments to Type I and II embedments.

Until it can be determined that the stud location discrepancy has been considered for all other attachments to embedments this will be an Unresolved Item (413, 414/82-07-01): Verification of adequacy of embednents to withstand required loads.

No violations or deviations were identified.

7.

Licensee Identified Items 50.55(e) (Units 1 and 2)

a.

(Closed) (413, 414/81-17-10) (CDR 413/81-12) - Radiographic film for control rod drive violated code.

The licensee submitted a final response on Decmeber 15, 1981. The inspector verified the liensee actions and cor.siders them to be satisfactory.

The review included

,

observation of initial and new radiographs provided as a result of this

!

item.

t

__

e

.-

b.

(Closed) (CDR 413, 414/81-14) - Base metal linear indications encroached on minimum wall thickness. The licensee submitted a final response on 11 arch 1,1982. The inspector verified the licensee actions and considers them to be satisfactory. This verification included observation of installed pipe.

c.

(Closed) (CDR 413/81-23) - Nonconformance of weld on the Unit 1 spent fuel pool gates.

The licensee submitted a final response on October 30, 1981. The inspector verified the licensee actions and considers them to be satisfactory. This verification included obser-vation of welding rework in progress and completed rework.

d.

(Closed)(CDR 414/81-31) - Linear indication on Camco 1" 6000 lb.

stainless steel socket weld 90-degree elbow. The licensee submitted a final response on January 6,1982 and supplemental response on February 26, 1982.

The inspector verified the licensee actions and considers them to be adequate.

No violations or deviations were identified.

8.

Containment (Structural Steel Welding) - Observation of Work - Activities (Units 1 and 2)

The applicable code for containment welding is ASME B&PV Code, Section NE, 1971 edition plus addenda through summer 1972. The applicable code for fuel welding is AWS D1.1 - latest edition. The inspector observed welding in progress far confonnance to code and procedure requirements in the areas of inprocess documentation, weld identification aiid location, joint preparation, QC verification, use of approved procedures, control of weld material, control of preheat and interpass temperature, welder qualifi-cation, and appearance of weld. Welds observed were Unit 1 containment steam generator enclosure weld 2-1-Z; Unit 1 containment air lock weld Nos.

32338-13-1 and 33638-13-2; and Unit 2 fuel pool reactor vessel nozzle inspection hatch weld Nos. 2-7-AA, 2-7-T, 2-7-U, 2-7-W and 2-7-Y.

No violations or deviations were identified.

9.

Containment (Steel Structures and Support) - Observation of Work and Work Activities (Unit 2)

The inspector examined the Unit 2 reactor vessel nozzle inspection hatch for conformance to non-welding procedure requirements such as tool control, dimensional requirements, conformance to drawings, use of specified materials and use of latest approved drawings.

No v h.,

iras or deviations were identified.

10.

Safety-Related Pipe Support and Restraint Systems (Unit 1)

The applicable code for safety-related pipe support and restraint systems installation is the ASME Boiler and Pressure Vessel Code,Section III.

,

- _.

-.

.-.

c,

.~

Subsection Nf,1974 Edition plus addenda through summer 1975. The inspector observed a concrete anchor bolt installation for hanger no.1-R-WL-1162 for conformance to procedure requirements.

No violations or deviations were identified.

11. Safety-Related Components - Observation of Work Activities (Unit 2)

The inspector observed installation of valve no. 2NI005B for conformance to requirements in the areas of handling, tool control, use of specified valve and location.

No violations or deviations were identified.

12.

Electrical (Cables and Terminations) - Observation of Work and Work Activities (Units 1 and 2)

a.

Requirements for cable terminations are delineated in various DPC specifications and site procedures CP-388 and CQAP-M41. The inspector observed termination in progress for Unit 1 cable IVC 645 for confor-mance to requirements in the areas of cable identification, use of appropriate lugs, location of wires, cable entry into cabinets, tool calibration, and condition of wires.

b.

The inspector observed installed cables in various area in both units for protection of cable and cable trays from construction activities, securing of coiled cable, protection of cable ends, support of cable, and debris in cable _ trays.

No violations or deviations were identified.

13.

Electrical (Components and Systems) - Observation of Work Activities (Units 1 and 2)

Electrical equipment is being installed in accordance with various DPC specifications and procedure CQAP-M41. The inspector observed protection of installed electrical equipment and equipment in storage.

Included in this inspection were the Unit 1 auxiliary shutdown panels and various battery rooms.

No violations or deviations were identified.

14.

Safety-Related Piping (Welding) - Observation of Work and Work Activities (Unit 2)

The applicable code for installation of safety-related piping is the ASME Boiler and Pressure Vessel Code,Section III,1974 Edition plus addenda through summer 1975.

The inspector observed in process welds at various stages of completion and reviewed records for confonnance to code and

'

'

procedure requirements in the areas of documentation of pertinent

,

infcanation and QC signoffs via a weld traveler, availability of pertinent I

__

_

._..,

_. _

-

_

__

_

ty i

.-

instructions, use of appropriate qualified welding procedure, provisions for

,

weld repair provided, certification of filler material, verification of base material certification, control of welding parameters, verification of welder qualification, use of specified shielding and purge gas, condition of welding equipment, provisions for voltage and amperage checks, verification of proper fitup, control of preheat and interpass temperature, condition of weld and base metal surfaces, and verification that appropriate inspections were being performed.

The following welds were observed:

,

Weld No.

Size (inch Dia.)

Stage of Welding Observed 2KC250-11

Intermediate 2KC250-3

Intermediate 2NV463-1

Final 2NV463-2

Final 2ND9-4

Final 2KD50-6

Fitup The inspector also inspected the welder qualification area to determine if welder qualification was being adequately controlled.

The inspector witnessed two qualification tests in progress.

No violations or deviations were identified.

15.

Reactor Coolant Pressure Boundary Piping (Welding) - Observation of Work and Work Activities (Units 1 and 2)

a.

The applicable code is delineated in paragraph 14. The inspector observed welds for conformance to code and procedure requirements in the areas delineated in paragraph 14. The following welds were observed:

Weld No.*

Size (Inch Dia.)

Stage of Completion 2NI349-14

Root 2NI349-12

Root 1NC230-11

Root 1NC234-12

Repair 2NI349-16

Intermediate 2NC45-3

Final

-

.

.

.

-.

.

.

- - - - -.

s

.

y g

  • First number denotes unit number.

The inspector also observed the development and evaluation stages of liquid-penetrant inspection for weld Hos. 2NI349-6 and 7.

b.

On liarch 16, 1982, the inspector observed grinding being performed on the repair excavation for weld No. INC234-12. This grinding was performed after QC inspection of the excavation and prior to rewelding.

Rewelding was completed without obtaining another inspection of the excava tion. This grinding, if allowed, would, in effect, nullify the validity of the excavation inspection.

Existing site procedures do not preclude grinding on repair excavations after inspection is performed.

Therefore, this is in violation of 10 CFR 50, Appendix B, Criterion V which requires activities affecting quality to be performed by documented procedures appropriate to the circumstances. This is a Violation (413, 414/82-07-02):

Inadequate procedure for control of repair welding.

No violations or deviations, except as identified in paragraph 15.b above were identified.

16. Safety-Related Piping - Observation of Work and Work Activities (Unit 2)

a.

The applicable code is delineated in paragraph 14. The inspector observed handling and protection of piping for fabrication of the welds listed in paragraph 14 for confomance to procedure and code require-ments in the areas of control of tools for grinding, brushing and filing; use of appropriate handling and rigging equipment; control of cleanliness; and control of cold spring where applicable. The inspector also observed machining of piping for weld Nos. 2NV64-11, 2NS37-14, 2ND9-7, 2NV186-5 and 2NV63-14 for conformance to requirements i

for handling and tool control.

No violations or deviations were identified.

l 17.

Reactor Coolant Pressure Boundary Piping - Observation of Work and Work l

Activities (Units 1 and 2)

a.

The applicable code is delineated in paragraph 14. The inspector observed handling and protection of piping for fabrication of the welds listed in paragraph 15 for conformance to procedure and code require-

,

ments in the areas of control of tools for grinding, brushing and l

filing; use of appropriate handling and rigging equipment and control of cleanliness.

No violations or deviations were identified.

l

!

v_.