Duke Power Company
ATTN: Mr. W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject:
Report Nos.@413/82-hd 50-414/82-07
This refers to the routine safety inspection conducted by fir. P. K. VanDoorn of
this office on February 26 - flarch 25, 1982, of activities authorized by NRC
Construction Permit Nos. CPPR-116 and CPPR-117 for tne Catawba facility.
Our
preliminary findings were discussed with ftr. J. C. Rogers, Project flanager, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by-
telephone, within tel days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter. Such application must be consistent with the requirements of
2.790(b)(1).
i
8206070480 820526
PDR ADOCK 05000413
,
G
l
pyg
l
_.
.
_ . --.
. . . - .
..
_
._ --
-
-.
-.
.
..
.
Duke Power Company
2
APR 1 3 1982
Should you have any questions concerning this letter, we will be glad to discuss
them with you..
i
Sincerely,
R. C. Lewis, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A. Notice of Violation
2.
Inspection Report Nos. 50-413/82-07
and 50-414/82-07
cc w/ encl:
J. W. Hampton, Station llanager
J. C. Rogers, Project Manager
bcc w/ encl:
NRC Resident Inspector
Document flanagement Branch
State of South Carolina
RII
RII
RII
R
j
6 cf
<1
PVa)nDoor}n:dt
6$c0
C cf
Alg)6atonis
JCBryan)t
q
F
ng
4//1 /82
4//J/82
4////82
4//j/82 ),h
.