IR 05000412/1979007

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-412/79-07 on 791016-17.No Noncompliance Noted.Major Areas Inspected:Review of QC Program & Observation of Work in Progress on Fabrication & Installation of Piping
ML19257A238
Person / Time
Site: Beaver Valley
Issue date: 11/13/1979
From: Mcgaughy R, Narrow L, Walton G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19257A237 List:
References
50-412-79-07, 50-412-79-7, NUDOCS 8001030158
Download: ML19257A238 (7)


Text

.

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

Report No.

50-412/79-07 Docket No.

50-412 License No.

CPPR-105 Priority

--

Category A

Licensee:

Duquesne Light Company 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Facility Name:

Beaver Valley Power Station, Unit 2 Inspection At:

Shippingport, Pennsylvania Inspection Cond ed:

October 16-19, 1579 Inspectors:

2442

W

"L.

Narr w Reactor Inspector

/ d te

~

G J

Y G; A. Walton, Rs'actc/r Inspector date

'

cate

, C. f M

//hhY Approved by-

., G. W. McGaughy, Chief, Projects Section

/ da'te

/

RC&ES Branch Inspection Summary:

Inspection on October 16-19, 1979 (Report No. 50-412/79-07)

Areas Inspected:

Routine, unannounced inspection by two regional based inspectors which commenced on the 4-12 shift on October 16, 1979.

The inspection covered review of the QC program and observation of work in progress on fabrication and installation of piping; review of structural steel fabrication and erection records; and review of the status of outstanding items.

The inspection involved 42 inspector-hours on site by two regional based inspectors.

Results:

No items of noncompliance were identified.

1666 192 ut1 8001030 '%7

.

=

DETAILS 1.

Persons Contacted Duquesne Light Company (DLC)

  • H. N. Crooks, Assistant Director of Quality Control
  • R. Coupland, Director of Quality Control
  • C. R. Davis, Senior QA Engineer
  • D. W. Denning, Assistant Director of Quality Control D. Gasper, QC Inspector M. Hartman, Training Administrator
  • E. F. Kurtz, Senior QA Engineer J. Long, Inspection Supervisor, Structural A. F. Mosso, QA NDE Specialist D. Rohm, Quality Control Engineer E. Staples, QC Engineer
  • R. J. Swiderski, Superintendent of Construction A. Tselepis, QC Inspector
  • R. Washabaugh, Manager, Quality Assurance Department R. L. Williamson, Quality Control Inspector Stone and Webster (S&W)
  • C. R. Bishop, Superintendent of Construction P. N. Bodine, Supervisor of Document Systems
  • S. M. Dew, Head of SE0 R. Jackson, Assistant Superintendent of Construction
  • A. C. McIntyre, Site Engineering Office Schneider, Incorporated J. Zielinski, Field Engineer The inspectors also interviewed other licensee and contractor personnel during the inspection.
  • denotes those present at the exit interview.

2.

Plant Tour The inspector observed work activities in progress, completed work, and construction status in several areas.

Work items were examined for obvious defects and for noncompliance with regulatory requirements and licensee commitments.

Specific activities observed by the inspector included soap bubble test of containment liner pad leak test channel, 1666 193

.

.

fit up of containment dome liner, repairs to reactor coolant loop piping and welding activities on safety related piping.

No items of noncompliance were identified.

3.

Protective Coating of Containment Liner The inspector observed provisions for spraying a protective coating on the containment liner, discussed inspection requirements and performance with the QC inspector assigned to this work and reviewed calibration records and control of instruments used during inspections of this work.

The inspector observed that the work area was protected, enclosed and heated to maintain the proper environmental control for surface preparations and application of the protective coating.

No items of noncompliance were identified.

4.

Vendor Documentation - Containment Liner and Embedments The inspector audited vendor documentation; including material test reports, certificates of compliance, vendor manufacturing and inspection records and vendor surveillance inspection reports for the following items:

a.

Containment liner plates Assembly 34 Bl and 34 Cl, Group CC-1 b.

Containment embedments PC Marks 1843/1-1848/l and 1854/1-2; Gouveneur Iron Works c.

Structural shapes Mark No. 1038-M1 M2 and M3; PBI Industries These documents were audited for conformance to the requirements of specifications 2 BVS-65, 2 BVS-416 and 2 BVS-412, respectively.

No items of noncompliance were identified.

5.

Containment Liner and Structural Steel Erection Records The inspector interviewed the licensees structural QC inspector and reviewed Inspection Reports S 2100 concerning erection of columns and platform steel at elevation 717'-0" and S-2083 for welding of clip angles at elevaton 717'-0".

These records were reviewed for conformance to the requirements of:

a.

Specification 2 BVS-412, Revision 1, " Structural Steel" b.

Procedure IP-6.3, dated October 30, 1978, " Structural Steel Erection and Bolting" 1666 194

.

The inspector also examined receiving reports and installation records for the first, second and third rir.:s of the containment liner including records of MT and UT examinations and vacuum box tests.

These records were examined for conformance to the requirements of Specification 2 BUS-065, Addendum No. 4, " Reactor Containment Liner and Mat Embedments".

No items of noncompliance were identified.

6.

Qualifications and Training of QC Personnel The inspector reviewed personnel records of selected QC inspectors performing surveillance inspections of installation of the containment liner by PDM and inspection of structural steel erection, welding and application of protective coating on the containment liner.

The records, including education, experience, training, physical examinations and certificates of qualifications, were reviewed for conformance to the requirements of Section 17 of the PSAR.

No items of noncompliance were identified.

7.

Fabricated Tanks The inspector had previously informed the licensee that defects had been identified at another site in tanks supplied by Industrial Piping and Supply Company (IP&S) and had requested that the licensee determine whether that company had supplied any tanks for this project.

Review by S&W had determined that 1P&S had not supplied any tanks for this project.

This information was confirmed by memo 2 BVM-1065 from S&W to DLC.

The inspector had no further questions concerning this matter.

8.

Safety Related Piping-Welding Controls The inspector audited two weld procedures technique sheets and associated procedure qualification tests for compliance with the ASME Boiler and Pressure Vessel Code Section IX, 1971 Edition, including the Winter 1972 Addenda.

The procedures audited were:

Schneider Welding Procedure SPBV115M, Revision 1 and associated procedure qualification tests 760820 and 759456, and 115H, Revision 1 and associated procedure qualification tests 761357.

The following items were reviewed:

a.

To determina whether the weld procedures selected including all essential variables, supplementary essential variables and non-essential variables are in compliance with Section IX of the ASME B&PV Code.

b.

Determine whether each procedure has been qualified in accordance with Section IX of the ASME B&PV code.

l(66 195

c.

Determine whether each procedure qualification test lists the essential variables for the specific welding process and whether the values of these variables are within the limits of Section IX.

d.

Determine whether all mechanical tests required by Section IX have been performed and properly documented.

To verify that the procedure qualification tests are certified by e.

the contractor and that all mechanical test results meet the ASME B&PV code requirements.

All areas reviewed meet the applicable ASME B&PV code,Section IX.

No items of noncompliance were identified.

9.

Repair of Reactor Coolant Loop Piping The inspector audited inspection and repair activities in progress on Class 1 pipe welds to ascertain compliance with the licensee's commitments.

Repair was in progress on the reactor coolant lines 2RC S-275-9-1 and 2RC S-275-6 l.

The following items were reviewed:

The welding procedure used is qualified in accordance with Section

--

IX of the ASME code.

The repair techniques such as grinding, inspecting and welding,

--

including preheat and interpass controls are specified and in compliance with ASME Section III and IX.

Welder qualification for welding procedure being used.

--

Nondestructive examination of the repair is performed in accordance

--

with the ASME Section III code.

Records of repair are included as part of the licensees record.

--

No items of noncompliance were identified.

10. Welding Material Control The inspector audited the sub-contractor's welding controls for compliance with Chapter 17 of the FSAR and Section III and IX of the ASME Boiler and Pressure Vessel Code.

The following items were reviewed:

Determine that the welding contractor had established adequate

--

procedures for storing, distributing and handling of welding materials.

1666 196

.

Determine that welding materials arc identified and traceable to

--

certified test reports.

Reviewed certified mill test report for welding material, Heat

--

numbar 74975, Lot 27681999, E 308-163/32 diameter rod to determine whether ASME code required tests are performed on each lot of Cterial.

Audited by direct observation of welding rod station number 3

--

that welding materials are stored with moisture controls, holding ovens with accurate temperature controls are used and segration of different welding materials is effective.

Audited by direct observation at rod station number 3 that distribu-

--

tion of welding materials are controlled in accordance with the appli-cable procedure and unused welding electrodes are re wrned and placed in holding ovens.

Determined that there are effective controls for limiting electrode

--

moisture pickup.

In each case audited that the welding contractor was controlling moisture pickup by issuing 7018 covered electrodes in portable rod warmers.

All areas reviewed were in accordance with approved procedures.

No items of noncompliance were identified.

11.

Welder Qualification The inspector audited the licensee's controls for qualifying welders in compliance with requirements of the ASME Section IX Code.

The following items were reviewed:

--

Determine whether the welding contractor has a system for maintaining a record of qualification status of all welders and whether this system 's utilized.

The in ractor audited the qualifications of one welder, symbol

--

Fll3, for qualification in the gas tungsten are welding method.

The welder was qualified by radiography on 3/16/79 in the 6G vertical up position.

He is qualified in the thickness of.0625 inch to.436 inches.

His continuing performance records were

'

also reviewed and found acceptable.

All items reviewed met the requiremerits of ASME Section IX and no items of noncompliance were identified.

12.

Noncomformance and Disposition Reports The inspector audited six N&D reports to ascertain that acceptable disposition was made.

The following N&D's were reviewed:

1666 197

.

.

6101, 6103, 6108, 6109, 6110.

The dispositions were in compliance with licensee commitments and no items of noncompliance were identified.

13.

Exit Interview The inspector met with licensee and contractor representativer (denoted in Paragraph 1) at the conclusion of the inspection on October 19, 1979.